83 FR 61631 - Information Collection Request Submitted To OMB for Review and Approval; Comment Request; NESHAP for Industrial, Commercial, and Institutional Boilers and Process Heaters (Renewal)

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 83, Issue 231 (November 30, 2018)

Page Range61631-61632
FR Document2018-26081

The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Industrial, Commercial, and Institutional Boilers and Process Heaters (EPA ICR No. 2028.09, OMB Control No. 2060-0551), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through November 30, 2018. Public comments were previously requested, via the Federal Register, on June 29, 2017, during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Federal Register, Volume 83 Issue 231 (Friday, November 30, 2018)
[Federal Register Volume 83, Number 231 (Friday, November 30, 2018)]
[Notices]
[Pages 61631-61632]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-26081]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2013-0352; FRL-9984-08-OEI]


Information Collection Request Submitted To OMB for Review and 
Approval; Comment Request; NESHAP for Industrial, Commercial, and 
Institutional Boilers and Process Heaters (Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) has submitted an 
information collection request (ICR), NESHAP for Industrial, 
Commercial, and Institutional Boilers and Process Heaters (EPA ICR No. 
2028.09, OMB Control No. 2060-0551), to the Office of Management and 
Budget (OMB) for review and approval in accordance with the Paperwork 
Reduction Act. This is a proposed extension of the ICR, which is 
currently approved through November 30, 2018. Public comments were 
previously requested, via the Federal Register, on June 29, 2017, 
during a 60-day comment period. This notice allows for an additional 30 
days for public comments. A fuller description of the ICR is given 
below, including its estimated burden and cost to the public. An agency 
may neither conduct nor sponsor, and a person is not required to 
respond to, a collection of information unless it displays a currently 
valid OMB control number.

DATES: Additional comments may be submitted on or before December 31, 
2018.

ADDRESSES: Submit your comments, referencing Docket ID Number EPA-HQ-
OECA-2014-0078, to: (1) EPA online using www.regulations.gov (our 
preferred method), or by email to docket.oeca@epa.gov, or by mail to: 
EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 
1200 Pennsylvania Ave. NW, Washington, DC 20460; and (2) OMB via email 
to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer 
for EPA.
    EPA's policy is that all comments received will be included in the 
public docket without change including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI), or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, 
Washington, DC 20460; telephone number: (202) 564-2970; fax number: 
(202) 564-0050; email address: yellin.patrick@epa.gov.

SUPPLEMENTARY INFORMATION: Supporting documents, which explain in 
detail the information that the EPA will be collecting, are available 
in the public docket for this ICR. The docket can be viewed either 
online at www.regulations.gov or in person at the EPA Docket Center, 
WJC West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The 
telephone number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit: http://www.epa.gov/dockets.
    Abstract: The National Emission Standards for Hazardous Air 
Pollutants (NESHAP) for Industrial, Commercial, and Institutional 
Boilers and Process Heaters apply to existing and new industrial, 
commercial, and institutional boilers and process heaters located at 
major sources of HAP. In general, all NESHAP standards require initial 
notifications, performance tests, and periodic reports by the owners/
operators of the affected facilities. They are also required to 
maintain records of the occurrence and duration of any startup, 
shutdown, or malfunction in the operation of an affected facility, or 
any period during which the monitoring system is inoperative. These 
notifications, reports, and records are essential in determining 
compliance with 40 CFR part 63, DDDDD.
    Form Numbers: None.
    Respondents/affected entities: Industrial, commercial, and 
institutional boilers and process heaters.
    Respondent's obligation to respond: Mandatory (40 CFR 63, subpart 
DDDDD).
    Estimated number of respondents: 2,012 (total).
    Frequency of response: Initially, semi-annually, annually, 
biennially, and every five years.
    Total estimated burden: 597,000 hours (per year). Burden is defined 
at 5 CFR 1320.3(b).
    Total estimated cost: $196,000,000 (per year), which includes 
$131,000,000 in annualized capital/startup and/or operation & 
maintenance costs.
    Changes in the Estimates: There is an adjustment increase in the 
total estimated burden as currently identified in the OMB Inventory of 
Approved Burdens. This increase is not due to any program changes. The 
change in burden and cost estimates occurred because there is continued 
growth for certain subcategories of equipment subject to the standard. 
In addition, the standards have been in effect for more than three 
years and the requirements are different during initial compliance (new 
facilities) as compared to on-going compliance (existing facilities). 
The previous ICR reflected those burdens and costs associated with the 
initial activities for subject facilities and provided for the 
timeframe for existing facilities to come into compliance prior to 
January 31, 2016. This included purchasing monitoring equipment, 
conducting initial performance tests, and establishing recordkeeping 
systems. This ICR reflects the on-going burden and costs for existing 
facilities. Activities for existing sources include annual testing, 
continuous monitoring of pollutants, and the submission of semiannual, 
biennial, or five-year reports, as determined for each subcategory.
    There is an adjustment decrease in the number of responses as 
compared with the previous ICR. This decrease is a result of removing 
some of the one-time response requirements for existing sources that 
have already met the initial compliance requirements. There is an 
overall increase in the total capital/startup and annual operation and 
maintenance costs compared with the previous ICR. These changes assume 
all existing sources have met the initial requirements of the rule. In 
addition, there are a small number of new

[[Page 61632]]

facilities that are in the initial compliance phase described above.

Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2018-26081 Filed 11-29-18; 8:45 am]
 BILLING CODE 6560-50-P



                                                                          Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices                                          61631

                                              materials become available. You may                     ADDRESSES:   Submit your comments,                      Respondents/affected entities:
                                              obtain electronic copies of these                       referencing Docket ID Number EPA–                     Industrial, commercial, and institutional
                                              documents, and certain other related                    HQ–OECA–2014–0078, to: (1) EPA                        boilers and process heaters.
                                              documents that might be available at                    online using www.regulations.gov (our                   Respondent’s obligation to respond:
                                              http://www.regulations.gov and the                      preferred method), or by email to                     Mandatory (40 CFR 63, subpart
                                              TSCA SACC website at https://                           docket.oeca@epa.gov, or by mail to: EPA
                                                                                                                                                            DDDDD).
                                              www.epa.gov/tsca-peer-review.                           Docket Center, Environmental
                                                 TSCA SACC will prepare meeting                       Protection Agency, Mail Code 28221T,                    Estimated number of respondents:
                                              minutes and final report summarizing                    1200 Pennsylvania Ave. NW,                            2,012 (total).
                                              its recommendations to the Agency no                    Washington, DC 20460; and (2) OMB via                   Frequency of response: Initially, semi-
                                              later than 90 days after the meeting. The               email to oira_submission@omb.eop.gov.                 annually, annually, biennially, and
                                              meeting minutes and final report will be                Address comments to OMB Desk Officer                  every five years.
                                              posted on the TSCA SACC website and                     for EPA.
                                              in the docket.                                                                                                  Total estimated burden: 597,000
                                                                                                        EPA’s policy is that all comments                   hours (per year). Burden is defined at 5
                                                Authority: 15 U.S.C. 2625(o) et seq.; 5               received will be included in the public
                                                                                                                                                            CFR 1320.3(b).
                                              U.S.C. Appendix 2 et seq.                               docket without change including any
                                                                                                      personal information provided, unless                   Total estimated cost: $196,000,000
                                                Dated: November 21, 2018.
                                                                                                      the comment includes profanity, threats,              (per year), which includes $131,000,000
                                              Stanley Barone, Jr.,
                                                                                                      information claimed to be Confidential                in annualized capital/startup and/or
                                              Acting Director, Office of Science
                                                                                                      Business Information (CBI), or other                  operation & maintenance costs.
                                              Coordination and Policy.
                                                                                                      information whose disclosure is                         Changes in the Estimates: There is an
                                              [FR Doc. 2018–26084 Filed 11–29–18; 8:45 am]
                                                                                                      restricted by statute.                                adjustment increase in the total
                                              BILLING CODE 6560–50–P
                                                                                                      FOR FURTHER INFORMATION CONTACT:                      estimated burden as currently identified
                                                                                                      Patrick Yellin, Monitoring, Assistance,               in the OMB Inventory of Approved
                                              ENVIRONMENTAL PROTECTION                                and Media Programs Division, Office of                Burdens. This increase is not due to any
                                              AGENCY                                                  Compliance, Mail Code 2227A,                          program changes. The change in burden
                                                                                                      Environmental Protection Agency, 1200                 and cost estimates occurred because
                                              [EPA–HQ–OECA–2013–0352; FRL–9984–
                                              08–OEI]                                                 Pennsylvania Ave. NW, Washington, DC                  there is continued growth for certain
                                                                                                      20460; telephone number: (202) 564–                   subcategories of equipment subject to
                                              Information Collection Request                          2970; fax number: (202) 564–0050;                     the standard. In addition, the standards
                                              Submitted To OMB for Review and                         email address: yellin.patrick@epa.gov.                have been in effect for more than three
                                              Approval; Comment Request; NESHAP                       SUPPLEMENTARY INFORMATION:                            years and the requirements are different
                                              for Industrial, Commercial, and                         Supporting documents, which explain                   during initial compliance (new
                                              Institutional Boilers and Process                       in detail the information that the EPA                facilities) as compared to on-going
                                              Heaters (Renewal)                                       will be collecting, are available in the              compliance (existing facilities). The
                                              AGENCY: Environmental Protection                        public docket for this ICR. The docket                previous ICR reflected those burdens
                                              Agency (EPA).                                           can be viewed either online at                        and costs associated with the initial
                                                                                                      www.regulations.gov or in person at the               activities for subject facilities and
                                              ACTION: Notice.
                                                                                                      EPA Docket Center, WJC West, Room                     provided for the timeframe for existing
                                              SUMMARY:   The Environmental Protection                 3334, 1301 Constitution Ave. NW,                      facilities to come into compliance prior
                                              Agency (EPA) has submitted an                           Washington, DC. The telephone number                  to January 31, 2016. This included
                                              information collection request (ICR),                   for the Docket Center is 202–566–1744.                purchasing monitoring equipment,
                                              NESHAP for Industrial, Commercial,                      For additional information about EPA’s                conducting initial performance tests,
                                              and Institutional Boilers and Process                   public docket, visit: http://                         and establishing recordkeeping systems.
                                              Heaters (EPA ICR No. 2028.09, OMB                       www.epa.gov/dockets.                                  This ICR reflects the on-going burden
                                              Control No. 2060–0551), to the Office of                  Abstract: The National Emission                     and costs for existing facilities.
                                              Management and Budget (OMB) for                         Standards for Hazardous Air Pollutants                Activities for existing sources include
                                              review and approval in accordance with                  (NESHAP) for Industrial, Commercial,                  annual testing, continuous monitoring
                                              the Paperwork Reduction Act. This is a                  and Institutional Boilers and Process                 of pollutants, and the submission of
                                              proposed extension of the ICR, which is                 Heaters apply to existing and new                     semiannual, biennial, or five-year
                                              currently approved through November                     industrial, commercial, and institutional             reports, as determined for each
                                              30, 2018. Public comments were                          boilers and process heaters located at
                                                                                                                                                            subcategory.
                                              previously requested, via the Federal                   major sources of HAP. In general, all
                                              Register, on June 29, 2017, during a 60-                NESHAP standards require initial                        There is an adjustment decrease in the
                                              day comment period. This notice allows                  notifications, performance tests, and                 number of responses as compared with
                                              for an additional 30 days for public                    periodic reports by the owners/                       the previous ICR. This decrease is a
                                              comments. A fuller description of the                   operators of the affected facilities. They            result of removing some of the one-time
                                              ICR is given below, including its                       are also required to maintain records of              response requirements for existing
                                              estimated burden and cost to the public.                the occurrence and duration of any                    sources that have already met the initial
                                              An agency may neither conduct nor                       startup, shutdown, or malfunction in                  compliance requirements. There is an
amozie on DSK3GDR082PROD with NOTICES1




                                              sponsor, and a person is not required to                the operation of an affected facility, or             overall increase in the total capital/
                                              respond to, a collection of information                 any period during which the monitoring                startup and annual operation and
                                              unless it displays a currently valid OMB                system is inoperative. These                          maintenance costs compared with the
                                              control number.                                         notifications, reports, and records are               previous ICR. These changes assume all
                                              DATES: Additional comments may be                       essential in determining compliance                   existing sources have met the initial
                                              submitted on or before December 31,                     with 40 CFR part 63, DDDDD.                           requirements of the rule. In addition,
                                              2018.                                                     Form Numbers: None.                                 there are a small number of new


                                         VerDate Sep<11>2014   17:00 Nov 29, 2018   Jkt 247001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\30NON1.SGM   30NON1


                                              61632                       Federal Register / Vol. 83, No. 231 / Friday, November 30, 2018 / Notices

                                              facilities that are in the initial                        Ends: 01/14/2019, Contact: Rain                     follow the instructions at http://
                                              compliance phase described above.                         Emerson 559–262–0335.                               www.epa.gov/dockets/contacts.html.
                                                                                                      EIS No. 20180291, Draft, BLM, UT, The                 Additional instructions on commenting
                                              Courtney Kerwin,
                                                                                                        Sevier Playa Potash Project, Utah,                  or visiting the docket, along with more
                                              Director, Regulatory Support Division.                    Comment Period Ends: 01/14/2019,                    information about dockets generally, are
                                              [FR Doc. 2018–26081 Filed 11–29–18; 8:45 am]              Contact: Clara Stevens 435–743–3119.                available at http://www.epa.gov/
                                              BILLING CODE 6560–50–P
                                                                                                        Dated: November 27, 2018.                           dockets.
                                                                                                      Robert Tomiak,                                        FOR FURTHER INFORMATION CONTACT:
                                              ENVIRONMENTAL PROTECTION                                Director, Office of Federal Activities.                  For pesticide specific information
                                              AGENCY                                                  [FR Doc. 2018–26074 Filed 11–29–18; 8:45 am]          contact: The Chemical Review Manager
                                                                                                      BILLING CODE 6560–50–P                                for the pesticide of interest identified in
                                              [ER–FRL–9042–6]
                                                                                                                                                            the Table in Unit IV.
                                              Environmental Impact Statements;                                                                                 For general questions on the
                                                                                                      ENVIRONMENTAL PROTECTION                              registration review program, contact:
                                              Notice of Availability
                                                                                                      AGENCY                                                Dana Friedman, Pesticide Re-Evaluation
                                                Responsible Agency: Office of Federal                 [EPA–HQ–OPP–2017–0720; FRL–9985–63]                   Division (7508P), Office of Pesticide
                                              Activities, General Information 202–                                                                          Programs, Environmental Protection
                                              564–5632 or https://www.epa.gov/                        Registration Review; Draft Human                      Agency, 1200 Pennsylvania Ave. NW,
                                              nepa/.                                                  Health and/or Ecological Risk                         Washington, DC 20460–0001; telephone
                                              Weekly receipt of Environmental Impact                  Assessments for Several Pesticides;                   number: (703) 347–8827; email address:
                                                Statements                                            Notice of Availability                                friedman.dana@epa.gov.
                                              Filed 11/19/2018 Through 11/23/2018                                                                           SUPPLEMENTARY INFORMATION:
                                                                                                      AGENCY: Environmental Protection
                                              Pursuant to 40 CFR 1506.9.
                                                                                                      Agency (EPA).                                         I. General Information
                                                Notice: Section 309(a) of the Clean Air               ACTION: Notice.
                                              Act requires that EPA make public its                                                                         A. Does this action apply to me?
                                              comments on EISs issued by other                        SUMMARY:    This notice announces the                   This action is directed to the public
                                              Federal agencies. EPA’s comment letters                 availability of EPA’s draft human health              in general, and may be of interest to a
                                              on EISs are available at: https://                      and ecological risk assessments for the               wide range of stakeholders including
                                              cdxnodengn.epa.gov/cdx-enepa-public/                    registration review of amitraz,                       environmental, human health, farm
                                              action/eis/search.                                      bispyribac-sodium, bromoxynil, captan,                worker, and agricultural advocates; the
                                              EIS No. 20180284, Draft Supplement,                     chloropicrin, dazomet, diclosulam,                    chemical industry; pesticide users; and
                                                USFS, MT, Stonewall Vegetation                        florasulam, flucarbazone-sodium,                      members of the public interested in the
                                                Project, Comment Period Ends: 01/14/                  fluroxypyr, formetanate, imazalil,                    sale, distribution, or use of pesticides.
                                                2019, Contact: Laura Conway 406–                      imazamox, imazapic, imazaquin,                        Since others also may be interested, the
                                                791–7739.                                             imazethapyr, MCPA, metam sodium,                      Agency has not attempted to describe all
                                              EIS No. 20180285, Draft, USFWS, WA,                     metam potassium, methyl                               the specific entities that may be affected
                                                Skookumchuck Wind Energy Project                      isothiocyanate (MITC), o-benzyl-p-                    by this action. If you have any questions
                                                Proposed Habitat Conservation Plan                    chlorophenol, starlicide, tri-n butyl                 regarding the applicability of this action
                                                and Incidental Take Permit for                        tetradecyl phosphonium chloride                       to a particular entity, consult the
                                                Marbled Murrelet, Bald Eagle, and                     (TTPC), triphenyltin hydroxide (TPTH),                Chemical Review Manager identified in
                                                Golden Eagle, Lewis and Thurston                      and zinc salts. This notice also                      the Table in Unit IV.
                                                Counties, Washington, Comment                         announces the availability of EPA’s
                                                Period Ends: 01/14/2019, Contact:                     draft human health risk assessments for               B. What should I consider as I prepare
                                                Tim Romanski 360–753–5823.                            the registration review of para-                      my comments for EPA?
                                              EIS No. 20180286, Draft, BLM, ID,                       dichlorobenzene and penoxsulam.                          1. Submitting CBI. Do not submit this
                                                Caldwell Canyon Mine and                              DATES: Comments must be received on                   information to EPA through
                                                Reclamation Plan, Comment Period                      or before January 29, 2019.                           regulations.gov or email. Clearly mark
                                                Ends: 01/14/2019, Contact: Bill Volk                  ADDRESSES: Submit your comments, to                   the part or all of the information that
                                                208–236–7503.                                         the docket identification (ID) number for             you claim to be CBI. For CBI
                                              EIS No. 20180287, Final, UDOT, UT, I–                   the specific pesticide of interest                    information in a disk or CD–ROM that
                                                15, Payson Main Street Interchange,                   provided in the Table in Unit IV, by one              you mail to EPA, mark the outside of the
                                                Review Period Ends: 12/31/2018,                       of the following methods:                             disk or CD–ROM as CBI and then
                                                Contact: Naomi Kisen 801–965–4005.                       • Federal eRulemaking Portal: http://              identify electronically within the disk or
                                              EIS No. 20180288, Final, OSM, MT,                       www.regulations.gov. Follow the online                CD–ROM the specific information that
                                                Western Energy Company’s Rosebud                      instructions for submitting comments.                 is claimed as CBI. In addition to one
                                                Mine Area F, Review Period Ends:                      Do not submit electronically any                      complete version of the comment that
                                                12/31/2018, Contact: Logan Sholar                     information you consider to be                        includes information claimed as CBI, a
                                                303–293–5036.                                         Confidential Business Information (CBI)               copy of the comment that does not
                                              EIS No. 20180289, Draft, USFS, AZ,                      or other information whose disclosure is              contain the information claimed as CBI
                                                Fossil Creek Wild and Scenic River                    restricted by statute.                                must be submitted for inclusion in the
amozie on DSK3GDR082PROD with NOTICES1




                                                Comprehensive River Management                           • Mail: OPP Docket, Environmental                  public docket. Information so marked
                                                Plan, Comment Period Ends: 02/28/                     Protection Agency Docket Center (EPA/                 will not be disclosed except in
                                                2019, Contact: Marcos Roybal 928–                     DC), (28221T), 1200 Pennsylvania Ave.                 accordance with procedures set forth in
                                                203–2915.                                             NW, Washington, DC 20460–0001.                        40 CFR part 2.
                                              EIS No. 20180290, Draft, BR, CA,                           • Hand Delivery: To make special                      2. Tips for preparing your comments.
                                                Mendota Pool Group 20-Year                            arrangements for hand delivery or                     When preparing and submitting your
                                                Exchange Program, Comment Period                      delivery of boxed information, please                 comments, see the commenting tips at


                                         VerDate Sep<11>2014   17:00 Nov 29, 2018   Jkt 247001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\30NON1.SGM   30NON1



Document Created: 2018-11-30 04:36:25
Document Modified: 2018-11-30 04:36:25
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesAdditional comments may be submitted on or before December 31, 2018.
ContactPatrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564-2970; fax number:
FR Citation83 FR 61631 