83_FR_6200 83 FR 6170 - Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions; Moriah Hydro Corporation

83 FR 6170 - Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions; Moriah Hydro Corporation

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 30 (February 13, 2018)

Page Range6170-6171
FR Document2018-02847

Federal Register, Volume 83 Issue 30 (Tuesday, February 13, 2018)
[Federal Register Volume 83, Number 30 (Tuesday, February 13, 2018)]
[Notices]
[Pages 6170-6171]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-02847]



[[Page 6170]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12635-002]


Notice of Application Ready for Environmental Analysis, and 
Soliciting Comments, Recommendations, Terms and Conditions, and 
Prescriptions; Moriah Hydro Corporation

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License.
    b. Project No.: 12635-002.
    c. Date Filed: February 13, 2015.
    d. Applicant: Moriah Hydro Corporation.
    e. Name of Project: Mineville Energy Storage Project.
    f. Location: The project would be located in an abandoned 
subterranean mine complex \1\ in the town of Moriah, Essex County, New 
York. No federal lands are occupied by project works or located within 
the project boundary.
---------------------------------------------------------------------------

    \1\ The existing mine complex is composed of the interconnected 
Old Bed, Bonanza open pit, and Harmony mines.
---------------------------------------------------------------------------

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: James A. Besha, President, Moriah Hydro 
Corporation, c/o Albany Engineering Corporation, 5 Washington Square, 
Albany, New York 12205, (518) 456-7712.
    i. FERC Contact: Chris Millard (202) 502-8256 or 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-12635-002.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is now ready for 
environmental analysis.
    l. The proposed project consists of: (1) An upper reservoir located 
within the upper portion of the mine between elevations 495 and 1,095 
feet above mean seal level (msl), with a surface area of 4 acres and a 
storage capacity of 2,448 acre-feet; (2) a lower reservoir in the lower 
portion of the mine between elevations -1,075 and -1,555 feet msl, with 
a surface area of 5.1 acres and a storage capacity of 2,448 acre-feet; 
(3) a 14-foot-diameter and 2,955-foot-long upper reservoir shaft 
connecting the upper reservoir to the high-pressure penstock located 
below the powerhouse chamber floor; (4) a 14-foot-diameter and 2,955-
foot-long lower reservoir shaft connecting the lower reservoir and the 
lower reservoir ventilation tunnel; (5) two 6-foot-diameter emergency 
evacuation shafts located between the powerhouse chamber and the 
electrical equipment chamber; (6) a 25-foot-diameter main shaft 
extending 2, 955 feet from the surface down to the powerhouse chamber; 
(7) 15-foot-diameter high- and low-pressure steel penstocks embedded 
beneath the powerhouse chamber floor; (8) a 320-foot-long by 80-foot-
wide powerhouse chamber, containing 100 reversible pump-turbine units, 
each with a nameplate generating capacity of 2.4 megawatts; (9) a 274-
foot-long by 36-foot-wide underground electrical equipment chamber 
adjacent to the powerhouse chamber; (10) an inclined electrical tunnel 
connecting the electrical equipment chamber to a new 115-kilovolt (kV) 
substation constructed adjacent to an existing single circuit 115-kV 
transmission line located about one horizontal mile from the 
underground powerhouse chamber; and (11) appurtenant facilities. The 
project would operate as a closed-loop system to meet energy demands 
and grid control requirements. The project would have an average annual 
generation of 421 gigawatt-hours (GWh). The average pumping power used 
by the project would be 554 GWh.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or 
PRESCRIPTIONS; (2) set forth in the heading the name of the applicant 
and the project number of the application to which the filing responds; 
(3) furnish the name, address, and telephone number of the person 
submitting the filing; and (4) otherwise comply with the requirements 
of 18 CFR 385.2001 through 385.2005. All comments, recommendations, 
terms and conditions or prescriptions must set forth their evidentiary 
basis and otherwise comply with the requirements of 18 CFR 4.34(b). 
Agencies may obtain copies of the application directly from the 
applicant. Each filing must be accompanied by proof of service on all 
persons listed on the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Public notice of the filing of the initial development 
application, which has already been given, established the due date for 
filing competing applications or notices of intent. Under the 
Commission's regulations, any competing development application must be 
filed in response to and in compliance with public notice of the 
initial development application. No competing applications or notices 
of intent may be filed in response to this notice.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    p. Procedural Schedule:

[[Page 6171]]

    The application will be processed according to the following 
revised Hydro Licensing Schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Filing of comments, recommendations,     April 2018.
 terms and conditions, and
 prescriptions.
Reply comments due.....................  May 2018.
Commission issues Draft EA.............  October 2018.
Comments on Draft EA...................  November 2018.
Commission issues Final EA.............  March 2019.
------------------------------------------------------------------------


    Dated: February 5, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02847 Filed 2-12-18; 8:45 am]
BILLING CODE 6717-01-P



                                                6170                        Federal Register / Vol. 83, No. 30 / Tuesday, February 13, 2018 / Notices

                                                DEPARTMENT OF ENERGY                                    First Street NE, Washington, DC 20426.                pumping power used by the project
                                                                                                        The first page of any filing should                   would be 554 GWh.
                                                Federal Energy Regulatory                               include docket number P–12635–002.                       m. A copy of the application is
                                                Commission                                                The Commission’s Rules of Practice                  available for review at the Commission
                                                                                                        require all intervenors filing documents              in the Public Reference Room or may be
                                                [Project No. 12635–002]
                                                                                                        with the Commission to serve a copy of                viewed on the Commission’s website at
                                                Notice of Application Ready for                         that document on each person on the                   http://www.ferc.gov using the eLibrary
                                                Environmental Analysis, and Soliciting                  official service list for the project.                link. Enter the docket number excluding
                                                Comments, Recommendations, Terms                        Further, if an intervenor files comments              the last three digits in the docket
                                                and Conditions, and Prescriptions;                      or documents with the Commission                      number field to access the document.
                                                Moriah Hydro Corporation                                relating to the merits of an issue that               For assistance, contact FERC Online
                                                                                                        may affect the responsibilities of a                  Support. A copy is also available for
                                                   Take notice that the following                       particular resource agency, they must                 inspection and reproduction at the
                                                hydroelectric application has been filed                also serve a copy of the document on                  address in item h above.
                                                with the Commission and is available                    that resource agency.                                    All filings must (1) bear in all capital
                                                for public inspection.                                    k. This application has been accepted               letters the title COMMENTS, REPLY
                                                   a. Type of Application: Original Major               and is now ready for environmental                    COMMENTS, RECOMMENDATIONS,
                                                License.                                                                                                      TERMS AND CONDITIONS, or
                                                                                                        analysis.
                                                   b. Project No.: 12635–002.                                                                                 PRESCRIPTIONS; (2) set forth in the
                                                                                                          l. The proposed project consists of: (1)
                                                   c. Date Filed: February 13, 2015.                                                                          heading the name of the applicant and
                                                                                                        An upper reservoir located within the
                                                   d. Applicant: Moriah Hydro                                                                                 the project number of the application to
                                                                                                        upper portion of the mine between                     which the filing responds; (3) furnish
                                                Corporation.
                                                                                                        elevations 495 and 1,095 feet above                   the name, address, and telephone
                                                   e. Name of Project: Mineville Energy
                                                                                                        mean seal level (msl), with a surface                 number of the person submitting the
                                                Storage Project.
                                                                                                        area of 4 acres and a storage capacity of             filing; and (4) otherwise comply with
                                                   f. Location: The project would be
                                                                                                        2,448 acre-feet; (2) a lower reservoir in             the requirements of 18 CFR 385.2001
                                                located in an abandoned subterranean
                                                                                                        the lower portion of the mine between                 through 385.2005. All comments,
                                                mine complex 1 in the town of Moriah,
                                                                                                        elevations ¥1,075 and ¥1,555 feet msl,                recommendations, terms and conditions
                                                Essex County, New York. No federal
                                                                                                        with a surface area of 5.1 acres and a                or prescriptions must set forth their
                                                lands are occupied by project works or
                                                                                                        storage capacity of 2,448 acre-feet; (3) a            evidentiary basis and otherwise comply
                                                located within the project boundary.
                                                                                                        14-foot-diameter and 2,955-foot-long                  with the requirements of 18 CFR 4.34(b).
                                                   g. Filed Pursuant to: Federal Power
                                                                                                        upper reservoir shaft connecting the                  Agencies may obtain copies of the
                                                Act 16 U.S.C. 791(a)–825(r).
                                                                                                        upper reservoir to the high-pressure                  application directly from the applicant.
                                                   h. Applicant Contact: James A. Besha,
                                                                                                        penstock located below the powerhouse                 Each filing must be accompanied by
                                                President, Moriah Hydro Corporation,
                                                                                                        chamber floor; (4) a 14-foot-diameter                 proof of service on all persons listed on
                                                c/o Albany Engineering Corporation, 5
                                                                                                        and 2,955-foot-long lower reservoir shaft             the service list prepared by the
                                                Washington Square, Albany, New York
                                                                                                        connecting the lower reservoir and the                Commission in this proceeding, in
                                                12205, (518) 456–7712.
                                                                                                        lower reservoir ventilation tunnel; (5)               accordance with 18 CFR 4.34(b) and
                                                   i. FERC Contact: Chris Millard (202)
                                                                                                        two 6-foot-diameter emergency                         385.2010.
                                                502–8256 or christopher.millard@
                                                                                                        evacuation shafts located between the                    You may also register online at http://
                                                ferc.gov.
                                                                                                        powerhouse chamber and the electrical                 www.ferc.gov/docs-filing/
                                                   j. Deadline for filing comments,
                                                                                                        equipment chamber; (6) a 25-foot-                     esubscription.asp to be notified via
                                                recommendations, terms and
                                                                                                        diameter main shaft extending 2, 955                  email of new filings and issuances
                                                conditions, and prescriptions: 60 days
                                                                                                        feet from the surface down to the                     related to this or other pending projects.
                                                from the issuance date of this notice;
                                                                                                        powerhouse chamber; (7) 15-foot-                      For assistance, contact FERC Online
                                                reply comments are due 105 days from
                                                                                                        diameter high- and low-pressure steel                 Support.
                                                the issuance date of this notice.
                                                                                                        penstocks embedded beneath the                           n. Public notice of the filing of the
                                                   The Commission strongly encourages
                                                                                                        powerhouse chamber floor; (8) a 320-                  initial development application, which
                                                electronic filing. Please file comments,
                                                                                                        foot-long by 80-foot-wide powerhouse                  has already been given, established the
                                                recommendations, terms and
                                                                                                        chamber, containing 100 reversible                    due date for filing competing
                                                conditions, and prescriptions using the
                                                                                                        pump-turbine units, each with a                       applications or notices of intent. Under
                                                Commission’s eFiling system at http://
                                                                                                        nameplate generating capacity of 2.4                  the Commission’s regulations, any
                                                www.ferc.gov/docs-filing/efiling.asp.
                                                                                                        megawatts; (9) a 274-foot-long by 36-                 competing development application
                                                Commenters can submit brief comments
                                                                                                        foot-wide underground electrical                      must be filed in response to and in
                                                up to 6,000 characters, without prior
                                                                                                        equipment chamber adjacent to the                     compliance with public notice of the
                                                registration, using the eComment system
                                                                                                        powerhouse chamber; (10) an inclined                  initial development application. No
                                                at http://www.ferc.gov/docs-filing/
                                                                                                        electrical tunnel connecting the                      competing applications or notices of
                                                ecomment.asp. You must include your
                                                                                                        electrical equipment chamber to a new                 intent may be filed in response to this
                                                name and contact information at the end
                                                                                                        115-kilovolt (kV) substation constructed              notice.
                                                of your comments. For assistance,
                                                                                                        adjacent to an existing single circuit                   o. A license applicant must file no
                                                please contact FERC Online Support at
                                                                                                        115-kV transmission line located about                later than 60 days following the date of
                                                FERCOnlineSupport@ferc.gov, (866)
                                                                                                        one horizontal mile from the
sradovich on DSK3GMQ082PROD with NOTICES




                                                208–3676 (toll free), or (202) 502–8659                                                                       issuance of this notice: (1) A copy of the
                                                                                                        underground powerhouse chamber; and                   water quality certification; (2) a copy of
                                                (TTY). In lieu of electronic filing, please
                                                                                                        (11) appurtenant facilities. The project              the request for certification, including
                                                send a paper copy to: Secretary, Federal
                                                                                                        would operate as a closed-loop system                 proof of the date on which the certifying
                                                Energy Regulatory Commission, 888
                                                                                                        to meet energy demands and grid                       agency received the request; or (3)
                                                  1 The existing mine complex is composed of the        control requirements. The project would               evidence of waiver of water quality
                                                interconnected Old Bed, Bonanza open pit, and           have an average annual generation of                  certification.
                                                Harmony mines.                                          421 gigawatt-hours (GWh). The average                    p. Procedural Schedule:


                                           VerDate Sep<11>2014   23:12 Feb 12, 2018   Jkt 244001   PO 00000   Frm 00012   Fmt 4703   Sfmt 4703   E:\FR\FM\13FEN1.SGM   13FEN1


                                                                            Federal Register / Vol. 83, No. 30 / Tuesday, February 13, 2018 / Notices                                                         6171

                                                  The application will be processed                         The Commission strongly encourages                 the last three digits in the docket
                                                according to the following revised                       electronic filing. Please file scoping                number field to access the document.
                                                Hydro Licensing Schedule. Revisions to                   comments using the Commission’s                       For assistance, contact FERC Online
                                                the schedule may be made as                              eFiling system at http://www.ferc.gov/                Support. A copy is also available for
                                                appropriate.                                             docs-filing/efiling.asp. Commenters can               inspection and reproduction at the
                                                                                                         submit brief comments up to 6,000                     address in item h above.
                                                         Milestone                    Target date        characters, without prior registration,                 You may also register online at http://
                                                                                                         using the eComment system at http://                  www.ferc.gov/docs-filing/
                                                Filing of comments, rec-        April 2018.              www.ferc.gov/docs-filing/                             esubscription.asp to be notified via
                                                   ommendations, terms                                   ecomment.asp. You must include your                   email of new filings and issuances
                                                   and conditions, and pre-
                                                   scriptions.
                                                                                                         name and contact information at the end               related to this or other pending projects.
                                                Reply comments due .......      May 2018.                of your comments. For assistance,                     For assistance, contact FERC Online
                                                Commission issues Draft         October 2018.            please contact FERC Online Support at                 Support.
                                                   EA.                                                   FERCOnlineSupport@ferc.gov, (866)                       n. Scoping Process
                                                Comments on Draft EA ....       November 2018.           208–3676 (toll free), or (202) 502–8659                 The Commission intends to prepare
                                                Commission issues Final         March 2019.              (TTY). In lieu of electronic filing, please           an environmental assessment (EA) in
                                                   EA.                                                   send a paper copy to: Secretary, Federal              cooperation with the Corps 1 on the
                                                                                                         Energy Regulatory Commission, 888                     project in accordance with the National
                                                  Dated: February 5, 2018.                               First Street NE, Washington, DC 20426.                Environmental Policy Act. The EA will
                                                Kimberly D. Bose,                                        The first page of any filing should                   consider both site-specific and
                                                Secretary.                                               include docket number P–14795–002.                    cumulative environmental impacts and
                                                                                                            The Commission’s Rules of Practice                 reasonable alternatives to the proposed
                                                [FR Doc. 2018–02847 Filed 2–12–18; 8:45 am]
                                                                                                         and Procedure require all interveners                 action.
                                                BILLING CODE 6717–01–P
                                                                                                         filing documents with the Commission
                                                                                                         to serve a copy of that document on                   Scoping Meetings
                                                                                                         each person on the official service list                FERC staff will conduct one agency
                                                DEPARTMENT OF ENERGY                                                                                           scoping meeting and one public
                                                                                                         for the project. Further, if an intervener
                                                Federal Energy Regulatory                                files comments or documents with the                  meeting. The agency scoping meeting
                                                Commission                                               Commission relating to the merits of an               will focus on resource agency and non-
                                                                                                         issue that may affect the responsibilities            governmental organization (NGO)
                                                [Project No. 14795–002]                                  of a particular resource agency, they                 concerns, while the public scoping
                                                                                                         must also serve a copy of the document                meeting is primarily for public input.
                                                Notice of Scoping Meetings and                           on that resource agency.                              All interested individuals,
                                                Environmental Site Review and                               k. This application is not ready for               organizations, and agencies are invited
                                                Soliciting Scoping Comments; Shell                       environmental analysis at this time.                  to attend one or both of the meetings,
                                                Energy North America (US), L.P.                             l. The proposed project would utilize              and to assist the staff in identifying the
                                                   Take notice that the following                        the Corps’ existing Rufus Woods Lake                  scope of the environmental issues that
                                                hydroelectric applications have been                     Reservoir, and would consist of the                   should be analyzed in the EA. The times
                                                filed with Commission and are available                  following new facilities: (1) A 300-foot-             and locations of these meetings are as
                                                for public inspection:                                   diameter, 20-foot-tall lined corrugated               follows:
                                                   a. Type of Application: Original major                steel tank upper reservoir with a storage
                                                                                                         capacity of 26.5 acre-feet; (2) a 3-foot-             Agency Scoping Meeting
                                                license.
                                                   b. Project No.: 14795–002.                            diameter, 3,400-foot-long above-ground                  Date: March 7, 2018.
                                                   c. Date Filed: November 1, 2017.                      carbon steel penstock transitioning to a                Time: 9:00 a.m. (PST).
                                                   d. Applicant: Shell Energy North                      3-foot-diameter, 2,700-foot-long buried                 Place: Howard’s on the River.
                                                America (US), L.P.                                       carbon steel penstock; (3) a 77-foot-long,              Address: 245 Lakeshore Drive,
                                                   e. Name of Project: Hydro Battery                     77-foot-wide structural steel power                   Pateros, WA 98846.
                                                Pearl Hill Pumped Storage Project.                       platform housing five 2,400 horsepower                Public Scoping Meeting
                                                   f. Location: On the Columbia River                    vertical turbine pumps, one 5 megawatt
                                                and Rufus Woods Lake, near Bridgeport,                   twin-jet Pelton turbine and synchronous                  Date: March 7, 2018.
                                                                                                         generator, and accompanying electrical                   Time: 6:00 p.m. (PST).
                                                Douglas County, Washington. The upper                                                                             Place: Howard’s on the River.
                                                reservoir and penstock would be located                  equipment; (4) five vertical turbine                     Address: 245 Lakeshore Drive,
                                                on state lands, while the lower reservoir                pump intakes, each fitted with a 27-                  Pateros, WA 98846.
                                                and power generation and pumping                         inch-diameter by 94-inch-long T-style                    Copies of the Scoping Document
                                                equipment would be located on Rufus                      fish screen; (5) a 2,500-foot-long, 24.9-             (SD1) outlining the subject areas to be
                                                Woods Lake, a reservoir operated by the                  kilovolt transmission line. which would               addressed in the EA were distributed to
                                                Army Corps of Engineers (Corps).                         be partially buried and partially affixed             the parties on the Commission’s mailing
                                                   g. Filed Pursuant to: Federal Power                   to the penstock, interconnecting to an                list. Copies of the SD1 will be available
                                                Act, 16 U.S.C. 791(a)–825(r).                            existing non-project transmission line;               at the scoping meeting or may be
                                                   h. Applicant Contact: Kent Watt,                      (6) approximately 3,847 feet of gravel                viewed on the web at http://
                                                Shell US Hosting Company, Shell                          project access road; and (7) appurtenant              www.ferc.gov using the eLibrary link
sradovich on DSK3GMQ082PROD with NOTICES




                                                Woodcreek Office, 150 North Dairy                        facilities. The average annual generation             (see item m above).
                                                Ashford, Houston, TX 77079, (832) 337–                   is estimated to be 24 gigawatt-hours.
                                                1160, kent.watt@shell.com.                                  m. A copy of the application is                    Environmental Site Review
                                                   i. FERC Contact: Ryan Hansen, 888                     available for review at the Commission                  The Applicant and FERC staff will
                                                1st St. NE, Washington, DC 20426, (202)                  in the Public Reference Room or may be                conduct a project environmental site
                                                502–8074, ryan.hansen@ferc.gov.                          viewed on the Commission’s website at
                                                   j. Deadline for Filing Scoping                        http://www.ferc.gov using the eLibrary                  1 In a letter filed on January 24, 2018, the Corps

                                                Comments: April 6, 2018.                                 link. Enter the docket number excluding               requested cooperating agency status.



                                           VerDate Sep<11>2014   23:12 Feb 12, 2018   Jkt 244001    PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\13FEN1.SGM   13FEN1



Document Created: 2018-02-13 02:32:21
Document Modified: 2018-02-13 02:32:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106: