83_FR_63384 83 FR 63149 - Cardinal-Hickory Creek 345-kV Transmission Line Project

83 FR 63149 - Cardinal-Hickory Creek 345-kV Transmission Line Project

DEPARTMENT OF AGRICULTURE
Rural Utilities Service

Federal Register Volume 83, Issue 235 (December 7, 2018)

Page Range63149-63151
FR Document2018-26558

Notice is hereby given that the Rural Utilities Service (RUS) has prepared a Draft Environmental Impact Statement (EIS) to meet its responsibilities under the National Environmental Policy Act (NEPA) and environmental policies and procedures related to providing financial assistance to Dairyland Power Cooperative (DPC). Further, in accordance with section 106 of the National Historic Preservation Act (NHPA) and pursuant to the regulations participation in the section 106 process and coordination with the National Environmental Policy Act, RUS is using its procedures for public involvement under NEPA to meet its responsibilities to solicit and consider the views of the public during the section 106 review for the proposed project. RUS would be providing financial assistance to DPC for its share in the construction of a proposed 345-kilovolt (kV) transmission line and associated infrastructure connecting the Hickory Creek Substation in Dubuque County, Iowa, with the Cardinal Substation in the Town of Middleton, Wisconsin (near Madison, Wisconsin). The Project also includes a new intermediate 345/138-kV substation near the Village of Montfort in either Grant County or Iowa County, Wisconsin. The total length of the 345- kV transmission lines associated with the proposed project will be approximately 125 miles. DPC and the other project participants have identified proposed and alternate segments and locations for transmission lines and associated facilities and for the intermediate substation. Dairyland Power Cooperative is requesting RUS to provide financing for its portion of the proposed project. DPC is participating in the proposed project with two other utilities, American Transmission Company LLC, and ITC Midwest LLC (Utilities). The purpose of the proposed project is to: Address reliability issues on the regional bulk transmission system, alleviate congestion that occurs in certain parts of the transmission system and remove constraints that limit the delivery of power, expand the access of the transmission system to additional resources, increase the transfer capability of the electrical system between Iowa and Wisconsin, reduce the losses in transferring power and increase the efficiency of the transmission system, and respond to public policy objectives aimed at enhancing the nation's transmission system and to support the changing generation mix. A more detailed explanation of the purpose and need for the project can be found in the Draft EIS.

Federal Register, Volume 83 Issue 235 (Friday, December 7, 2018)
[Federal Register Volume 83, Number 235 (Friday, December 7, 2018)]
[Notices]
[Pages 63149-63151]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-26558]


-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Rural Utilities Service


Cardinal-Hickory Creek 345-kV Transmission Line Project

AGENCY: Rural Utilities Service, USDA.

ACTION: Notice of availability of a draft environmental impact 
statement; notice of public meetings; and section 106 notification to 
the public.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given that the Rural Utilities Service (RUS) 
has prepared a Draft Environmental Impact Statement (EIS) to meet its 
responsibilities under the National Environmental Policy Act (NEPA) and 
environmental policies and procedures related to providing financial 
assistance

[[Page 63150]]

to Dairyland Power Cooperative (DPC). Further, in accordance with 
section 106 of the National Historic Preservation Act (NHPA) and 
pursuant to the regulations participation in the section 106 process 
and coordination with the National Environmental Policy Act, RUS is 
using its procedures for public involvement under NEPA to meet its 
responsibilities to solicit and consider the views of the public during 
the section 106 review for the proposed project. RUS would be providing 
financial assistance to DPC for its share in the construction of a 
proposed 345-kilovolt (kV) transmission line and associated 
infrastructure connecting the Hickory Creek Substation in Dubuque 
County, Iowa, with the Cardinal Substation in the Town of Middleton, 
Wisconsin (near Madison, Wisconsin). The Project also includes a new 
intermediate 345/138-kV substation near the Village of Montfort in 
either Grant County or Iowa County, Wisconsin. The total length of the 
345- kV transmission lines associated with the proposed project will be 
approximately 125 miles. DPC and the other project participants have 
identified proposed and alternate segments and locations for 
transmission lines and associated facilities and for the intermediate 
substation. Dairyland Power Cooperative is requesting RUS to provide 
financing for its portion of the proposed project. DPC is participating 
in the proposed project with two other utilities, American Transmission 
Company LLC, and ITC Midwest LLC (Utilities).
    The purpose of the proposed project is to: Address reliability 
issues on the regional bulk transmission system, alleviate congestion 
that occurs in certain parts of the transmission system and remove 
constraints that limit the delivery of power, expand the access of the 
transmission system to additional resources, increase the transfer 
capability of the electrical system between Iowa and Wisconsin, reduce 
the losses in transferring power and increase the efficiency of the 
transmission system, and respond to public policy objectives aimed at 
enhancing the nation's transmission system and to support the changing 
generation mix. A more detailed explanation of the purpose and need for 
the project can be found in the Draft EIS.

DATES: Written comments on this Draft EIS will be accepted for 60 
calendar days following the publication of the U.S. Environmental 
Protection Agency's notice of receipt of the Draft EIS in the Federal 
Register. RUS will conduct six formal public meetings in the project 
area. A court reporter will be available to record agency and public 
comments.

----------------------------------------------------------------------------------------------------------------
               Date                       Location                    Time                       Venue
----------------------------------------------------------------------------------------------------------------
January 22, 2019..................  Peosta, IA..........  1:00-3:00 p.m..............  Peosta Community Center,
                                                                                        7896 Burds Road, Peosta,
                                                                                        IA 52068.
January 22, 2019..................  Guttenberg, IA......  6:00-8:00 p.m..............  Guttenberg Municipal
                                                                                        Bldg., 502 First St.,
                                                                                        Guttenberg, IA 52052.
January 23, 2019..................  Cassville, WI.......  5:00-7:00 p.m..............  Cassville Middle School
                                                                                        Cafeteria, 715 E Amelia
                                                                                        St., Cassville, WI
                                                                                        53806.
January 24, 2019..................  Dodgeville, WI......  5:00-7:00 p.m..............  Dodgeville Bowl Banquet
                                                                                        Hall, 318 King St.,
                                                                                        Dodgerville, WI 53533.
January 28, 2019..................  Barneveld, WI.......  5:00-8:00 p.m..............  Deer Valley Lodge, 401
                                                                                        West Industrial Drive,
                                                                                        Barneveld, WI 53507.
January 29, 2019..................  Middleton, WI.......  5:00-8:00 p.m..............  Madison Marriott West,
                                                                                        1313 John Q. Hammonds
                                                                                        Drive, Middleton, WI
                                                                                        53562.
----------------------------------------------------------------------------------------------------------------


ADDRESSES: A copy of the Draft EIS may be viewed online at the 
following website: https://www.rd.usda.gov/publications/environmental-studies/impact-statements/cardinal-%E2%80%93-hickory-creek-transmission-line and Dairyland Power Cooperative, 3521 East Avenue 
South, La Crosse, WI 54602 and at 13 local libraries in the project 
area and the USFWS McGregor District Office in Prairie du Chien, WI.

FOR FURTHER INFORMATION CONTACT: To obtain copies of the Draft EIS, to 
request further participation or request consulting party status under 
section 106 of the NHPA or for further information, contact: Lauren 
Cusick or Dennis Rankin, Environmental Protection Specialist, USDA, 
Rural Utilities Service, 1400 Independence Avenue SW, Room 2244, Stop 
1571, Washington, DC 20250-1571, by phone at (202) 720-1414 or email 
[email protected] or [email protected].

SUPPLEMENTARY INFORMATION: RUS is the lead agency for the federal 
environmental review with cooperating and participating agencies as 
outlined in the Draft EIS. The first Notice of Intent (NOI) to Prepare 
an EIS and Hold Public Scoping Meeting was published in the Federal 
Register at 81 FR 71697, on October 18, 2016 to initiate a 30-day 
public scoping period. Four public scoping meetings for the EIS were 
held in the project area in October and November 2016, and the public 
comment was extended to 81 days and comments were accepted from October 
18, 2016 through January 6, 2017. On November 22, 2016 RUS published a 
second NOI announcing a second round of public scoping meetings in 
December 2017. RUS issued a Scoping Report in May 2018.
    The Draft EIS addresses the construction and operation of the 
proposed project, which, in addition to the 345-kV transmission line 
and associated infrastructure, includes the following facilities:
    a. At the existing Cardinal Substation in Dane County, Wisconsin: A 
new 345-kV terminal within the substation;
    b. At the new proposed Hill Valley Substation near the Village of 
Montfort, Wisconsin: A 10-acre facility with four 345-kV circuit 
breakers, one 345-kV shunt reactor, one 345-kV/138-kV autotransformer, 
and three 138-kV circuit breakers;
    c. At the existing Eden Substation near the village of Montfort, 
Wisconsin: Transmission line protective relaying upgrades, ground grid 
improvements, and replacement of equipment within the Eden Substation;
    d. Between the existing Eden Substation and the proposed Hill 
Valley Substation near the Village of Montfort, Wisconsin: A rebuild of 
the approximately 1-mile Hill Valley to Eden 138-kV transmission line;
    e. At the existing Wyoming Valley Substation near Wyoming, 
Wisconsin: Ground grid improvements;
    f. Between the existing Cardinal Substation and the proposed Hill 
Valley Substation: A new 50- to 53-mile (depending on the final route) 
345-kV transmission line;
    g. Between the proposed Hill Valley Substation and existing Hickory 
Creek

[[Page 63151]]

Substation: A new 50- to 70-mile (depending on the final route) 345-kV 
transmission line;
    h. At the Mississippi River in Cassville, Wisconsin: A rebuild and 
possible relocation of the existing Mississippi River transmission line 
crossing to accommodate the new 345-kV transmission line and 
Dairyland's 161-kV transmission line, and which would be capable of 
operating at 345-kV/345-kV but will initially be operated at 345-kV/
161-kV;
    1. depending on the final route and the Mississippi River crossing 
locations:
    i. A new 161-kV terminal and transmission line protective relaying 
upgrades within the existing Nelson Dewey Substation in Cassville, 
Wisconsin;
    ii. a replaced or reinforced structure within the Stoneman 
Substation in Cassville, Wisconsin;
    iii. multiple, partial, or complete rebuilds of existing 69-kV and 
138-kV transmission lines in Wisconsin that would be collocated with 
the new 345-kV line;
    i. At the existing Turkey River Substation in Dubuque County, Iowa: 
Two 161-/69-kV transformers, four 161-kV circuit breakers, and five 69-
kV circuit breakers; and
    j. At the existing Hickory Creek Substation in Dubuque County, 
Iowa: A new 345-kV terminal within the existing Hickory Creek 
Substation.
    Among the alternatives addressed in the Draft EIS is the No Action 
alternative, under which the proposed project would not be undertaken. 
Additional alternatives addressed in the Draft EIS include six action 
alternatives connecting the Cardinal Station in Wisconsin with the 
Hickory Creek Station in Iowa. RUS has carefully studied public health 
and safety, environmental impacts, and engineering aspects of the 
proposed project.
    RUS used input provided by government agencies, private 
organizations, and the public in the preparation of the Draft EIS. RUS 
will prepare a Final EIS that considers all comments received on the 
Draft EIS. Following the 30 calendar day comment period for the Final 
EIS, RUS will prepare a Record of Decision (ROD). Notices announcing 
the availability of the Final EIS and the ROD will be published in the 
Federal Register and in local newspapers.
    In accordance with section 106 of the National Historic 
Preservation Act and its implementing regulation, ``Protection of 
Historic Properties'' (36 CFR part 800) and as part of its broad 
environmental review process, RUS must take into account the effect of 
the proposed project on historic properties. Pursuant to 36 CFR 
800.2(d)(3), RUS is using its procedures for public involvement under 
NEPA to meet its responsibilities to solicit and consider the views of 
the public during section 106 review. Any party wishing to participate 
more directly with RUS as a ``consulting party'' in section 106 review 
may submit a written request to the RUS contact provided in this 
notice.
    The proposed project involves unavoidable impacts to wetlands and 
floodplains; this Notice of Availability also serves as a statement of 
no practicable alternatives to impacts on wetlands and floodplains, in 
accordance with Executive Orders 11990 and 11988, respectively.
    Any final action by RUS related to the proposed project will be 
subject to, and contingent upon, compliance with all relevant Federal, 
State and local environmental laws and regulations, and completion of 
the environmental review requirements as prescribed in the RUS 
Environmental Policies and Procedures (7 CFR part 1970).

    Dated: November 8, 2018.
Christopher A. McLean,
Assistant Administrator, Electric Programs, Rural Utilities Service.
[FR Doc. 2018-26558 Filed 12-6-18; 8:45 am]
 BILLING CODE 3410-15-P



                                                                          Federal Register / Vol. 83, No. 235 / Friday, December 7, 2018 / Notices                                                 63149

                                               (3) Enhance the quality, utility and                     You may also send comments to the                    Respondents: Individuals, businesses,
                                             clarity of the information to be                        Desk Officer for Agriculture, Office of               and agencies with responsibilities for
                                             collected;                                              Information and Regulatory Affairs,                   emergency preparedness and response.
                                               (4) Minimize the burden of the                        Office of Management and Budget,                        Estimated Annual Number of
                                             collection of information on those who                  Washington, DC 20503. Copies of the                   Respondents: 100.
                                             are to respond, including through the                   information collection may be requested                 Estimated Number of Reponses per
                                             use of appropriate automated,                           by contacting Lesa A. Johnson at the                  Respondent: 0.95.
                                             electronic, mechanical, or other                        above addresses.                                        Estimated Total Annual Responses:
                                             technological collection techniques or                  FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                           95.
                                             other forms of information technology.                                                                          Estimated Average Time per
                                                                                                     David Wechsler, (202) 720–2929.
                                               All comments received in response to                                                                        Response: 0.5 hours.
                                             this notice, including names and                        SUPPLEMENTARY INFORMATION:                              Estimated Total Annual Burden on
                                             addresses when provided, will be a                         Title: Request for Special Priorities              Respondents: 50 hours.
                                             matter of public record. Comments will                  Assistance for APAS.                                    We are requesting comments on all
                                             be summarized and included in the                          OMB Control Number: 0560–0280.                     aspects of this information collection to
                                             submission for Office of Management                        Expiration Date of Approval: March                 help us to:
                                             and Budget approval.                                    31, 2019.                                               (1) Evaluate whether the collection of
                                                                                                        Type of Request: Extension of a                    information is necessary for the proper
                                             Steve Peterson,
                                                                                                     currently approved information                        performance of the functions of the
                                             Acting Administrator, Farm Service Agency.
                                                                                                     collection.                                           FSA, including whether the information
                                             [FR Doc. 2018–26504 Filed 12–6–18; 8:45 am]                                                                   will have practical utility;
                                                                                                        Abstract: APAS would efficiently
                                             BILLING CODE 3410–05–P
                                                                                                     place priority ratings on contracts or                  (2) Evaluate the accuracy of the FSA’s
                                                                                                     orders of agriculture commodities up                  estimate of burden including the
                                                                                                     through the wholesale levels,                         validity of the methodology and
                                             DEPARTMENT OF AGRICULTURE                                                                                     assumptions used;
                                                                                                     agriculture production equipment,
                                             Farm Service Agency                                     allocate resources, and handle food                     (3) Enhance the quality, utility and
                                                                                                     claims within its authority as specified              clarity of the information to be
                                             Information Collection Request;                         in the Defense Production Act (DPA) of                collected;
                                             Request for Special Priorities                          1950, as amended, when necessary to                     (4) Minimize the burden of the
                                             Assistance                                              promote national defense. It was                      collection of information on those who
                                                                                                     determined that food is a scarce and                  are to respond, including through the
                                             AGENCY:   Farm Service Agency, USDA.                                                                          use of appropriate automated,
                                                                                                     critical commodity essential to the
                                             ACTION:   Notice; request for comments.                                                                       electronic, mechanical, or other
                                                                                                     national defense (including civil
                                                                                                     emergency preparedness and response).                 technological collection techniques or
                                             SUMMARY:    In accordance with the
                                                                                                     Unless its production, processing,                    other forms of information technology.
                                             Paperwork Reduction Act of 1995, the                                                                            All comments received in response to
                                             Farm Service Agency (FSA) is                            storage, and wholesale distribution are
                                                                                                                                                           this notice, including names and
                                             requesting comments from all interested                 regulated during times of emergencies,
                                                                                                                                                           addresses when provided, will be a
                                             individuals and organizations on an                     the national defense requirement for
                                                                                                                                                           matter of public record. Comments will
                                             extension of a currently approved                       food and food production may not be
                                                                                                                                                           be summarized and included in the
                                             information collection request                          met without creating hardship in the
                                                                                                                                                           submission for Office of Management
                                             associated with the Request for Special                 civilian marketplace. Applicants
                                                                                                                                                           and Budget approval.
                                             Priorities Assistance. The information                  (Government agencies or private
                                             collection established by the Agriculture               individuals with a role in emergency                  Steven Peterson,
                                             Priorities and Allocations System                       preparedness, response, and recovery                  Acting Administrator, Farm Service Agency.
                                             (APAS) regulation is necessary for the                  functions) will request authorization                 [FR Doc. 2018–26505 Filed 12–6–18; 8:45 am]
                                             program applicant (person) to request                   from USDA to place a rating on a                      BILLING CODE 3410–05–P
                                             prioritizing of a contract above all other              contract for items to support national
                                             contracts. The purpose of the priority                  defense activities. Priority rating request
                                             rating is to obtain item(s) in support of               procedures and forms can be found on                  DEPARTMENT OF AGRICULTURE
                                             national defense programs that they are                 USDA’s website. Applicants must
                                             not able to obtain in time through                      supply, at time of request, their name,               Rural Utilities Service
                                             normal market channels.                                 location, contact information, items for
                                                                                                     which the applicant is requesting                     Cardinal-Hickory Creek 345-kV
                                             DATES: We will consider comments that
                                                                                                     assistance on, quantity, and delivery                 Transmission Line Project
                                             we receive by February 5, 2019.
                                             ADDRESSES: We invite you to submit                      date. Applicants can submit the request               AGENCY:   Rural Utilities Service, USDA.
                                             comments on the notice. In your                         by mail or fax. There are no changes to
                                                                                                                                                           ACTION:  Notice of availability of a draft
                                             comments, include date, volume, and                     the burden hours since the last OMB
                                                                                                                                                           environmental impact statement; notice
                                             page number of this issue of the Federal                approval.
                                                                                                                                                           of public meetings; and section 106
                                             Register. You may submit comments by                       For the following estimated total                  notification to the public.
                                             any of the following methods:                           annual burden on respondents, the
                                               • Federal eRulemaking Portal: Go to                   formula used to calculate the total                   SUMMARY:   Notice is hereby given that
amozie on DSK3GDR082PROD with NOTICES




                                             http://www.regulations.gov. Follow the                  burden hour is the estimated average                  the Rural Utilities Service (RUS) has
                                             online instructions for submitting                      time per responses hours multiplied by                prepared a Draft Environmental Impact
                                             comments.                                               the estimated total annual responses.                 Statement (EIS) to meet its
                                               • Mail: David Weschsler, USDA/                           Estimate of Respondent Burden:                     responsibilities under the National
                                             FPAC/HS, 1400 Independence Ave. SW,                     Public reporting burden for the                       Environmental Policy Act (NEPA) and
                                             Room 0092–S, Mail Stop 0560,                            information collection is estimated to                environmental policies and procedures
                                             Washington, DC 20250–0567.                              average 30 minutes (0.50) per response.               related to providing financial assistance


                                        VerDate Sep<11>2014   16:56 Dec 06, 2018   Jkt 247001   PO 00000   Frm 00002   Fmt 4703   Sfmt 4703   E:\FR\FM\07DEN1.SGM   07DEN1


                                             63150                          Federal Register / Vol. 83, No. 235 / Friday, December 7, 2018 / Notices

                                             to Dairyland Power Cooperative (DPC).                        in either Grant County or Iowa County,                    the transmission system to additional
                                             Further, in accordance with section 106                      Wisconsin. The total length of the 345-                   resources, increase the transfer
                                             of the National Historic Preservation Act                    kV transmission lines associated with                     capability of the electrical system
                                             (NHPA) and pursuant to the regulations                       the proposed project will be                              between Iowa and Wisconsin, reduce
                                             participation in the section 106 process                     approximately 125 miles. DPC and the                      the losses in transferring power and
                                             and coordination with the National                           other project participants have                           increase the efficiency of the
                                             Environmental Policy Act, RUS is using                       identified proposed and alternate                         transmission system, and respond to
                                             its procedures for public involvement                        segments and locations for transmission                   public policy objectives aimed at
                                             under NEPA to meet its responsibilities                      lines and associated facilities and for                   enhancing the nation’s transmission
                                             to solicit and consider the views of the                     the intermediate substation. Dairyland                    system and to support the changing
                                             public during the section 106 review for                     Power Cooperative is requesting RUS to                    generation mix. A more detailed
                                                                                                          provide financing for its portion of the                  explanation of the purpose and need for
                                             the proposed project. RUS would be
                                                                                                          proposed project. DPC is participating                    the project can be found in the Draft
                                             providing financial assistance to DPC
                                                                                                          in the proposed project with two other                    EIS.
                                             for its share in the construction of a                       utilities, American Transmission
                                             proposed 345-kilovolt (kV) transmission                      Company LLC, and ITC Midwest LLC                          DATES:  Written comments on this Draft
                                             line and associated infrastructure                           (Utilities).                                              EIS will be accepted for 60 calendar
                                             connecting the Hickory Creek                                    The purpose of the proposed project                    days following the publication of the
                                             Substation in Dubuque County, Iowa,                          is to: Address reliability issues on the                  U.S. Environmental Protection Agency’s
                                             with the Cardinal Substation in the                          regional bulk transmission system,                        notice of receipt of the Draft EIS in the
                                             Town of Middleton, Wisconsin (near                           alleviate congestion that occurs in                       Federal Register. RUS will conduct six
                                             Madison, Wisconsin). The Project also                        certain parts of the transmission system                  formal public meetings in the project
                                             includes a new intermediate 345/138-kV                       and remove constraints that limit the                     area. A court reporter will be available
                                             substation near the Village of Montfort                      delivery of power, expand the access of                   to record agency and public comments.

                                                              Date                                 Location                            Time                                       Venue

                                             January 22, 2019 ....................   Peosta, IA .............................   1:00–3:00 p.m .....     Peosta Community Center, 7896 Burds Road, Peosta, IA
                                                                                                                                                          52068.
                                             January 22, 2019 ....................   Guttenberg, IA .......................     6:00–8:00 p.m .....     Guttenberg Municipal Bldg., 502 First St., Guttenberg, IA
                                                                                                                                                          52052.
                                             January 23, 2019 ....................   Cassville, WI .........................    5:00–7:00 p.m .....     Cassville Middle School Cafeteria, 715 E Amelia St.,
                                                                                                                                                          Cassville, WI 53806.
                                             January 24, 2019 ....................   Dodgeville, WI .......................     5:00–7:00 p.m .....     Dodgeville Bowl Banquet Hall, 318 King St., Dodgerville,
                                                                                                                                                          WI 53533.
                                             January 28, 2019 ....................   Barneveld, WI .......................      5:00–8:00 p.m .....     Deer Valley Lodge, 401 West Industrial Drive, Barneveld,
                                                                                                                                                          WI 53507.
                                             January 29, 2019 ....................   Middleton, WI ........................     5:00–8:00 p.m .....     Madison Marriott West, 1313 John Q. Hammonds Drive,
                                                                                                                                                          Middleton, WI 53562.



                                             ADDRESSES:    A copy of the Draft EIS may                    environmental review with cooperating                        b. At the new proposed Hill Valley
                                             be viewed online at the following                            and participating agencies as outlined in                 Substation near the Village of Montfort,
                                             website: https://www.rd.usda.gov/                            the Draft EIS. The first Notice of Intent                 Wisconsin: A 10-acre facility with four
                                             publications/environmental-studies/                          (NOI) to Prepare an EIS and Hold Public                   345-kV circuit breakers, one 345-kV
                                             impact-statements/cardinal-                                  Scoping Meeting was published in the                      shunt reactor, one 345-kV/138-kV
                                             %E2%80%93-hickory-creek-                                     Federal Register at 81 FR 71697, on                       autotransformer, and three 138-kV
                                             transmission-line and Dairyland Power                        October 18, 2016 to initiate a 30-day                     circuit breakers;
                                             Cooperative, 3521 East Avenue South,                         public scoping period. Four public                           c. At the existing Eden Substation
                                             La Crosse, WI 54602 and at 13 local                          scoping meetings for the EIS were held                    near the village of Montfort, Wisconsin:
                                             libraries in the project area and the                        in the project area in October and                        Transmission line protective relaying
                                             USFWS McGregor District Office in                            November 2016, and the public                             upgrades, ground grid improvements,
                                             Prairie du Chien, WI.                                        comment was extended to 81 days and                       and replacement of equipment within
                                             FOR FURTHER INFORMATION CONTACT: To                          comments were accepted from October                       the Eden Substation;
                                                                                                          18, 2016 through January 6, 2017. On                         d. Between the existing Eden
                                             obtain copies of the Draft EIS, to request
                                                                                                          November 22, 2016 RUS published a                         Substation and the proposed Hill Valley
                                             further participation or request
                                                                                                          second NOI announcing a second round                      Substation near the Village of Montfort,
                                             consulting party status under section
                                                                                                          of public scoping meetings in December                    Wisconsin: A rebuild of the
                                             106 of the NHPA or for further
                                                                                                          2017. RUS issued a Scoping Report in                      approximately 1-mile Hill Valley to
                                             information, contact: Lauren Cusick or
                                                                                                          May 2018.                                                 Eden 138-kV transmission line;
                                             Dennis Rankin, Environmental
                                                                                                                                                                       e. At the existing Wyoming Valley
                                             Protection Specialist, USDA, Rural                             The Draft EIS addresses the                             Substation near Wyoming, Wisconsin:
                                             Utilities Service, 1400 Independence                         construction and operation of the                         Ground grid improvements;
amozie on DSK3GDR082PROD with NOTICES




                                             Avenue SW, Room 2244, Stop 1571,                             proposed project, which, in addition to                      f. Between the existing Cardinal
                                             Washington, DC 20250–1571, by phone                          the 345-kV transmission line and                          Substation and the proposed Hill Valley
                                             at (202) 720–1414 or email                                   associated infrastructure, includes the                   Substation: A new 50- to 53-mile
                                             Lauren.Cusick@usda.gov or                                    following facilities:                                     (depending on the final route) 345-kV
                                             Dennis.Rankin@usda.gov.                                        a. At the existing Cardinal Substation                  transmission line;
                                             SUPPLEMENTARY INFORMATION: RUS is the                        in Dane County, Wisconsin: A new 345-                        g. Between the proposed Hill Valley
                                             lead agency for the federal                                  kV terminal within the substation;                        Substation and existing Hickory Creek


                                        VerDate Sep<11>2014    16:56 Dec 06, 2018    Jkt 247001    PO 00000      Frm 00003      Fmt 4703   Sfmt 4703   E:\FR\FM\07DEN1.SGM   07DEN1


                                                                          Federal Register / Vol. 83, No. 235 / Friday, December 7, 2018 / Notices                                           63151

                                             Substation: A new 50- to 70-mile                        project on historic properties. Pursuant              Economic Census covering the
                                             (depending on the final route) 345-kV                   to 36 CFR 800.2(d)(3), RUS is using its               Manufacturing Sector.
                                             transmission line;                                      procedures for public involvement                        The Census Bureau allowed the
                                                h. At the Mississippi River in                       under NEPA to meet its responsibilities               previous clearance to lapse since ASM
                                             Cassville, Wisconsin: A rebuild and                     to solicit and consider the views of the              inquiries for survey year 2017 (collected
                                             possible relocation of the existing                     public during section 106 review. Any                 in 2018) are cleared as part of the 2017
                                             Mississippi River transmission line                     party wishing to participate more                     Economic Census (0607–0998). The
                                             crossing to accommodate the new 345-                    directly with RUS as a ‘‘consulting                   Census Bureau is requesting
                                             kV transmission line and Dairyland’s                    party’’ in section 106 review may                     reinstatement to continue annual
                                             161-kV transmission line, and which                     submit a written request to the RUS                   collection of the ASM for survey years
                                             would be capable of operating at 345-                   contact provided in this notice.                      2018, 2019, and 2020.
                                             kV/345-kV but will initially be operated                   The proposed project involves                         The ASM collects data on
                                             at 345-kV/161-kV;                                       unavoidable impacts to wetlands and                   employment, payroll, hours, wages of
                                                1. depending on the final route and                  floodplains; this Notice of Availability              production workers, value added by
                                             the Mississippi River crossing locations:               also serves as a statement of no                      manufacture, cost of materials, value of
                                                i. A new 161-kV terminal and                         practicable alternatives to impacts on                shipments by North American Product
                                             transmission line protective relaying                   wetlands and floodplains, in accordance               Classification System (NAPCS) product
                                             upgrades within the existing Nelson                     with Executive Orders 11990 and 11988,                code, inventories, cost of employer’s
                                             Dewey Substation in Cassville,                          respectively.                                         fringe benefits, operating expenses, and
                                             Wisconsin;                                                 Any final action by RUS related to the             expenditures for new and used plant
                                                ii. a replaced or reinforced structure               proposed project will be subject to, and              and equipment. The Census Bureau
                                             within the Stoneman Substation in                       contingent upon, compliance with all                  tabulates and publishes data for most of
                                             Cassville, Wisconsin;                                   relevant Federal, State and local                     these items by two-digit through six-
                                                iii. multiple, partial, or complete                  environmental laws and regulations,                   digit North American Industry
                                             rebuilds of existing 69-kV and 138-kV                   and completion of the environmental                   Classification System (NAICS) levels.
                                             transmission lines in Wisconsin that                    review requirements as prescribed in                  The Census Bureau also publishes ASM
                                             would be collocated with the new 345-                   the RUS Environmental Policies and                    data by state at the two-through four-
                                             kV line;                                                Procedures (7 CFR part 1970).                         digit NAICS levels.
                                                i. At the existing Turkey River                                                                               Federal agencies use ASM data as
                                             Substation in Dubuque County, Iowa:                       Dated: November 8, 2018.                            benchmarks for their statistical
                                             Two 161-/69-kV transformers, four 161-                  Christopher A. McLean,                                programs, including the Federal Reserve
                                             kV circuit breakers, and five 69-kV                     Assistant Administrator, Electric Programs,           Board’s Index of Industrial Production
                                             circuit breakers; and                                   Rural Utilities Service.                              and the Bureau of Economic Analysis’
                                                j. At the existing Hickory Creek                     [FR Doc. 2018–26558 Filed 12–6–18; 8:45 am]           (BEA) National Income and Product
                                             Substation in Dubuque County, Iowa: A                   BILLING CODE 3410–15–P                                Accounts. The Department of Energy
                                             new 345-kV terminal within the existing                                                                       relies on ASM estimates on the use of
                                             Hickory Creek Substation.                                                                                     energy during production in the
                                                Among the alternatives addressed in                  DEPARTMENT OF COMMERCE                                manufacturing sector. These data also
                                             the Draft EIS is the No Action                                                                                are used as benchmark data for the
                                             alternative, under which the proposed                   Census Bureau                                         Manufacturing Energy Consumption
                                             project would not be undertaken.                                                                              Survey, which is conducted for the
                                             Additional alternatives addressed in the                Submission for OMB Review;                            Department of Energy by the Census
                                             Draft EIS include six action alternatives               Comment Request                                       Bureau. Within the Census Bureau, the
                                             connecting the Cardinal Station in                         The Department of Commerce will                    ASM data are used to benchmark and
                                             Wisconsin with the Hickory Creek                        submit to the Office of Management and                reconcile monthly and quarterly
                                             Station in Iowa. RUS has carefully                      Budget (OMB) for clearance the                        estimates of manufacturing production
                                             studied public health and safety,                       following proposal for collection of                  and inventories.
                                             environmental impacts, and engineering                  information under the provisions of the                  The survey also provides valuable
                                             aspects of the proposed project.                        Paperwork Reduction Act.                              information to private companies,
                                                RUS used input provided by                              Agency: U.S. Census Bureau.                        research organizations, and trade
                                             government agencies, private                               Title: Annual Survey of Manufactures.              associations. Industry makes extensive
                                             organizations, and the public in the                       OMB Control Number: 0607–0449.                     use of the annual figures on NAPCS
                                             preparation of the Draft EIS. RUS will                     Form Number(s): MA–10000.                          product shipments for market analysis,
                                             prepare a Final EIS that considers all                     Type of Request: Reinstatement, with               product planning, and investment
                                             comments received on the Draft EIS.                     change of an expired collection.                      planning. State development and
                                             Following the 30 calendar day comment                      Number of Respondents: 55,000.                     planning agencies rely on ASM data for
                                             period for the Final EIS, RUS will                         Average Hours per Response: 3.5                    policymaking, planning, and
                                             prepare a Record of Decision (ROD).                     hours.                                                administration.
                                             Notices announcing the availability of                     Burden Hours: 192,500.                                The Census Bureau plans to make the
                                             the Final EIS and the ROD will be                          Needs and Uses: The Census Bureau                  following changes to the ASM data
                                             published in the Federal Register and in                is requesting a reinstatement with                    collection:
                                             local newspapers.                                       changes of the expired collection for the
amozie on DSK3GDR082PROD with NOTICES




                                                In accordance with section 106 of the                Annual Survey of Manufactures (ASM).                  a. Elimination of the MA–10000(S)
                                             National Historic Preservation Act and                  The Census Bureau has conducted the                      The MA–10000(S) questionnaire will
                                             its implementing regulation, ‘‘Protection               ASM since 1949 to provide key                         be eliminated. Historically, all locations
                                             of Historic Properties’’ (36 CFR part 800)              measures of manufacturing activity                    of multiple-establishment firms and
                                             and as part of its broad environmental                  during intercensal periods. In census                 large single-establishment firms in the
                                             review process, RUS must take into                      years ending in ‘‘2’’ and ‘‘7,’’ we mail              sample were asked to report on the MA–
                                             account the effect of the proposed                      and collect the ASM as part of the                    10000(L) questionnaire. The remaining


                                        VerDate Sep<11>2014   16:56 Dec 06, 2018   Jkt 247001   PO 00000   Frm 00004   Fmt 4703   Sfmt 4703   E:\FR\FM\07DEN1.SGM   07DEN1



Document Created: 2018-12-07 01:52:32
Document Modified: 2018-12-07 01:52:32
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability of a draft environmental impact statement; notice of public meetings; and section 106 notification to the public.
DatesWritten comments on this Draft EIS will be accepted for 60 calendar days following the publication of the U.S. Environmental Protection Agency's notice of receipt of the Draft EIS in the Federal Register. RUS will conduct six formal public meetings in the project area. A court reporter will be available to record agency and public comments.
ContactTo obtain copies of the Draft EIS, to request further participation or request consulting party status under section 106 of the NHPA or for further information, contact: Lauren Cusick or Dennis Rankin, Environmental Protection Specialist, USDA, Rural Utilities Service, 1400 Independence Avenue SW, Room 2244, Stop 1571, Washington, DC 20250-1571, by phone at (202) 720-1414 or email [email protected] or [email protected]
FR Citation83 FR 63149 