In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725K (Mandatory Reliability Standards for the SERC Region).

Federal Register, Volume 83 Issue 236 (Monday, December 10, 2018)
[Federal Register Volume 83, Number 236 (Monday, December 10, 2018)]
[Notices]
[Pages 63494-63496]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-26664]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Commission Information Collection Activities (FERC-725K); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal

[[Page 63495]]

Energy Regulatory Commission (Commission or FERC) is soliciting public 
comment on the currently approved information collection, FERC-725K 
(Mandatory Reliability Standards for the SERC Region).

DATES: Comments on the collection of information are due February 8, 
2019.

ADDRESSES: You may submit comments (identified by Docket No. IC19-9-
000) by either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: Mandatory Reliability Standards for the SERC Region.
    OMB Control No.: 1902-0260.
    Type of Request: Three-year extension of the FERC-725K information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: Section 215 of the Federal Power Act (FPA) requires a 
Commission-certified Electric Reliability Organization (ERO) to develop 
mandatory and enforceable Reliability Standards, which are subject to 
Commission review and approval. Once approved, the Reliability 
Standards may be enforced by NERC, subject to Commission oversight, or 
by the Commission independently.
    Reliability Standards that NERC proposes to the Commission may 
include Reliability Standards that are proposed by a Regional Entity to 
be effective in that region. In Order No. 672, the Commission noted 
that:

    As a general matter, we will accept the following two types of 
regional differences, provided they are otherwise just, reasonable, 
not unduly discriminatory or preferential and in the public 
interest, as required under the statute: (1) A regional difference 
that is more stringent than the continent-wide Reliability Standard, 
including a regional difference that addresses matters that the 
continent-wide Reliability Standard does not; and (2) a regional 
Reliability Standard that is necessitated by a physical difference 
in the Bulk-Power System.

    When NERC reviews a regional Reliability Standard that would be 
applicable on an interconnection-wide basis and that has been proposed 
by a Regional Entity organized on an interconnection-wide basis, NERC 
must rebuttably presume that the regional Reliability Standard is just, 
reasonable, not unduly discriminatory or preferential, and in the 
public interest. In turn, the Commission must give ``due weight'' to 
the technical expertise of NERC and of a Regional Entity organized on 
an interconnection-wide basis.
    On April 19, 2007, the Commission accepted delegation agreements 
between NERC and each of the eight Regional Entities. In the order, the 
Commission accepted SERC as a Regional Entity organized on less than an 
interconnection-wide basis. As a Regional Entity, SERC oversees Bulk-
Power System reliability within the SERC Region, which covers a 
geographic area of approximately 560,000 square miles in a sixteen-
state area in the southeastern and central United States (all of 
Missouri, Alabama, Tennessee, North Carolina, South Carolina, Georgia, 
Mississippi, and portions of Iowa, Illinois, Kentucky, Virginia, 
Oklahoma, Arkansas, Louisiana, Texas and Florida). The SERC Region is 
currently geographically divided into five subregions that are 
identified as Southeastern, Central, VACAR, Delta, and Gateway.
    Type of Respondents: Entities registered with the North American 
Electric Reliability Corporation (within the SERC region).
    Estimate of Annual Burden: \1\ The Commission estimates the annual 
reporting burden and cost for the information collection as:
---------------------------------------------------------------------------

    \1\ ``Burden'' is defined as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.

                                              FERC-725K--Mandatory Reliability Standard for the SERC Region
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                           Total annual
                                                             Number of     Annual number   Total number   Average burden   burden hours      Cost per
                                                            respondents    of responses    of responses    and cost per      and total    respondent ($)
                                                                          per respondent                   response \2\     annual cost
                                                                     (1)             (2)     (1) * (2) =             (4)   (3) * (4) = (       (5) / (1)
                                                                                                     (3)                              5)
                                                         -----------------------------------------------------------------------------------------------
PCs: Design and Document Automatic UFLS Program.........          \3\ 21               1              21               8             168         $535.20
                                                                                                                 $535.20      $11,239.20
PCs: Provide Documentation and Data to SERC.............          \3\ 21               1              21              16             336        1,070.40
                                                                                                               $1,070.40      $22,478.40
GOs: Provide Documentation and Data to SERC.............         \4\ 104               1             104              16           1,664        1,070.40
                                                                                                               $1,070.40     $111,321.60
GOs: Record Retention...................................         \4\ 104               1             104               4             416          267.60
                                                                                                                 $267.60      $27,830.40
                                                         -----------------------------------------------------------------------------------------------
    Total...............................................  ..............  ..............             125  ..............           2,584        2,943.60
                                                                                                                             $172,869.60
--------------------------------------------------------------------------------------------------------------------------------------------------------


[[Page 63496]]

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \2\ The estimated hourly cost (salary plus benefits) provided in 
this section is based on the salary figures (http://www.bls.gov/oes/current/naics2_22.htm) and benefits (http://www.bls.gov/news.release/ecec.nr0.htm) for May 2017 posted by the Bureau of 
Labor Statistics for the Utilities sector. The hourly estimates for 
salary plus benefits are $66.90/hour based on the Engineering career 
(Occupation Code: 17-2071).
    \3\ Both figures for PC respondents are not to be totaled. They 
represent the same set of respondents.
    \4\ Both figures for GO respondents are not to be totaled. They 
represent the same set of respondents.

    Dated: November 30, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-26664 Filed 12-7-18; 8:45 am]
 BILLING CODE 6717-01-P



     63494                      Federal Register / Vol. 83, No. 236 / Monday, December 10, 2018 / Notices

        Filed Date: 11/30/18.                                   Description: Tariff Cancellation:                     Accession Number: 20181130–5257.
        Accession Number: 20181130–5064.                     Notice of Cancellation to be effective 12/               Comments Due: 5 p.m. ET 12/21/18.
        Comments Due: 5 p.m. ET 12/21/18.                    1/2018.                                                  Docket Numbers: ER19–452–000.
        Docket Numbers: ER19–438–000.                           Filed Date: 11/30/18.                                 Applicants: Pacific Gas and Electric
        Applicants: ORNI 37 LLC.                                Accession Number: 20181130–5164.                   Company.
        Description: § 205(d) Rate Filing:                      Comments Due: 5 p.m. ET 12/21/18.                     Description: § 205(d) Rate Filing:
     Revisions to Market-Based Rate Tariff                      Docket Numbers: ER19–446–000.                      November 2018 Western WDT Service
     (ORNI 37 LLC) to be effective 1/30/2019.                   Applicants: New England Power Pool                 Agreement Biannual Filing to be
        Filed Date: 11/30/18.                                Participants Committee.                               effective 2/1/2019.
        Accession Number: 20181130–5066.                        Description: § 205(d) Rate Filing:                    Filed Date: 11/30/18.
        Comments Due: 5 p.m. ET 12/21/18.                    December 2018 Membership Filing to be                    Accession Number: 20181130–5264.
        Docket Numbers: ER19–439–000.                        effective 11/1/2018.                                     Comments Due: 5 p.m. ET 12/21/18.
        Applicants: ORNI 14 LLC.                                Filed Date: 11/30/18.                                 Docket Numbers: ER19–453–000.
        Description: § 205(d) Rate Filing:                      Accession Number: 20181130–5166.                      Applicants: Southwest Power Pool,
     Revisions to Market-Based Rate Tariff                      Comments Due: 5 p.m. ET 12/21/18.                  Inc.
     (ORNI 14 LLC) to be effective 1/30/2019.                   Docket Numbers: ER19–447–000.                         Description: § 205(d) Rate Filing: MA
        Filed Date: 11/30/18.                                   Applicants: ISO New England Inc.,                  Amendments for Mor-Gran-Sou Electric
        Accession Number: 20181130–5071.                     New England Power Pool Participants                   Cooperative, Inc. to be effective 11/19/
        Comments Due: 5 p.m. ET 12/21/18.                    Committee.                                            2018.
        Docket Numbers: ER19–440–000.                           Description: ISO New England Inc., et                 Filed Date: 11/30/18.
        Applicants: Ormesa LLC.                              al. submits Installed Capacity                           Accession Number: 20181130–5279.
        Description: § 205(d) Rate Filing:                   Requirement, Hydro Quebec                                Comments Due: 5 p.m. ET 12/21/18.
     Revisions to Market-Based Rate Tariff                   Interconnection Capability Credits and                   The filings are accessible in the
     (Ormesa LLC) to be effective 1/30/2019.                 Related Values for the 2019/2020, et al.              Commission’s eLibrary system by
        Filed Date: 11/30/18.                                Annual Reconfiguration Auction.                       clicking on the links or querying the
        Accession Number: 20181130–5072.                        Filed Date: 11/30/18.
        Comments Due: 5 p.m. ET 12/21/18.                                                                          docket number.
                                                                Accession Number: 20181130–5169.                      Any person desiring to intervene or
        Docket Numbers: ER19–441–000.                           Comments Due: 5 p.m. ET 12/21/18.                  protest in any of the above proceedings
        Applicants: ONGP LLC.                                                                                      must file in accordance with Rules 211
                                                                Docket Numbers: ER19–448–000.
        Description: § 205(d) Rate Filing:                                                                         and 214 of the Commission’s
                                                                Applicants: Appalachian Power
     Revisions to Market-Based Rate Tariff                                                                         Regulations (18 CFR 385.211 and
                                                             Company.
     (ONGP LLC) to be effective 1/30/2019.                                                                         385.214) on or before 5:00 p.m. Eastern
                                                                Description: § 205(d) Rate Filing:
        Filed Date: 11/30/18.
                                                             OATT-Revise Attachment K, AEP Texas                   time on the specified comment date.
        Accession Number: 20181130–5073.
                                                             Inc. Rate Update to be effective 12/31/               Protests may be considered, but
        Comments Due: 5 p.m. ET 12/21/18.
                                                             9998.                                                 intervention is necessary to become a
        Docket Numbers: ER19–442–000.                           Filed Date: 11/30/18.                              party to the proceeding.
        Applicants: Mammoth Three LLC.                                                                                eFiling is encouraged. More detailed
                                                                Accession Number: 20181130–5237.
        Description: § 205(d) Rate Filing:                                                                         information relating to filing
                                                                Comments Due: 5 p.m. ET 12/21/18.
     Revisions to Market-Based Rate Tariff                                                                         requirements, interventions, protests,
     (Mammoth Three LLC) to be effective 1/                     Docket Numbers: ER19–449–000.
                                                                Applicants: ISO New England Inc.,                  service, and qualifying facilities filings
     30/2019.                                                                                                      can be found at: http://www.ferc.gov/
        Filed Date: 11/30/18.                                New England Power Pool Participants
                                                             Committee.                                            docs-filing/efiling/filing-req.pdf. For
        Accession Number: 20181130–5075.
                                                                Description: § 205(d) Rate Filing:                 other information, call (866) 208–3676
        Comments Due: 5 p.m. ET 12/21/18.
                                                             ISO–NE and NEPOOL; Revisions to                       (toll free). For TTY, call (202) 502–8659.
        Docket Numbers: ER19–443–000.
        Applicants: Heber Geothermal                         Clarify Treatment of Retiring Resources                 Dated: November 30, 2018.
     Company LLC.                                            to be effective 1/29/2019.                            Nathaniel J. Davis, Sr.,
        Description: § 205(d) Rate Filing:                      Filed Date: 11/30/18.                              Deputy Secretary.
     Revisions to Market-Based Rate Tariff                      Accession Number: 20181130–5247.                   [FR Doc. 2018–26639 Filed 12–7–18; 8:45 am]
     (Heber Geothermal Company LLC) to be                       Comments Due: 5 p.m. ET 12/21/18.                  BILLING CODE P
     effective 1/30/2019.                                       Docket Numbers: ER19–450–000.
        Filed Date: 11/30/18.                                   Applicants: Southwest Power Pool,
        Accession Number: 20181130–5077.                     Inc.                                                  DEPARTMENT OF ENERGY
        Comments Due: 5 p.m. ET 12/21/18.                       Description: § 205(d) Rate Filing:
        Docket Numbers: ER19–444–000.                        3396R1 Otter Tail Power Company                       Federal Energy Regulatory
        Applicants: ISO New England Inc.,                    NITSA and NOA to be effective 2/1/                    Commission
     New England Power Pool Participants                     2019.
                                                                Filed Date: 11/30/18.                              Commission Information Collection
     Committee.
                                                                Accession Number: 20181130–5253.                   Activities (FERC–725K); Comment
        Description: § 205(d) Rate Filing:
                                                                Comments Due: 5 p.m. ET 12/21/18.                  Request; Extension
     ISO–NE and NEPOOL; Conforming
     Changes to ISO Tariff for CASPR to be                      Docket Numbers: ER19–451–000.                      AGENCY: Federal Energy Regulatory
     effective 1/29/2019.                                       Applicants: Pacific Gas and Electric               Commission, Department of Energy.
        Filed Date: 11/30/18.                                Company.                                              ACTION: Notice of information collection
        Accession Number: 20181130–5103.                        Description: § 205(d) Rate Filing:                 and request for comments.
        Comments Due: 5 p.m. ET 12/21/18.                    November 2018 Western
        Docket Numbers: ER19–445–000.                        Interconnection Agreement Biannual                    SUMMARY: In compliance with the
        Applicants: Ohio Valley Electric                     Filing to be effective 2/1/2019.                      requirements of the Paperwork
     Corporation.                                               Filed Date: 11/30/18.                              Reduction Act of 1995, the Federal


VerDate Sep<11>2014   17:10 Dec 07, 2018   Jkt 247001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\10DEN1.SGM   10DEN1


                                         Federal Register / Vol. 83, No. 236 / Monday, December 10, 2018 / Notices                                                                              63495

     Energy Regulatory Commission                                                OMB Control No.: 1902–0260.                                      Reliability Standard is just, reasonable,
     (Commission or FERC) is soliciting                                          Type of Request: Three-year extension                            not unduly discriminatory or
     public comment on the currently                                          of the FERC–725K information                                        preferential, and in the public interest.
     approved information collection, FERC–                                   collection requirements with no changes                             In turn, the Commission must give ‘‘due
     725K (Mandatory Reliability Standards                                    to the current reporting requirements.                              weight’’ to the technical expertise of
     for the SERC Region).                                                       Abstract: Section 215 of the Federal                             NERC and of a Regional Entity
     DATES: Comments on the collection of                                     Power Act (FPA) requires a                                          organized on an interconnection-wide
     information are due February 8, 2019.                                    Commission-certified Electric                                       basis.
     ADDRESSES: You may submit comments
                                                                              Reliability Organization (ERO) to
                                                                              develop mandatory and enforceable                                     On April 19, 2007, the Commission
     (identified by Docket No. IC19–9–000)                                                                                                        accepted delegation agreements between
     by either of the following methods:                                      Reliability Standards, which are subject
                                                                              to Commission review and approval.                                  NERC and each of the eight Regional
        • eFiling at Commission’s website:
                                                                              Once approved, the Reliability                                      Entities. In the order, the Commission
     http://www.ferc.gov/docs-filing/
     efiling.asp.                                                             Standards may be enforced by NERC,                                  accepted SERC as a Regional Entity
        • Mail/Hand Delivery/Courier:                                         subject to Commission oversight, or by                              organized on less than an
     Federal Energy Regulatory Commission,                                    the Commission independently.                                       interconnection-wide basis. As a
     Secretary of the Commission, 888 First                                      Reliability Standards that NERC                                  Regional Entity, SERC oversees Bulk-
     Street NE, Washington, DC 20426.                                         proposes to the Commission may                                      Power System reliability within the
        Instructions: All submissions must be                                 include Reliability Standards that are                              SERC Region, which covers a
     formatted and filed in accordance with                                   proposed by a Regional Entity to be                                 geographic area of approximately
     submission guidelines at: http://                                        effective in that region. In Order No.                              560,000 square miles in a sixteen-state
     www.ferc.gov/help/submission-                                            672, the Commission noted that:                                     area in the southeastern and central
     guide.asp. For user assistance contact                                      As a general matter, we will accept the                          United States (all of Missouri, Alabama,
     FERC Online Support by email at                                          following two types of regional differences,                        Tennessee, North Carolina, South
     ferconlinesupport@ferc.gov, or by phone                                  provided they are otherwise just, reasonable,                       Carolina, Georgia, Mississippi, and
     at: (866) 208–3676 (toll-free), or (202)                                 not unduly discriminatory or preferential and                       portions of Iowa, Illinois, Kentucky,
     502–8659 for TTY.                                                        in the public interest, as required under the
                                                                              statute: (1) A regional difference that is more                     Virginia, Oklahoma, Arkansas,
        Docket: Users interested in receiving                                                                                                     Louisiana, Texas and Florida). The
                                                                              stringent than the continent-wide Reliability
     automatic notification of activity in this                               Standard, including a regional difference that                      SERC Region is currently geographically
     docket or in viewing/downloading                                         addresses matters that the continent-wide                           divided into five subregions that are
     comments and issuances in this docket                                    Reliability Standard does not; and (2) a                            identified as Southeastern, Central,
     may do so at http://www.ferc.gov/docs-                                   regional Reliability Standard that is                               VACAR, Delta, and Gateway.
     filing/docs-filing.asp.                                                  necessitated by a physical difference in the
     FOR FURTHER INFORMATION CONTACT:                                         Bulk-Power System.                                                    Type of Respondents: Entities
     Ellen Brown may be reached by email                                        When NERC reviews a regional                                      registered with the North American
     at DataClearance@FERC.gov, telephone                                     Reliability Standard that would be                                  Electric Reliability Corporation (within
     at (202) 502–8663, and fax at (202) 273–                                 applicable on an interconnection-wide                               the SERC region).
     0873.                                                                    basis and that has been proposed by a                                 Estimate of Annual Burden: 1 The
     SUPPLEMENTARY INFORMATION:                                               Regional Entity organized on an                                     Commission estimates the annual
        Title: Mandatory Reliability Standards                                interconnection-wide basis, NERC must                               reporting burden and cost for the
     for the SERC Region.                                                     rebuttably presume that the regional                                information collection as:

                                             FERC–725K—MANDATORY RELIABILITY STANDARD FOR THE SERC REGION
                                                                                                  Annual num-                                    Average                 Total annual        Cost per
                                                                        Number of                     ber of                Total number        burden and               burden hours       respondent
                                                                       respondents               responses per              of responses         cost per                  and total            ($)
                                                                                                   respondent                                   response 2                annual cost

                                                                               (1)                        (2)               (1) * (2) = (3)            (4)               (3) * (4) = ( 5)    (5) ÷ (1)

     PCs: Design and Document Automatic
      UFLS Program .....................................                               3 21                            1                 21                   8                   168           $535.20
                                                                                                                                                        $535.20             $11,239.20
     PCs: Provide Documentation and Data to
      SERC ....................................................                        3 21                            1                 21                  16                    336          1,070.40
                                                                                                                                                      $1,070.40             $22,478.40
     GOs: Provide Documentation and Data
      to SERC ...............................................                        4 104                            1                104                   16                  1,664          1,070.40
                                                                                                                                                      $1,070.40            $111,321.60
     GOs: Record Retention ...........................                               4 104                             1               104                    4                    416            267.60
                                                                                                                                                       $267.60              $27,830.40

           Total ..................................................   ........................   ........................              125    ........................           2,584          2,943.60
                                                                                                                                                                           $172,869.60




        1 ‘‘Burden’’ is defined as the total time, effort, or                 information to or for a Federal agency. For further                 collection burden, reference 5 Code of Federal
     financial resources expended by persons to                               explanation of what is included in the information                  Regulations 1320.3.
     generate, maintain, retain, or disclose or provide



VerDate Sep<11>2014        17:10 Dec 07, 2018         Jkt 247001      PO 00000        Frm 00030       Fmt 4703        Sfmt 4703   E:\FR\FM\10DEN1.SGM         10DEN1


     63496                       Federal Register / Vol. 83, No. 236 / Monday, December 10, 2018 / Notices

       Comments: Comments are invited on:                    NYISO Business Issues Committee                       DEPARTMENT OF ENERGY
     (1) Whether the collection of                           Meeting
     information is necessary for the proper                                                                       Federal Energy Regulatory
     performance of the functions of the                     December 12, 2018, 10 a.m.–4 p.m.                     Commission
     Commission, including whether the                       (EST)
                                                                                                                   [Docket No. ER19–461–000]
     information will have practical utility;                  The above-referenced meeting will be
     (2) the accuracy of the agency’s estimate               via web conference and teleconference.                Supplemental Notice That Initial
     of the burden and cost of the collection                                                                      Market-Based Rate Filing Includes
     of information, including the validity of                 The above-referenced meeting is open                Request for Blanket Section 204
     the methodology and assumptions used;                   to stakeholders.                                      Authorization; Wheelabrator Concord
     (3) ways to enhance the quality, utility                  Further information may be found at:                Company, L.P.
     and clarity of the information collection;              http://www.nyiso.com/public/
     and (4) ways to minimize the burden of                                                                           This is a supplemental notice in the
                                                             committees/documents.jsp?com=                         above-referenced proceeding of
     the collection of information on those                  bic&directory=2018-12-12.
     who are to respond, including the use                                                                         Wheelabrator Concord Company, L.P.’s
     of automated collection techniques or                   NYISO Operating Committee Meeting                     application for market-based rate
     other forms of information technology.                                                                        authority, with an accompanying rate
                                                             December 13, 2018, 10 a.m.–4 p.m.                     tariff, noting that such application
       Dated: November 30, 2018.                             (EST)                                                 includes a request for blanket
     Kimberly D. Bose,                                                                                             authorization, under 18 CFR part 34, of
                                                               The above-referenced meeting will be
     Secretary.                                                                                                    future issuances of securities and
                                                             via web conference and teleconference.                assumptions of liability.
     [FR Doc. 2018–26664 Filed 12–7–18; 8:45 am]
                                                               The above-referenced meeting is open                   Any person desiring to intervene or to
     BILLING CODE 6717–01–P
                                                             to stakeholders.                                      protest should file with the Federal
                                                               Further information may be found at:                Energy Regulatory Commission, 888
     DEPARTMENT OF ENERGY                                    http://www.nyiso.com/public/                          First Street NE, Washington, DC 20426,
                                                             committees/documents.jsp?                             in accordance with Rules 211 and 214
     Federal Energy Regulatory                                                                                     of the Commission’s Rules of Practice
                                                             com=oc&directory=2018-12-13.
     Commission                                                                                                    and Procedure (18 CFR 385.211 and
                                                             NYISO Management Committee                            385.214). Anyone filing a motion to
     Notice of Commission Staff                              Meeting                                               intervene or protest must serve a copy
     Attendance                                                                                                    of that document on the Applicant.
                                                             December 19, 2018, 10 a.m.–4 p.m.                        Notice is hereby given that the
     December 3, 2018.                                       (EST)                                                 deadline for filing protests with regard
        The Federal Energy Regulatory                                                                              to the applicant’s request for blanket
                                                                The above-referenced meeting will be
     Commission (Commission) hereby gives                                                                          authorization, under 18 CFR part 34, of
                                                             via web conference and teleconference.
     notice that members of the                                                                                    future issuances of securities and
                                                                The above-referenced meeting is open               assumptions of liability, is December 24,
     Commission’s staff may attend the
     following meetings related to the                       to stakeholders.                                      2018.
     transmission planning activities of the                    Further information may be found at:                  The Commission encourages
     New York Independent System                             http://www.nyiso.com/public/                          electronic submission of protests and
     Operator, Inc. (NYISO):                                 committees/documents.jsp?com=                         interventions in lieu of paper, using the
                                                             mc&directory=2018-12-19.                              FERC Online links at http://
     NYISO Electric System Planning                                                                                www.ferc.gov. To facilitate electronic
     Working Group and Transmission                             The discussions at the meetings                    service, persons with internet access
     Planning Advisory Meeting                               described above may address matters at                who will eFile a document and/or be
                                                             issue in the following proceedings:                   listed as a contact for an intervenor
     December 4, 2018, 10 a.m.–4 p.m. (EST)                                                                        must create and validate an
                                                                New York Independent System
       The above-referenced meeting will be                  Operator, Inc., Docket No. ER15–2059.                 eRegistration account using the
     via web conference and teleconference.                                                                        eRegistration link. Select the eFiling
                                                                New York Independent System
                                                                                                                   link to log on and submit the
       The above-referenced meeting is open                  Operator, Inc., Docket No. ER17–2327.                 intervention or protests.
     to stakeholders.                                           For more information, contact James                   Persons unable to file electronically
       Further information may be found at:                  Eason, Office of Energy Market                        should submit an original and 5 copies
     http://www.nyiso.com/public/                            Regulation, Federal Energy Regulatory                 of the intervention or protest to the
     committees/documents.jsp?com=bic_                       Commission at (202) 502–8622 or                       Federal Energy Regulatory Commission,
     espwg&directory=2018-12-04.                             James.Eason@ferc.gov.                                 888 First Street NE, Washington, DC
                                                                                                                   20426.
        2 The estimated hourly cost (salary plus benefits)
                                                             Kimberly D. Bose,                                        The filings in the above-referenced
     provided in this section is based on the salary         Secretary.                                            proceeding are accessible in the
     figures (http://www.bls.gov/oes/current/naics2_         [FR Doc. 2018–26661 Filed 12–7–18; 8:45 am]           Commission’s eLibrary system by
     22.htm) and benefits (http://www.bls.gov/
     news.release/ecec.nr0.htm) for May 2017 posted by       BILLING CODE 6717–01–P                                clicking on the appropriate link in the
     the Bureau of Labor Statistics for the Utilities                                                              above list. They are also available for
     sector. The hourly estimates for salary plus benefits                                                         electronic review in the Commission’s
     are $66.90/hour based on the Engineering career                                                               Public Reference Room in Washington,
     (Occupation Code: 17–2071).
        3 Both figures for PC respondents are not to be
                                                                                                                   DC. There is an eSubscription link on
     totaled. They represent the same set of respondents.                                                          the website that enables subscribers to
        4 Both figures for GO respondents are not to be                                                            receive email notification when a
     totaled. They represent the same set of respondents.                                                          document is added to a subscribed


VerDate Sep<11>2014   17:10 Dec 07, 2018   Jkt 247001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\10DEN1.SGM   10DEN1



Document Created: 2018-12-08 00:22:10
Document Modified: 2018-12-08 00:22:10
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due February 8, 2019.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.