83_FR_6581 83 FR 6550 - Algonquin Power (Beaver Falls), LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

83 FR 6550 - Algonquin Power (Beaver Falls), LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 31 (February 14, 2018)

Page Range6550-6551
FR Document2018-03007

Federal Register, Volume 83 Issue 31 (Wednesday, February 14, 2018)
[Federal Register Volume 83, Number 31 (Wednesday, February 14, 2018)]
[Notices]
[Pages 6550-6551]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-03007]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 2593-031; 2823-020]


Algonquin Power (Beaver Falls), LLC; Notice of Application 
Accepted for Filing, Soliciting Motions To Intervene and Protests, 
Ready for Environmental Analysis, and Soliciting Comments, 
Recommendations, Terms and Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Major License.
    b. Project Nos.: 2593-031 and 2823-020.
    c. Date filed: December 30, 2015, supplemented by a settlement 
agreement filed August 24, 2017.
    d. Applicant: Algonquin Power (Beaver Falls), LLC.
    e. Name of Project: Upper Beaver Falls and Lower Beaver Falls 
Hydroelectric Projects.
    f. Location: On the Beaver River, in the towns of Croghan and New 
Bremen, Lewis County, New York. The projects do not occupy lands of the 
United States.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Robert Gates, Executive Vice President, Eagle 
Creek Renewables Energy, LLC, 116 N. State Street P.O. Box 167, 
Neshkoro, WI 54960-0167; (973) 998-8400; [email protected].
    i. FERC Contact: Andy Bernick, (202) 502-8660 or 
[email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, terms and conditions, and prescriptions: 60 days from 
the issuance date of this notice; reply comments are due 105 days from 
the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests, comments, recommendations, terms and 
conditions, and prescriptions using the Commission's eFiling system at 
http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please 
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The 
first page of any filing should include docket numbers P-2593-031 and 
P-2823-020.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The existing project works are as follows:
    The Upper Beaver Falls Project consists of: (1) A 328-foot-long, 
25-foot-high concrete gravity dam with an uncontrolled overflow 
spillway; (2) a 48-acre reservoir with a storage capacity of 800 acre-
feet at elevation 799.4 feet North American Vertical Datum of 1988 
(NAVD 88); (3) a 17-foot-high, 26.5-foot-wide, 27.5-foot-long intake 
structure with a steel trash rack ; (4) a 90-foot-long, 16-foot-wide, 
8-foot-high concrete penstock; (5) a powerhouse containing one turbine-
generator with a nameplate rating of 1,500 kilowatts (kW); (6) a 
tailrace excavated in the riverbed; (7) a 2,120-foot-long, 2.4-kilovolt 
(kV) overhead transmission line connecting to an existing National Grid 
substation; and (8) other appurtenances. The project generates about 
8,685 megawatt-hours (MWh) annually.
    The Lower Beaver Falls Project consists of: (1) A 400-foot-long 
concrete gravity dam with a maximum height of 14 feet, including: (i) a 
240-foot-long non-overflow section containing an 8-foot-wide spillway 
topped with flashboards ranging from 6 to 8 inches in height and (ii) a 
160-foot-long overflow section with an ice sluice opening; (2) a 4-acre 
reservoir with a storage capacity of 27.9 acre-feet at a normal 
elevation of 769.6 feet NAVD 88; (3) an intake structure with a steel 
trash rack, integral with a powerhouse containing two 500-kW turbine 
and generator units; (4) a tailrace; (5) a 250-foot-long, 2.4-kV 
transmission line connected to the Upper Beaver Falls powerhouse; and 
(6) appurtenant facilities. The project generates about 5,617 MWh 
annually.
    The Lower Beaver Falls Project is located approximately 600 feet 
downstream of the Upper Beaver Falls Project. The dams and existing 
project facilities for both projects are owned by the applicant. As 
described in its August 24, 2017, settlement agreement with the U.S. 
Fish and Wildlife Service (FWS) and New York State Department of 
Environmental Conservation (New York DEC), the applicant proposes the 
following changes to project facilities and operation: (1) both 
projects would be consolidated under a single license; (2) the 
consolidated project would operate in strict run-of-river mode; (3) a 
year-round minimum flow of 30 cubic feet per second (cfs) would be 
maintained in the Upper Project bypassed reach and at the Lower 
Project; (4) trash racks would be replaced at the Upper Project to 
provide 1-inch clear spacing, and a seasonal overlay system would be 
placed at the Lower Project; and (5) recreational enhancements, 
including a boat launch, fishing access, canoe take-out, and parking 
area, would be provided at a location determined through consultation 
with FWS and New York DEC.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests or other 
comments filed, but only those who file a motion to intervene in 
accordance with the Commission's Rules may become a party to the 
proceeding. Any comments, protests, or motions to intervene must be 
received on or before the specified deadline date for the particular 
application.
    All filings must (1) bear in all capital letters the title PROTEST, 
MOTION TO INTERVENE, COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS 
AND CONDITIONS, or PRESCRIPTIONS; (2) set forth in the heading the name 
of the applicant and the project number of the application to which the 
filing responds; (3) furnish the name, address, and telephone number of 
the person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR

[[Page 6551]]

385.2001 through 385.2005. Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    p. Procedural Schedule:
    The application will be processed according to the following 
revised Hydro Licensing Schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Filing of comments, recommendations,     April 2018.
 terms and conditions, and
 prescriptions.
Reply comments due.....................  May 2018.
Commission issues EA...................  October 2018.
Comments on EA due.....................  November 2018.
------------------------------------------------------------------------


    Dated: February 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-03007 Filed 2-13-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               6550                      Federal Register / Vol. 83, No. 31 / Wednesday, February 14, 2018 / Notices

                                                 Dated: February 8, 2018.                              (202) 502–8659 (TTY). In lieu of                      Project. The dams and existing project
                                               Kimberly D. Bose,                                       electronic filing, please send a paper                facilities for both projects are owned by
                                               Secretary.                                              copy to: Secretary, Federal Energy                    the applicant. As described in its
                                               [FR Doc. 2018–03008 Filed 2–13–18; 8:45 am]             Regulatory Commission, 888 First Street               August 24, 2017, settlement agreement
                                               BILLING CODE 6717–01–P
                                                                                                       NE, Washington, DC 20426. The first                   with the U.S. Fish and Wildlife Service
                                                                                                       page of any filing should include docket              (FWS) and New York State Department
                                                                                                       numbers P–2593–031 and P–2823–020.                    of Environmental Conservation (New
                                               DEPARTMENT OF ENERGY                                       The Commission’s Rules of Practice                 York DEC), the applicant proposes the
                                                                                                       require all intervenors filing documents              following changes to project facilities
                                               Federal Energy Regulatory                               with the Commission to serve a copy of                and operation: (1) both projects would
                                               Commission                                              that document on each person on the                   be consolidated under a single license;
                                                                                                       official service list for the project.                (2) the consolidated project would
                                               [Project Nos. 2593–031; 2823–020]
                                                                                                       Further, if an intervenor files comments              operate in strict run-of-river mode; (3) a
                                               Algonquin Power (Beaver Falls), LLC;                    or documents with the Commission                      year-round minimum flow of 30 cubic
                                               Notice of Application Accepted for                      relating to the merits of an issue that               feet per second (cfs) would be
                                               Filing, Soliciting Motions To Intervene                 may affect the responsibilities of a                  maintained in the Upper Project
                                               and Protests, Ready for Environmental                   particular resource agency, they must                 bypassed reach and at the Lower
                                               Analysis, and Soliciting Comments,                      also serve a copy of the document on                  Project; (4) trash racks would be
                                               Recommendations, Terms and                              that resource agency.                                 replaced at the Upper Project to provide
                                                                                                          k. This application has been accepted              1-inch clear spacing, and a seasonal
                                               Conditions, and Prescriptions
                                                                                                       for filing and is now ready for                       overlay system would be placed at the
                                                 Take notice that the following                        environmental analysis.                               Lower Project; and (5) recreational
                                               hydroelectric application has been filed                   l. The existing project works are as               enhancements, including a boat launch,
                                               with the Commission and is available                    follows:                                              fishing access, canoe take-out, and
                                               for public inspection.                                     The Upper Beaver Falls Project                     parking area, would be provided at a
                                                 a. Type of Application: Subsequent                    consists of: (1) A 328-foot-long, 25-foot-            location determined through
                                               Major License.                                          high concrete gravity dam with an                     consultation with FWS and New York
                                                 b. Project Nos.: 2593–031 and 2823–                   uncontrolled overflow spillway; (2) a                 DEC.
                                               020.                                                    48-acre reservoir with a storage capacity                m. A copy of the application is
                                                 c. Date filed: December 30, 2015,                     of 800 acre-feet at elevation 799.4 feet              available for review at the Commission
                                               supplemented by a settlement                            North American Vertical Datum of 1988                 in the Public Reference Room or may be
                                               agreement filed August 24, 2017.                        (NAVD 88); (3) a 17-foot-high, 26.5-foot-             viewed on the Commission’s website at
                                                 d. Applicant: Algonquin Power                         wide, 27.5-foot-long intake structure                 http://www.ferc.gov using the eLibrary
                                               (Beaver Falls), LLC.                                    with a steel trash rack ; (4) a 90-foot-              link. Enter the docket number excluding
                                                 e. Name of Project: Upper Beaver                      long, 16-foot-wide, 8-foot-high concrete              the last three digits in the docket
                                               Falls and Lower Beaver Falls                            penstock; (5) a powerhouse containing                 number field to access the document.
                                               Hydroelectric Projects.                                 one turbine-generator with a nameplate                For assistance, contact FERC Online
                                                 f. Location: On the Beaver River, in                  rating of 1,500 kilowatts (kW); (6) a                 Support. A copy is also available for
                                               the towns of Croghan and New Bremen,                    tailrace excavated in the riverbed; (7) a             inspection and reproduction at the
                                               Lewis County, New York. The projects                    2,120-foot-long, 2.4-kilovolt (kV)                    address in item h above.
                                               do not occupy lands of the United                       overhead transmission line connecting                    n. Anyone may submit comments, a
                                               States.                                                 to an existing National Grid substation;              protest, or a motion to intervene in
                                                 g. Filed Pursuant to: Federal Power                   and (8) other appurtenances. The project              accordance with the requirements of
                                               Act, 16 U.S.C. 791 (a)–825(r).                          generates about 8,685 megawatt-hours                  Rules of Practice and Procedure, 18 CFR
                                                 h. Applicant Contact: Robert Gates,                   (MWh) annually.                                       385.210, 385.211, and 385.214. In
                                               Executive Vice President, Eagle Creek                      The Lower Beaver Falls Project                     determining the appropriate action to
                                               Renewables Energy, LLC, 116 N. State                    consists of: (1) A 400-foot-long concrete             take, the Commission will consider all
                                               Street P.O. Box 167, Neshkoro, WI                       gravity dam with a maximum height of                  protests or other comments filed, but
                                               54960–0167; (973) 998–8400;                             14 feet, including: (i) a 240-foot-long               only those who file a motion to
                                               bob.gates@eaglecreekre.com.                             non-overflow section containing an 8-                 intervene in accordance with the
                                                 i. FERC Contact: Andy Bernick, (202)                  foot-wide spillway topped with                        Commission’s Rules may become a
                                               502–8660 or andrew.bernick@ferc.gov.                    flashboards ranging from 6 to 8 inches                party to the proceeding. Any comments,
                                                  j. Deadline for filing motions to                    in height and (ii) a 160-foot-long                    protests, or motions to intervene must
                                               intervene and protests, comments,                       overflow section with an ice sluice                   be received on or before the specified
                                               recommendations, terms and                              opening; (2) a 4-acre reservoir with a                deadline date for the particular
                                               conditions, and prescriptions: 60 days                  storage capacity of 27.9 acre-feet at a               application.
                                               from the issuance date of this notice;                  normal elevation of 769.6 feet NAVD 88;                  All filings must (1) bear in all capital
                                               reply comments are due 105 days from                    (3) an intake structure with a steel trash            letters the title PROTEST, MOTION TO
                                               the issuance date of this notice.                       rack, integral with a powerhouse                      INTERVENE, COMMENTS, REPLY
                                                  The Commission strongly encourages                   containing two 500-kW turbine and                     COMMENTS, RECOMMENDATIONS,
                                               electronic filing. Please file motions to               generator units; (4) a tailrace; (5) a 250-           TERMS AND CONDITIONS, or
                                               intervene and protests, comments,                       foot-long, 2.4-kV transmission line                   PRESCRIPTIONS; (2) set forth in the
daltland on DSKBBV9HB2PROD with NOTICES




                                               recommendations, terms and                              connected to the Upper Beaver Falls                   heading the name of the applicant and
                                               conditions, and prescriptions using the                 powerhouse; and (6) appurtenant                       the project number of the application to
                                               Commission’s eFiling system at http://                  facilities. The project generates about               which the filing responds; (3) furnish
                                               www.ferc.gov/docs-filing/efiling.asp. For               5,617 MWh annually.                                   the name, address, and telephone
                                               assistance, please contact FERC Online                     The Lower Beaver Falls Project is                  number of the person protesting or
                                               Support at FERCOnlineSupport@                           located approximately 600 feet                        intervening; and (4) otherwise comply
                                               ferc.gov, (866) 208–3676 (toll free), or                downstream of the Upper Beaver Falls                  with the requirements of 18 CFR


                                          VerDate Sep<11>2014   22:07 Feb 13, 2018   Jkt 244001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\14FEN1.SGM   14FEN1


                                                                                  Federal Register / Vol. 83, No. 31 / Wednesday, February 14, 2018 / Notices                                                                                         6551

                                               385.2001 through 385.2005. Agencies                                     email of new filings and issuances                                        agency received the request; or (3)
                                               may obtain copies of the application                                    related to this or other pending projects.                                evidence of waiver of water quality
                                               directly from the applicant. A copy of                                  For assistance, contact FERC Online                                       certification.
                                               any protest or motion to intervene must                                 Support.                                                                    p. Procedural Schedule:
                                               be served upon each representative of                                      o. A license applicant must file no
                                               the applicant specified in the particular                               later than 60 days following the date of                                    The application will be processed
                                               application.                                                            issuance of this notice: (1) A copy of the                                according to the following revised
                                                 You may also register online at http://                               water quality certification; (2) a copy of                                Hydro Licensing Schedule. Revisions to
                                               www.ferc.gov/docs-filing/                                               the request for certification, including                                  the schedule may be made as
                                               esubscription.asp to be notified via                                    proof of the date on which the certifying                                 appropriate.

                                                                                                                                     Milestone                                                                                                 Target date

                                               Filing of comments, recommendations, terms and conditions, and prescriptions ...........................................................................                                      April 2018.
                                               Reply comments due ........................................................................................................................................................................   May 2018.
                                               Commission issues EA .....................................................................................................................................................................    October 2018.
                                               Comments on EA due ......................................................................................................................................................................     November 2018.



                                                 Dated: February 8, 2018.                                              service, persons with internet access                                     Houston, Texas 77002–2700, filed in
                                               Kimberly D. Bose,                                                       who will eFile a document and/or be                                       Docket No. CP18–70–000 a prior notice
                                               Secretary.                                                              listed as a contact for an intervenor                                     request pursuant to sections 157.205
                                               [FR Doc. 2018–03007 Filed 2–13–18; 8:45 am]                             must create and validate an                                               and 157.213(b) of the Federal Energy
                                               BILLING CODE 6717–01–P
                                                                                                                       eRegistration account using the                                           Regulatory Commission’s (Commission)
                                                                                                                       eRegistration link. Select the eFiling                                    regulations under the Natural Gas Act
                                                                                                                       link to log on and submit the                                             (NGA) and Columbia’s blanket
                                               DEPARTMENT OF ENERGY                                                    intervention or protests.                                                 authorizations issued in Docket No.
                                                                                                                          Persons unable to file electronically                                  CP83–76–000. Columbia seeks
                                               Federal Energy Regulatory                                               should submit an original and 5 copies                                    authorization to construct and operate
                                               Commission                                                              of the intervention or protest to the                                     two new horizontal wells, all as more
                                                                                                                       Federal Energy Regulatory Commission,                                     fully set forth in the application which
                                               [Docket No. ER18–814–000]
                                                                                                                       888 First Street NE, Washington, DC                                       is on file with the Commission and open
                                               Carlsbad Energy Center LLC;                                             20426.                                                                    to public inspection. The filing may also
                                                                                                                          The filings in the above-referenced                                    be viewed on the web at http://
                                               Supplemental Notice That Initial
                                                                                                                       proceeding are accessible in the                                          www.ferc.gov using the ‘‘eLibrary’’ link.
                                               Market-Based Rate Filing Includes
                                                                                                                       Commission’s eLibrary system by                                           Enter the docket number excluding the
                                               Request for Blanket Section 204
                                                                                                                       clicking on the appropriate link in the                                   last three digits in the docket number
                                               Authorization
                                                                                                                       above list. They are also available for                                   field to access the document. For
                                                 This is a supplemental notice in the                                  electronic review in the Commission’s                                     assistance, contact FERC at
                                               above-referenced proceeding Carlsbad                                    Public Reference Room in Washington,                                      FERCOnlineSupport@ferc.gov or call
                                               Energy Center LLC’s application for                                     DC. There is an eSubscription link on                                     toll-free, (866) 208–3676 or TTY, (202)
                                               market-based rate authority, with an                                    the website that enables subscribers to                                   502–8659.
                                               accompanying rate tariff, noting that                                   receive email notification when a
                                               such application includes a request for                                 document is added to a subscribed                                            Columbia proposes to construct and
                                               blanket authorization, under 18 CFR                                     docket(s). For assistance with any FERC                                   operate in Ashland County, Ohio, two
                                               part 34, of future issuances of securities                              Online service, please email                                              new horizontal storage wells, designated
                                               and assumptions of liability.                                           FERCOnlineSupport@ferc.gov. or call                                       Well 12601 and Well 12602, and related
                                                 Any person desiring to intervene or to                                (866) 208–3676 (toll free). For TTY, call                                 pipelines and appurtenances at
                                               protest should file with the Federal                                    (202) 502–8659.                                                           Columbia’s Pavonia Storage Field,
                                               Energy Regulatory Commission, 888                                                                                                                 located in Ashland and Richland
                                                                                                                         Dated: February 8, 2018.                                                Counties, Ohio. Columbia states that the
                                               First Street NE, Washington, DC 20426,                                  Nathaniel J. Davis, Sr.,
                                               in accordance with Rules 211 and 214                                                                                                              new wells are focused on improving the
                                                                                                                       Deputy Secretary.                                                         field’s late season deliverability. There
                                               of the Commission’s Rules of Practice
                                               and Procedure (18 CFR 385.211 and
                                                                                                                       [FR Doc. 2018–03023 Filed 2–13–18; 8:45 am]                               will be no change in the certificated
                                               385.214). Anyone filing a motion to                                     BILLING CODE 6717–01–P                                                    physical parameters of the field,
                                               intervene or protest must serve a copy                                                                                                            including existing boundary, total
                                               of that document on the Applicant.                                                                                                                inventory, reservoir pressure, reservoir
                                                                                                                       DEPARTMENT OF ENERGY                                                      and buffer boundaries, or the
                                                 Notice is hereby given that the
                                               deadline for filing protests with regard                                                                                                          certificated storage capacity, as a result
                                                                                                                       Federal Energy Regulatory                                                 of the proposed project. The total cost
                                               to the applicant’s request for blanket                                  Commission
                                               authorization, under 18 CFR part 34, of                                                                                                           is approximately $6,000,000.
                                               future issuances of securities and                                      [Docket No. CP18–70–000]                                                     Any questions regarding this
daltland on DSKBBV9HB2PROD with NOTICES




                                               assumptions of liability, is February 28,                                                                                                         Application should be directed to Linda
                                                                                                                       Columbia Gas Transmission, LLC;
                                               2018.                                                                                                                                             Farquhar, Manager, Project
                                                                                                                       Notice of Request Under Blanket
                                                 The Commission encourages                                                                                                                       Determinations & Regulatory
                                                                                                                       Authorization
                                               electronic submission of protests and                                                                                                             Administration, Columbia Gas
                                               interventions in lieu of paper, using the                                 Take notice that on January 29, 2018,                                   Transmission, LLC, 700 Louisiana
                                               FERC Online links at http://                                            Columbia Gas Transmission, LLC                                            Street, Suite 700, Houston, Texas
                                               www.ferc.gov. To facilitate electronic                                  (Columbia), 700 Louisiana Street,                                         77002–2700, by phone (832) 320–5685,


                                          VerDate Sep<11>2014        22:07 Feb 13, 2018        Jkt 244001      PO 00000       Frm 00045       Fmt 4703      Sfmt 4703       E:\FR\FM\14FEN1.SGM            14FEN1



Document Created: 2018-02-14 03:58:56
Document Modified: 2018-02-14 03:58:56
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 6550 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR