83_FR_7062 83 FR 7029 - Pine Creek Mine, LLC; Notice of Availability of Environmental Assessment

83 FR 7029 - Pine Creek Mine, LLC; Notice of Availability of Environmental Assessment

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 33 (February 16, 2018)

Page Range7029-7029
FR Document2018-03248

Federal Register, Volume 83 Issue 33 (Friday, February 16, 2018)
[Federal Register Volume 83, Number 33 (Friday, February 16, 2018)]
[Notices]
[Page 7029]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-03248]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12532-006]


Pine Creek Mine, LLC; Notice of Availability of Environmental 
Assessment

    In accordance with the National Environmental Policy Act of 1969, 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47,897), the Office 
of Energy Projects has reviewed Pine Creek Mine, LLC's (PCM or 
applicant) application for a license to construct its proposed Pine 
Creek Mine Tunnel Hydroelectric Project (Pine Creek Mine or project), 
and has prepared an Environmental Assessment (EA). The proposed 1.5-
megawatt (MW) project would be located largely inside the Pine Creek 
Mine tunnel and adjacent to Morgan Creek and Pine Creek in Inyo County, 
California. The project would occupy only subsurface federal lands 
managed the U.S. Forest Service.
    The EA contains Commission staff's analysis of the potential 
environmental impacts of the proposed hydroelectric project. The EA 
concludes that licensing the project, with appropriate environmental 
protective measures, would not constitute a major federal action that 
would significantly affect the quality of the human environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's website at 
www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, 
202-502-8659.
    You may also register online at www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Any comments and modified terms and conditions on the EA should be 
filed within 60 days from the date of this notice.
    The Commission strongly encourages electronic filings. Please file 
comments using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at http://www.ferc.gov/docs-filing/ecomment.asp.
    You must include your name and contact information at the end of 
your comments. For assistance, please contact FERC Online Support. In 
lieu of electronic filing, please send a paper copy to: Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426. Please affix ``Project No. 12532-006'' to all comments.
    Please contact Quinn Emmering (Commission Staff) by telephone at 
(202) 502-6382, or by email at quinn.emmering@ferc.gov, if you have any 
questions.

    Dated: February 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-03248 Filed 2-15-18; 8:45 am]
BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 83, No. 33 / Friday, February 16, 2018 / Notices                                                     7029

                                               HISTORY:                                                   Any comments and modified terms                    construction and operation of the North
                                                  The System of Records entitled                       and conditions on the EA should be                    Seattle Lateral Upgrade Project in
                                               ‘‘Departmental Parking Control Policy’’                 filed within 60 days from the date of                 accordance with the requirements of the
                                               (18–05–01) was last published in the                    this notice.                                          National Environmental Policy Act
                                               Federal Register at 64 FR 30106, 30122–                    The Commission strongly encourages                 (NEPA). The FERC staff concludes that
                                               30123 (June 4, 1999).                                   electronic filings. Please file comments              approval of the proposed project, with
                                               [FR Doc. 2018–03276 Filed 2–15–18; 8:45 am]             using the Commission’s eFiling system                 appropriate mitigating measures, would
                                               BILLING CODE 4000–01–P
                                                                                                       at http://www.ferc.gov/docs-filing/                   not constitute a major federal action
                                                                                                       efiling.asp. Commenters can submit                    significantly affecting the quality of the
                                                                                                       brief comments up to 6,000 characters,                human environment.
                                                                                                       without prior registration, using the                    The proposed North Seattle Lateral
                                               DEPARTMENT OF ENERGY
                                                                                                       eComment system at http://                            Upgrade Project would consist of the
                                               Federal Energy Regulatory                               www.ferc.gov/docs-filing/                             following facilities:
                                               Commission                                              ecomment.asp.                                            • Replace 5.9-miles of 8-inch-
                                                                                                          You must include your name and                     diameter pipeline with 20-inch-
                                               [Project No. 12532–006]                                 contact information at the end of your                diameter pipeline;
                                                                                                       comments. For assistance, please                         • rebuild the existing North Seattle/
                                               Pine Creek Mine, LLC; Notice of                         contact FERC Online Support. In lieu of               Everett meter station in order to
                                               Availability of Environmental                           electronic filing, please send a paper                accommodate the increased delivery
                                               Assessment                                              copy to: Secretary, Federal Energy                    capacity of the North Seattle Lateral;
                                                  In accordance with the National                      Regulatory Commission, 888 First Street                  • abandon and relocate
                                               Environmental Policy Act of 1969, and                   NE, Washington, DC 20426. Please affix                approximately 0.1 mile of 16-inch-
                                               the Federal Energy Regulatory                           ‘‘Project No. 12532–006’’ to all                      diameter pipeline;
                                               Commission’s (Commission)                               comments.                                                • relocate an existing 8-inch pig
                                               regulations, 18 CFR part 380 (Order No.                    Please contact Quinn Emmering                      launcher and a 20-inch pig receiver 1 to
                                               486, 52 FR 47,897), the Office of Energy                (Commission Staff) by telephone at                    project milepost 7.76; and
                                               Projects has reviewed Pine Creek Mine,                  (202) 502–6382, or by email at                           • replace an existing 8-inch mainline
                                               LLC’s (PCM or applicant) application for                quinn.emmering@ferc.gov, if you have                  valve with a 20-inch valve.
                                               a license to construct its proposed Pine                any questions.                                           The FERC staff mailed copies of the
                                               Creek Mine Tunnel Hydroelectric                           Dated: February 12, 2018.
                                                                                                                                                             EA to federal, state, and local
                                               Project (Pine Creek Mine or project), and                                                                     government representatives and
                                                                                                       Kimberly D. Bose,
                                               has prepared an Environmental                                                                                 agencies; elected officials; Native
                                                                                                       Secretary.                                            American tribes; potentially affected
                                               Assessment (EA). The proposed 1.5-                      [FR Doc. 2018–03248 Filed 2–15–18; 8:45 am]
                                               megawatt (MW) project would be                                                                                landowners and other interested
                                               located largely inside the Pine Creek
                                                                                                       BILLING CODE 6717–01–P                                individuals and groups; and newspapers
                                               Mine tunnel and adjacent to Morgan                                                                            and libraries in the project area. In
                                               Creek and Pine Creek in Inyo County,                                                                          addition, the EA is available for public
                                                                                                       DEPARTMENT OF ENERGY                                  viewing on the FERC’s website
                                               California. The project would occupy
                                               only subsurface federal lands managed                                                                         (www.ferc.gov) using the eLibrary link.
                                                                                                       Federal Energy Regulatory
                                               the U.S. Forest Service.                                                                                      A limited number of copies of the EA
                                                                                                       Commission
                                                  The EA contains Commission staff’s                                                                         are available for distribution and public
                                               analysis of the potential environmental                 [Docket Nos. CP17–441–000, CP17–441–                  inspection at: Federal Energy Regulatory
                                               impacts of the proposed hydroelectric                   001]                                                  Commission, Public Reference Room,
                                               project. The EA concludes that licensing                                                                      888 First Street NE, Room 2A,
                                                                                                       Northwest Pipeline LLC; Notice of                     Washington, DC 20426, (202) 502–8371.
                                               the project, with appropriate                           Availability of the Environmental
                                               environmental protective measures,                                                                               Any person wishing to comment on
                                                                                                       Assessment for the Proposed North                     the EA may do so. Your comments
                                               would not constitute a major federal                    Seattle Lateral Upgrade Project
                                               action that would significantly affect the                                                                    should focus on the potential
                                               quality of the human environment.                         The staff of the Federal Energy                     environmental effects, reasonable
                                                  A copy of the EA is available for                    Regulatory Commission (FERC or                        alternatives, and measures to avoid or
                                               review at the Commission in the Public                  Commission) has prepared an                           lessen environmental impacts. The more
                                               Reference Room or may be viewed on                      environmental assessment (EA) for the                 specific your comments, the more useful
                                               the Commission’s website at                             North Seattle Lateral Upgrade Project,                they will be. To ensure that the
                                               www.ferc.gov using the ‘‘eLibrary’’ link.               proposed by Northwest Pipeline LLC                    Commission has the opportunity to
                                               Enter the docket number excluding the                   (Northwest) in the above-referenced                   consider your comments prior to
                                               last three digits in the docket number                  docket. Northwest requests                            making its decision on this project, it is
                                               field to access the document. For                       authorization to replace approximately                important that we receive your
                                               assistance, contact FERC Online                         5.9 miles of 8-inch-diameter natural gas              comments in Washington, DC on or
                                               Support at FERCOnlineSupport@                           pipeline with 20-inch-diameter pipeline               before March 13, 2018.
                                               ferc.gov or toll-free at 1–866–208–3676,                in Snohomish County, Washington.                         For your convenience, there are three
                                               or for TTY, 202–502–8659.                               According to Northwest, the North                     methods you can use to file your
daltland on DSKBBV9HB2PROD with NOTICES




                                                  You may also register online at                      Seattle Lateral Upgrade Project would                 comments to the Commission. In all
                                               www.ferc.gov/docs-filing/                               increase service reliability and enable               instances, please reference the project
                                               esubscription.asp to be notified via                    Northwest to provide an incremental                   docket number (CP17–441–000 and
                                               email of new filings and issuances                      159,299 dekatherms per day of firm                      1 A ‘‘pig’’ is a tool that the pipeline company
                                               related to this or other pending projects.              capacity to serve Puget Sound Energy.                 inserts into and pushes through the pipeline for
                                               For assistance, contact FERC Online                       The EA assesses the potential                       cleaning the pipeline, conducting internal
                                               Support.                                                environmental effects of the                          inspections, or other purposes.



                                          VerDate Sep<11>2014   19:24 Feb 15, 2018   Jkt 244001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\16FEN1.SGM   16FEN1



Document Created: 2018-02-16 00:55:25
Document Modified: 2018-02-16 00:55:25
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 7029 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR