83_FR_9055 83 FR 9013 - Notice of Issuance of Final Determination Concerning Certain Ethernet Gateway Products

83 FR 9013 - Notice of Issuance of Final Determination Concerning Certain Ethernet Gateway Products

DEPARTMENT OF HOMELAND SECURITY
U.S. Customs and Border Protection

Federal Register Volume 83, Issue 42 (March 2, 2018)

Page Range9013-9015
FR Document2018-04278

This document provides notice that U.S. Customs and Border Protection (``CBP'') has issued a final determination concerning the country of origin of certain ethernet gateway products known as AirLink gateways. Based upon the facts presented, CBP has concluded in the final determination that the United States is the country of origin of the AirLink gateways for purposes of U.S. Government procurement.

Federal Register, Volume 83 Issue 42 (Friday, March 2, 2018)
[Federal Register Volume 83, Number 42 (Friday, March 2, 2018)]
[Notices]
[Pages 9013-9015]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-04278]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

U.S. Customs and Border Protection


Notice of Issuance of Final Determination Concerning Certain 
Ethernet Gateway Products

AGENCY: U.S. Customs and Border Protection, Department of Homeland 
Security.

ACTION: Notice of final determination.

-----------------------------------------------------------------------

SUMMARY: This document provides notice that U.S. Customs and Border 
Protection (``CBP'') has issued a final determination concerning the 
country of origin of certain ethernet gateway products known as AirLink 
gateways. Based upon the facts presented, CBP has concluded in the 
final determination that the United States is the country of origin of 
the AirLink gateways for purposes of U.S. Government procurement.

DATES: The final determination was issued on February 23, 2018. A copy 
of the final determination is attached. Any party-at-interest, as 
defined in 19 CFR Sec.  177.22(d), may seek judicial review of this 
final determination within April 2, 2018.

FOR FURTHER INFORMATION CONTACT: Ross M. Cunningham, Valuation and 
Special Programs Branch, Regulations and Rulings, Office of Trade (202) 
325-0034.

SUPPLEMENTARY INFORMATION: Notice is hereby given that on February 23, 
2018, pursuant to subpart B of Part 177, U.S. Customs and Border 
Protection Regulations (19 CFR part 177, subpart B), CBP issued a final 
determination concerning the country of origin of certain ethernet 
gateway products known as AirLink gateways, which may be offered to the 
U.S. Government under an undesignated government procurement contract. 
This final determination, HQ H250154, was issued under procedures set 
forth at 19 CFR part 177, subpart B, which implements Title III of the 
Trade Agreements Act of 1979, as amended (19 U.S.C. 2511-18). In the 
final determination, CBP concluded that, based upon the facts 
presented, the programming and downloading operations performed in the 
United States, using U.S.-origin software, substantially transform non-
TAA country AirLink gateways. Therefore, the country of origin of the 
AirLink gateways is the United States for purposes of U.S. Government 
procurement.
    Section 177.29, CBP Regulations (19 CFR 177.29), provides that a 
notice of final determination shall be published in the Federal 
Register within 60 days of the date the final determination is issued. 
Section 177.30, CBP Regulations (19 CFR 177.30), provides that any 
party-at-interest, as defined in 19 CFR 177.22(d), may seek judicial 
review of a final determination within 30 days of publication of such 
determination in the Federal Register.

    Dated: February 23, 2018.
Alice A. Kipel,
Executive Director, Regulations and Rulings, Office of Trade.

HQ H250154

February 23, 2018

OT:RR:CTF:VS H250154 GaK/RMC

CATEGORY: Origin

Mark J. Segrist Sandler, Travis & Rosenberg, P.A. 225 West Washington 
Street, Suite 1640 Chicago, IL 60606

Re: U.S. Government Procurement; Country of Origin of Gateway Products; 
Substantial Transformation

Dear Mr. Segrist:

    This is in response to your letter dated October 25, 2013, and 
your supplemental submissions dated February 27, 2014 and March 21, 
2014, requesting a final determination on behalf of your client, 
Sierra Wireless (``Sierra''), pursuant to subpart B of Part 177 of 
the U.S. Customs and Border Protection (``CBP'') Regulations (19 
C.F.R. Part 177). A meeting was held at our office on October 3, 
2014, where you and your client explained the software development 
process and the product. A further submission dated April 18, 2017, 
was provided.
    This final determination concerns the country of origin of 
Sierra's secure Ethernet gateway products (``gateways''). We note 
that as a U.S. importer, Sierra is a party-at-interest within the 
meaning of 19 C.F.R. Sec.  177.22(d)(1) and is entitled to request 
this final determination.
    Per your letter dated September 22, 2014, we have reviewed your 
request for confidentiality pursuant to 19 C.F.R. Sec.  177.2(b)(7) 
with respect to the information submitted. As that information 
constitutes privileged or confidential matters, it has been 
bracketed and will be deleted from any published versions.

FACTS:

    Sierra produces gateways that provide secure internet 
connectivity for mobile stations allowing a variety of enterprises, 
mainly law enforcement, to monitor their infrastructure and 
instruments by transmitting and receiving data from a central 
location. The gateways are designed for entities that require 24/7 
unmanned operation of remote assets and broadband connectivity. The 
gateways are frequently installed in police cars and provide a 24/7 
internet connection and allow police officers to access information 
stored in the central location. The gateway also acts as a firewall 
server, which ensures that the connection between the mobile station 
and the main office is secure and that unauthorized persons cannot 
access information transmitted over the internet. Sierra's 
submissions include details on four different gateway products, 
branded ``AirLink,'' to be covered by this final determination: 
GX400, GX440, LS300, and ES440. The different series of gateways are 
designed differently to meet the needs of a variety of customers\1\, 
but they have the same functions and operate with the same software, 
referred to as Aleos.
---------------------------------------------------------------------------

    \1\ The GX series are designed for in-vehicle field deployments, 
such as connecting police cars or fire trucks to their network at 
headquarters. The LS series is designed for hazardous environments 
and for industrial deployments, such as surveillance of pipelines or 
meters. The ES series is designed to provide connectivity when 
landline connections are unavailable and can be used to maintain 
kiosks and retail operations online.
---------------------------------------------------------------------------

    The hardware components consist of a case/kit that holds the 
module, a printed circuit assembly (``PCA'') that includes a radio 
module, a decorative cover placed over the case/kit, and various 
nuts and screws to close the case/kit and hold the cover in place. 
All the hardware components are designed in the United States and 
produced and assembled in China. Sierra imports the completed 
gateways into the United States, where authorized retailers install 
the ALEOS software. Sierra states that, at the time of importation, 
the fully assembled gateway is not functional because it does not 
contain the ALEOS software. Sierra also states that the gateway in 
its condition as imported has only the basic ability to communicate 
with a software installation tool to facilitate the download of the 
ALEOS software. The radio module contains firmware to control its 
internal function of sending and receiving to/from the network, 
which cannot take place until the ALEOS software is loaded onto the 
gateway. Sierra states that the PCA design and the firmware in the 
radio module are proprietary and are designed to work only with the 
ALEOS software and that any

[[Page 9014]]

attempts to install other software will cause the system to crash.
    ALEOS was developed entirely in the United States in five steps:

1. Research: A list of ideas and potential features of the product 
is compiled, product roadmap is developed, and product requirements 
are defined.
2. Development of Software Specification: The chief architects 
create a software design, which is developed by the development team 
to meet the defined product requirements.
3. Programming of Source Code: The development team receives the 
software development tasks, which results in the source code files 
written by the software developers.
4. Software Integration and Build: The team integrates the source 
code files by compiling the source code into a binary file that runs 
on the hardware. During this phase, the developers work out the 
incompatibilities or bugs by rewriting or correcting source code as 
needed until a build is complete and ready for testing.
5. Testing and Validation: The software package is tested based on 
functional specifications defined in the product requirements. Once 
the test case pass rate is met, the software is ready for release.

    Since 1993, approximately [3] engineer hours were spent in the 
development of the ALEOS software in the United States. Some minor 
software maintenance, such as repair and validation, is conducted in 
Canada and France, which accounts for approximately [ ]% of the 
engineer hours spent. Sierra states that the gateways are 
approximately $45 at import and after the ALEOS software is 
installed, are valued at between $479 and $899. We assume for 
purposes of this decision that the figures provided are correct. You 
also submitted an affidavit from the Vice President of Marketing at 
Sierra describing the software and installation process, a user 
guide, an end-user warranty, and a PowerPoint presentation that 
included photographs and component lists.

LAW AND ANALYSIS:

    CBP issues country of origin advisory rulings and final 
determinations as to whether an article is or would be a product of 
a designated country or instrumentality for the purposes of granting 
waivers of certain ``Buy American'' restrictions in U.S. law or 
practice for products offered for sale to the U.S. Government, 
pursuant to subpart B of Part 177, 19 C.F.R. Sec.  177.21 et seq., 
which implements Title III of the Trade Agreements Act of 1979, as 
amended (19 U.S.C. Sec.  2511 et seq.).
    Under the rule of origin set forth under 19 U.S.C. Sec.  
2518(4)(B):

An article is a product of a country or instrumentality only if (i) 
it is wholly the growth, product, or manufacture of that country or 
instrumentality, or (ii) in the case of an article which consists in 
whole or in part of materials from another country or 
instrumentality, it has been substantially transformed into a new 
and different article of commerce with a name, character, or use 
distinct from that of the article or articles from which it was so 
transformed.

See also 19 C.F.R. Sec.  177.22(a).
    You argue that the country of origin of the GX400, GX440, LS300, 
and ES440 gateway products is the United States because you believe 
that the last substantial transformation occurs in the United 
States. You state that the fully-assembled gateways are not 
functional when they are imported into the United States and that 
the gateways gain their ability to function as intended only after 
U.S.-origin software is installed in the United States. In support, 
you cite, among others, Data General v. United States, 4 C.I.T. 182 
(1982), Headquarters Ruling (``HQ'') H052325, dated February 14, 
2006, and HQ H175415, dated October 4, 2011.
    In Data General, the court determined that the programming of a 
foreign PROM (Programmable Read-Only Memory chip) in the United 
States substantially transformed the PROM into a U.S. article. In 
the United States, the programming bestowed upon each circuit its 
electronic function, that is, its ``memory'' which could be 
retrieved. A distinct physical change was effected in the PROM by 
the opening or closing of the fuses, depending on the method of 
programming. The essence of the article, its interconnections or 
stored memory, was established by programming. The court concluded 
that altering the non-functioning circuitry comprising a PROM 
through technological expertise in order to produce a functioning 
read only memory device, possessing a desired distinctive circuit 
pattern, was no less a ``substantial transformation'' than the 
manual interconnection of transistors, resistors and diodes upon a 
circuit board creating a similar pattern. See also Texas Instruments 
v. United States, 681 F.2d 778, 782 (CCPA 1982) (holding that the 
substantial transformation issue is a ``mixed question of technology 
and customs law''). Accordingly, the programming of a device that 
confers its identity as well as defines its use generally 
constitutes a substantial transformation. See HQ 735027, dated 
September 7, 1993 (programming blank media (EEPROM) with 
instructions that allow it to perform certain functions that prevent 
piracy of software constitutes a substantial transformation; and HQ 
733085, dated July 13, 1990.
    CBP has also focused on where the programming took place. For 
example, in HQ H258960, dated May 19, 2016, CBP considered the 
country of origin of network transceivers in two different 
scenarios. In Scenario One, the importer purchased ``blank'' 
transceivers from Asia. The transceivers were then loaded with U.S.-
developed software in the United States, which made the transceivers 
functional. In Scenario Two, the importer purchased the transceivers 
with a generic program preinstalled, which was then removed so that 
the U.S.-developed software could be installed. We held that, in 
Scenario One, because the transceivers could not function as network 
devices without the U.S.-developed software, the transceivers were 
substantially transformed as a result of the downloading of the 
U.S.-developed software performed in the United States. However, in 
Scenario Two, because the transceivers were already functional when 
imported, the identity of the transceivers was not changed by the 
downloading performed in the United States, and no substantial 
transformation occurred.
    Similarly, in HQ H175415 dated October 4, 2011, CBP held that 
imported Ethernet switches underwent a substantial transformation 
after U.S.-origin software was downloaded onto the devices' flash 
memory in the United States, which allowed the devices to function. 
In China, the printed circuit board assemblies, chassis, top cover, 
power supply, and fan were assembled. Then, in the United States, 
U.S.-origin software, which gave the hardware the capability of 
functioning as local area network devices, was loaded onto the 
hardware. CBP noted that the U.S.-origin software ``enables the 
imported switches to interact with other network switches'' and that 
``[w]ithout this software, the imported devices could not function 
as Ethernet switches.'' Under these circumstances, CBP held that the 
country of origin of the local area network devices was the United 
States. See also HQ H052325, dated March 31, 2009 (holding that 
imported network devices underwent a substantial transformation in 
the United States after U.S.-origin software was download onto the 
devices in the United States, which gave the devices their 
functionality); and HQ H034843, dated May 5, 2009 (holding that 
Chinese USB flash drives underwent a substantial transformation in 
Israel when Israeli-origin software was loaded onto the devices, 
which made the devices functional).
    In each case, the nature of the article and the effect of the 
processing performed must be evaluated. Here, like the network 
devices and Ethernet switches at issue in HQ H175415, HQ H052325, 
and HQ H258960 (under Scenario One), the Sierra GX400, GX440, LS300, 
and ES440 gateways are imported into the United States in a non-
functional state. It is only after the installation of U.S.-origin 
software that the devices can function as intended. Moreover, as in 
HQ H175415, HQ H052325, and HQ H258960, the gateway products at 
issue here derive their core functionality as communication devices 
from the installation of the U.S.-developed software. We note that 
this case is distinguishable from Scenario 2 in HQ H258960, as 
Sierra's products do not contain pre-installed software when they 
are imported from China, and they are non-functional at the time of 
importation to the United States. Therefore, we find that the 
country of origin of the Sierra GX400, GX440, LS300, and ES440 
gateways is the United States.

HOLDING:

    Based on the facts provided, the country of origin of the 
gateways is the United States for purposes of U.S. Government 
procurement.
    Notice of this final determination will be given in the Federal 
Register, as required by 19 C.F.R. Sec.  177.29. Any party-at-
interest other than the party which requested this final 
determination may request, pursuant to 19 C.F.R. Sec.  177.31, that 
CBP reexamine the matter anew and issue a new final

[[Page 9015]]

determination. Pursuant to 19 C.F.R. Sec.  177.30, any party-at-
interest may, within 30 days of publication of the Federal Register 
Notice referenced above, seek judicial review of this final 
determination before the Court of International Trade.

Sincerely,

Alice A. Kipel, Executive Director Regulations & Rulings Office of 
Trade

[FR Doc. 2018-04278 Filed 3-1-18; 8:45 am]
 BILLING CODE P



                                                                               Federal Register / Vol. 83, No. 42 / Friday, March 2, 2018 / Notices                                                     9013

                                               amount of reimbursement is made by                      concerning the country of origin of                   within the meaning of 19 C.F.R.
                                               the OSLTF to the state. If the                          certain ethernet gateway products                     § 177.22(d)(1) and is entitled to request this
                                               information is not collected, the Coast                 known as AirLink gateways, which may                  final determination.
                                                                                                                                                                Per your letter dated September 22, 2014,
                                               Guard and the National Pollution Funds                  be offered to the U.S. Government under
                                                                                                                                                             we have reviewed your request for
                                               Center will be unable to justify the                    an undesignated government                            confidentiality pursuant to 19 C.F.R.
                                               resulting expenditures, and thus be                     procurement contract. This final                      § 177.2(b)(7) with respect to the information
                                               unable to recover costs from the parties                determination, HQ H250154, was issued                 submitted. As that information constitutes
                                               responsible for the spill when they can                 under procedures set forth at 19 CFR                  privileged or confidential matters, it has been
                                               be identified.                                          part 177, subpart B, which implements                 bracketed and will be deleted from any
                                                 Forms: None.                                          Title III of the Trade Agreements Act of              published versions.
                                                 Respondents: Governor of a state or                   1979, as amended (19 U.S.C. 2511–18).                 FACTS:
                                               their designated representative.                        In the final determination, CBP
                                                                                                                                                                Sierra produces gateways that provide
                                                 Frequency: On occasion.                               concluded that, based upon the facts                  secure internet connectivity for mobile
                                                 Hour Burden Estimate: The estimated                   presented, the programming and                        stations allowing a variety of enterprises,
                                               annual burden remains 03 hours a year.                  downloading operations performed in                   mainly law enforcement, to monitor their
                                                 Authority: The Paperwork Reduction Act                the United States, using U.S.-origin                  infrastructure and instruments by
                                               of 1995; 44 U.S.C. Chapter 35, as amended.              software, substantially transform non-                transmitting and receiving data from a central
                                                                                                       TAA country AirLink gateways.                         location. The gateways are designed for
                                                 Dated: February 26, 2018.                                                                                   entities that require 24/7 unmanned
                                                                                                       Therefore, the country of origin of the
                                               James D. Roppel,                                        AirLink gateways is the United States                 operation of remote assets and broadband
                                               U.S. Coast Guard, Acting Chief, Office of                                                                     connectivity. The gateways are frequently
                                                                                                       for purposes of U.S. Government                       installed in police cars and provide a 24/7
                                               Information Management.                                 procurement.
                                               [FR Doc. 2018–04271 Filed 3–1–18; 8:45 am]
                                                                                                                                                             internet connection and allow police officers
                                                                                                          Section 177.29, CBP Regulations (19                to access information stored in the central
                                               BILLING CODE 9110–04–P                                  CFR 177.29), provides that a notice of                location. The gateway also acts as a firewall
                                                                                                       final determination shall be published                server, which ensures that the connection
                                                                                                       in the Federal Register within 60 days                between the mobile station and the main
                                               DEPARTMENT OF HOMELAND                                  of the date the final determination is                office is secure and that unauthorized
                                               SECURITY                                                issued. Section 177.30, CBP Regulations               persons cannot access information
                                                                                                       (19 CFR 177.30), provides that any                    transmitted over the internet. Sierra’s
                                               U.S. Customs and Border Protection                                                                            submissions include details on four different
                                                                                                       party-at-interest, as defined in 19 CFR               gateway products, branded ‘‘AirLink,’’ to be
                                               Notice of Issuance of Final                             177.22(d), may seek judicial review of a              covered by this final determination: GX400,
                                               Determination Concerning Certain                        final determination within 30 days of                 GX440, LS300, and ES440. The different
                                               Ethernet Gateway Products                               publication of such determination in the              series of gateways are designed differently to
                                                                                                       Federal Register.                                     meet the needs of a variety of customers1, but
                                               AGENCY:  U.S. Customs and Border                          Dated: February 23, 2018.                           they have the same functions and operate
                                               Protection, Department of Homeland                                                                            with the same software, referred to as Aleos.
                                                                                                       Alice A. Kipel,                                          The hardware components consist of a
                                               Security.
                                                                                                       Executive Director, Regulations and Rulings,          case/kit that holds the module, a printed
                                               ACTION: Notice of final determination.                  Office of Trade.                                      circuit assembly (‘‘PCA’’) that includes a
                                               SUMMARY:   This document provides                       HQ H250154                                            radio module, a decorative cover placed over
                                                                                                                                                             the case/kit, and various nuts and screws to
                                               notice that U.S. Customs and Border                     February 23, 2018                                     close the case/kit and hold the cover in place.
                                               Protection (‘‘CBP’’) has issued a final                                                                       All the hardware components are designed in
                                                                                                       OT:RR:CTF:VS H250154 GaK/RMC
                                               determination concerning the country of                                                                       the United States and produced and
                                               origin of certain ethernet gateway                      CATEGORY: Origin                                      assembled in China. Sierra imports the
                                               products known as AirLink gateways.                     Mark J. Segrist                                       completed gateways into the United States,
                                               Based upon the facts presented, CBP has                 Sandler, Travis & Rosenberg, P.A.                     where authorized retailers install the ALEOS
                                               concluded in the final determination                    225 West Washington Street, Suite 1640                software. Sierra states that, at the time of
                                               that the United States is the country of                Chicago, IL 60606                                     importation, the fully assembled gateway is
                                               origin of the AirLink gateways for                                                                            not functional because it does not contain the
                                                                                                       Re: U.S. Government Procurement; Country              ALEOS software. Sierra also states that the
                                               purposes of U.S. Government                             of Origin of Gateway Products; Substantial            gateway in its condition as imported has only
                                               procurement.                                            Transformation                                        the basic ability to communicate with a
                                               DATES:  The final determination was                     Dear Mr. Segrist:                                     software installation tool to facilitate the
                                               issued on February 23, 2018. A copy of                                                                        download of the ALEOS software. The radio
                                                                                                          This is in response to your letter dated           module contains firmware to control its
                                               the final determination is attached. Any                October 25, 2013, and your supplemental               internal function of sending and receiving to/
                                               party-at-interest, as defined in 19 CFR                 submissions dated February 27, 2014 and               from the network, which cannot take place
                                               § 177.22(d), may seek judicial review of                March 21, 2014, requesting a final                    until the ALEOS software is loaded onto the
                                               this final determination within April 2,                determination on behalf of your client, Sierra        gateway. Sierra states that the PCA design
                                               2018.                                                   Wireless (‘‘Sierra’’), pursuant to subpart B of
                                                                                                                                                             and the firmware in the radio module are
                                                                                                       Part 177 of the U.S. Customs and Border
                                               FOR FURTHER INFORMATION CONTACT: Ross                                                                         proprietary and are designed to work only
                                                                                                       Protection (‘‘CBP’’) Regulations (19 C.F.R.
                                               M. Cunningham, Valuation and Special                                                                          with the ALEOS software and that any
                                                                                                       Part 177). A meeting was held at our office
                                               Programs Branch, Regulations and                        on October 3, 2014, where you and your
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                                                                               1 The GX series are designed for in-vehicle field
                                               Rulings, Office of Trade (202) 325–0034.                client explained the software development
                                                                                                       process and the product. A further                    deployments, such as connecting police cars or fire
                                               SUPPLEMENTARY INFORMATION: Notice is                                                                          trucks to their network at headquarters. The LS
                                               hereby given that on February 23, 2018,                 submission dated April 18, 2017, was                  series is designed for hazardous environments and
                                                                                                       provided.                                             for industrial deployments, such as surveillance of
                                               pursuant to subpart B of Part 177, U.S.                    This final determination concerns the              pipelines or meters. The ES series is designed to
                                               Customs and Border Protection                           country of origin of Sierra’s secure Ethernet         provide connectivity when landline connections are
                                               Regulations (19 CFR part 177, subpart                   gateway products (‘‘gateways’’). We note that         unavailable and can be used to maintain kiosks and
                                               B), CBP issued a final determination                    as a U.S. importer, Sierra is a party-at-interest     retail operations online.



                                          VerDate Sep<11>2014   18:10 Mar 01, 2018   Jkt 244001   PO 00000   Frm 00051   Fmt 4703   Sfmt 4703   E:\FR\FM\02MRN1.SGM   02MRN1


                                               9014                            Federal Register / Vol. 83, No. 42 / Friday, March 2, 2018 / Notices

                                               attempts to install other software will cause           distinct from that of the article or articles         Scenario Two, because the transceivers were
                                               the system to crash.                                    from which it was so transformed.                     already functional when imported, the
                                                  ALEOS was developed entirely in the                  See also 19 C.F.R. § 177.22(a).                       identity of the transceivers was not changed
                                               United States in five steps:                               You argue that the country of origin of the        by the downloading performed in the United
                                               1. Research: A list of ideas and potential              GX400, GX440, LS300, and ES440 gateway                States, and no substantial transformation
                                                    features of the product is compiled,               products is the United States because you             occurred.
                                                    product roadmap is developed, and                  believe that the last substantial                        Similarly, in HQ H175415 dated October 4,
                                                    product requirements are defined.                  transformation occurs in the United States.           2011, CBP held that imported Ethernet
                                               2. Development of Software Specification:               You state that the fully-assembled gateways           switches underwent a substantial
                                                                                                       are not functional when they are imported             transformation after U.S.-origin software was
                                                    The chief architects create a software
                                                                                                       into the United States and that the gateways          downloaded onto the devices’ flash memory
                                                    design, which is developed by the
                                                                                                       gain their ability to function as intended only       in the United States, which allowed the
                                                    development team to meet the defined
                                                                                                       after U.S.-origin software is installed in the        devices to function. In China, the printed
                                                    product requirements.
                                                                                                       United States. In support, you cite, among            circuit board assemblies, chassis, top cover,
                                               3. Programming of Source Code: The
                                                                                                       others, Data General v. United States, 4 C.I.T.       power supply, and fan were assembled.
                                                    development team receives the software
                                                                                                       182 (1982), Headquarters Ruling (‘‘HQ’’)              Then, in the United States, U.S.-origin
                                                    development tasks, which results in the
                                                                                                       H052325, dated February 14, 2006, and HQ              software, which gave the hardware the
                                                    source code files written by the software
                                                                                                       H175415, dated October 4, 2011.                       capability of functioning as local area
                                                    developers.
                                                                                                          In Data General, the court determined that         network devices, was loaded onto the
                                               4. Software Integration and Build: The team                                                                   hardware. CBP noted that the U.S.-origin
                                                    integrates the source code files by                the programming of a foreign PROM
                                                                                                       (Programmable Read-Only Memory chip) in               software ‘‘enables the imported switches to
                                                    compiling the source code into a binary                                                                  interact with other network switches’’ and
                                                                                                       the United States substantially transformed
                                                    file that runs on the hardware. During                                                                   that ‘‘[w]ithout this software, the imported
                                                                                                       the PROM into a U.S. article. In the United
                                                    this phase, the developers work out the                                                                  devices could not function as Ethernet
                                                                                                       States, the programming bestowed upon each
                                                    incompatibilities or bugs by rewriting or                                                                switches.’’ Under these circumstances, CBP
                                                                                                       circuit its electronic function, that is, its
                                                    correcting source code as needed until a                                                                 held that the country of origin of the local
                                                                                                       ‘‘memory’’ which could be retrieved. A
                                                    build is complete and ready for testing.                                                                 area network devices was the United States.
                                                                                                       distinct physical change was effected in the
                                               5. Testing and Validation: The software                                                                       See also HQ H052325, dated March 31, 2009
                                                                                                       PROM by the opening or closing of the fuses,
                                                    package is tested based on functional                                                                    (holding that imported network devices
                                                                                                       depending on the method of programming.
                                                    specifications defined in the product              The essence of the article, its                       underwent a substantial transformation in
                                                    requirements. Once the test case pass              interconnections or stored memory, was                the United States after U.S.-origin software
                                                    rate is met, the software is ready for             established by programming. The court                 was download onto the devices in the United
                                                    release.                                           concluded that altering the non-functioning           States, which gave the devices their
                                                  Since 1993, approximately [3] engineer               circuitry comprising a PROM through                   functionality); and HQ H034843, dated May
                                               hours were spent in the development of the              technological expertise in order to produce a         5, 2009 (holding that Chinese USB flash
                                               ALEOS software in the United States. Some               functioning read only memory device,                  drives underwent a substantial
                                               minor software maintenance, such as repair              possessing a desired distinctive circuit              transformation in Israel when Israeli-origin
                                               and validation, is conducted in Canada and              pattern, was no less a ‘‘substantial                  software was loaded onto the devices, which
                                               France, which accounts for approximately [              transformation’’ than the manual                      made the devices functional).
                                               ]% of the engineer hours spent. Sierra states           interconnection of transistors, resistors and            In each case, the nature of the article and
                                               that the gateways are approximately $45 at              diodes upon a circuit board creating a similar        the effect of the processing performed must
                                               import and after the ALEOS software is                  pattern. See also Texas Instruments v. United         be evaluated. Here, like the network devices
                                               installed, are valued at between $479 and               States, 681 F.2d 778, 782 (CCPA 1982)                 and Ethernet switches at issue in HQ
                                               $899. We assume for purposes of this                    (holding that the substantial transformation          H175415, HQ H052325, and HQ H258960
                                               decision that the figures provided are correct.         issue is a ‘‘mixed question of technology and         (under Scenario One), the Sierra GX400,
                                               You also submitted an affidavit from the Vice           customs law’’). Accordingly, the                      GX440, LS300, and ES440 gateways are
                                               President of Marketing at Sierra describing             programming of a device that confers its              imported into the United States in a non-
                                               the software and installation process, a user           identity as well as defines its use generally         functional state. It is only after the
                                               guide, an end-user warranty, and a                      constitutes a substantial transformation. See         installation of U.S.-origin software that the
                                               PowerPoint presentation that included                   HQ 735027, dated September 7, 1993                    devices can function as intended. Moreover,
                                               photographs and component lists.                        (programming blank media (EEPROM) with                as in HQ H175415, HQ H052325, and HQ
                                                                                                       instructions that allow it to perform certain         H258960, the gateway products at issue here
                                               LAW AND ANALYSIS:
                                                                                                       functions that prevent piracy of software             derive their core functionality as
                                                  CBP issues country of origin advisory                constitutes a substantial transformation; and         communication devices from the installation
                                               rulings and final determinations as to                  HQ 733085, dated July 13, 1990.                       of the U.S.-developed software. We note that
                                               whether an article is or would be a product                CBP has also focused on where the                  this case is distinguishable from Scenario 2
                                               of a designated country or instrumentality for          programming took place. For example, in HQ            in HQ H258960, as Sierra’s products do not
                                               the purposes of granting waivers of certain             H258960, dated May 19, 2016, CBP                      contain pre-installed software when they are
                                               ‘‘Buy American’’ restrictions in U.S. law or            considered the country of origin of network           imported from China, and they are non-
                                               practice for products offered for sale to the           transceivers in two different scenarios. In           functional at the time of importation to the
                                               U.S. Government, pursuant to subpart B of               Scenario One, the importer purchased                  United States. Therefore, we find that the
                                               Part 177, 19 C.F.R. § 177.21 et seq., which             ‘‘blank’’ transceivers from Asia. The                 country of origin of the Sierra GX400, GX440,
                                               implements Title III of the Trade Agreements            transceivers were then loaded with U.S.-              LS300, and ES440 gateways is the United
                                               Act of 1979, as amended (19 U.S.C. § 2511 et            developed software in the United States,              States.
                                               seq.).                                                  which made the transceivers functional. In
                                                  Under the rule of origin set forth under 19          Scenario Two, the importer purchased the              HOLDING:
                                               U.S.C. § 2518(4)(B):                                    transceivers with a generic program                     Based on the facts provided, the country of
                                               An article is a product of a country or                 preinstalled, which was then removed so that          origin of the gateways is the United States for
daltland on DSKBBV9HB2PROD with NOTICES




                                               instrumentality only if (i) it is wholly the            the U.S.-developed software could be                  purposes of U.S. Government procurement.
                                               growth, product, or manufacture of that                 installed. We held that, in Scenario One,               Notice of this final determination will be
                                               country or instrumentality, or (ii) in the case         because the transceivers could not function           given in the Federal Register, as required by
                                               of an article which consists in whole or in             as network devices without the U.S.-                  19 C.F.R. § 177.29. Any party-at-interest other
                                               part of materials from another country or               developed software, the transceivers were             than the party which requested this final
                                               instrumentality, it has been substantially              substantially transformed as a result of the          determination may request, pursuant to 19
                                               transformed into a new and different article            downloading of the U.S.-developed software            C.F.R. § 177.31, that CBP reexamine the
                                               of commerce with a name, character, or use              performed in the United States. However, in           matter anew and issue a new final



                                          VerDate Sep<11>2014   18:10 Mar 01, 2018   Jkt 244001   PO 00000   Frm 00052   Fmt 4703   Sfmt 4703   E:\FR\FM\02MRN1.SGM   02MRN1


                                                                               Federal Register / Vol. 83, No. 42 / Friday, March 2, 2018 / Notices                                                    9015

                                               determination. Pursuant to 19 C.F.R.                    parts constitutes a substantial                       then transferred to a specialized processing
                                               § 177.30, any party-at-interest may, within 30          transformation. In the final                          factory in Italy that cuts the sheet to the final
                                               days of publication of the Federal Register             determination, CBP concluded that                     dimensions, and bends three of the side
                                               Notice referenced above, seek judicial review                                                                 edges to create the casing that will house the
                                               of this final determination before the Court
                                                                                                       these activities do not constitute a
                                                                                                                                                             honeycomb core. Along one side of the
                                               of International Trade.                                 substantial transformation and the
                                                                                                                                                             casing, the edge is left flat and two bending
                                                                                                       origin of the honeycomb panels remains                lines are engraved on the back of this edge
                                               Sincerely,
                                                                                                       the original country of manufacturing.                for reference during the production process
                                               Alice A. Kipel, Executive Director                         Section 177.29, CBP Regulations (19                in the United States. The casing will then be
                                               Regulations & Rulings                                   C.F.R. § 177.29), provides that notice of             transported to a U.S. production facility to
                                               Office of Trade                                         final determinations shall be published               receive and secure the core. Workers at the
                                               [FR Doc. 2018–04278 Filed 3–1–18; 8:45 am]              in the Federal Register within 60 days                U.S. production facility will also drill holes
                                               BILLING CODE P
                                                                                                       of the date the final determination is                at prescribed locations to attach the core.
                                                                                                       issued. Section 177.30, CBP Regulations               The core
                                                                                                       (19 C.F.R. § 177.30), provides that any
                                                                                                       party-at-interest, as defined in 19 C.F.R.               The core consists of two hard layers called
                                               DEPARTMENT OF HOMELAND
                                                                                                                                                             skins and a layer of aluminum honeycomb
                                               SECURITY                                                § 177.22(d), may seek judicial review of
                                                                                                                                                             made up of 3000 series aluminum alloy with
                                                                                                       a final determination within 30 days of               hexagonal cells that are 80 microns thick.
                                               U.S. Customs and Border Protection                      publication of such determination in the              The skins can either be coated with five
                                                                                                       Federal Register.                                     microns of primer or pre-painted black with
                                               Notice of Issuance of Final
                                                                                                         Dated: February 21, 2018.                           an anti-graffiti finish. The skins are glued to
                                               Determination Concerning Country of                                                                           the honeycomb panel to create a singular
                                               Origin of Aluminum Honeycomb                            Alice A. Kipel,
                                                                                                                                                             panel referred to as the core.
                                               Panels                                                  Executive Director, Regulations and Rulings,
                                                                                                                                                                The Italian manufacturer will supply and
                                                                                                       Office of Trade.
                                               AGENCY:  U.S. Customs and Border                                                                              transport the core sheets in bulk to a U.S.
                                               Protection, Department of Homeland                      HQ H290528                                            manufacturing facility. Each core sheet will
                                                                                                                                                             produce three to 16 cores. All cores for the
                                               Security.                                               February 21, 201                                      curved panels will be cut-to-size to fit the
                                               ACTION: Notice of final determination.                                                                        casing in Italy but cores for the straight
                                                                                                       OT:RR:CTF:VS: H290528 JMV
                                                                                                                                                             panels will be cut to size at the U.S. facility.
                                               SUMMARY:    This document provides                      CATEGORY: Origin                                      Eight holes are drilled through the back of
                                               notice that U.S. Customs and Border                                                                           the core for attachment of the mounting
                                               Protection (‘‘CBP’’) has issued a final                 Darlene Buro
                                                                                                       All Air Custom Brokers, Inc.                          blades. However, all the cores for curved
                                               determination concerning the country of                 145–68 228th Street, 2nd Floor                        panels will be cut and drilled in Italy.
                                               origin of aluminum honeycomb panels.                    Springfield Gardens, NY11413
                                               CBP has concluded in the final                                                                                The mounting blades
                                                                                                          RE: U.S. Government Procurement; Title
                                               determination that for purposes of U.S.                                                                         The mounting blades are aluminum alloy
                                                                                                       III, Trade Agreements Act of 1979 (19 U.S.C.
                                               Government procurement the assembly                                                                           sheets of unknown origin extruded into L-
                                                                                                       § 2511); Subpart B, Part 177, CBP
                                               of the parts in the United States does                                                                        shaped brackets. Two mounting blades will
                                                                                                       Regulations; Country of Origin of Honeycomb
                                               not substantially transform the                                                                               be attached to the back of each core on either
                                                                                                       Panels
                                                                                                                                                             side. The mounting blades are extruded,
                                               aluminum panels.                                        Dear Ms. Buro,                                        machined, bent, and cut-to-size in the United
                                               DATES: The final determination was                         This is in response to your request of June        States before being secured to the core. Two
                                               issued on February 21, 2018. A copy of                  5, 2017, on behalf of Aliva Chemica E Sistemi         different profiles are produced for the right
                                               the final determination is attached. Any                SRL (‘‘Aliva’’) for a final determination             and left blades, which hook the finished
                                               party-at-interest, as defined in 19 C.F.R.              concerning the country of origin of a product
                                                                                                                                                             panel onto Aliva’s framing system.
                                                                                                       that you refer to as ‘‘aluminum honeycomb
                                               § 177.22(d), may seek judicial review of                panels,’’ pursuant to subpart B of Part 177,          Assembly
                                               this final determination within April 2,                U.S. Customs and Border Protection (CBP)
                                               2018.                                                                                                            In the United States, the core is inserted
                                                                                                       Regulations (19 C.F.R. § 177.21, et seq.).            into the case and then the flat edge of each
                                               FOR FURTHER INFORMATION CONTACT: Joy                       As a foreign producer of merchandise,              casing will be bent into place with
                                               Marie Virga, Valuation and Special                      Aliva is a party-at-interest within the
                                                                                                                                                             specialized aluminum bending equipment.
                                               Programs Branch, Regulations and                        meaning of 19 C.F.R. § 177.22(d)(1) and is
                                                                                                                                                             An average of 16 holes will be drilled into
                                               Rulings, Office of Trade (202–325–                      entitled to request this final determination.
                                                                                                                                                             each panel, and 16 stainless steel rivets will
                                               1511).                                                  FACTS:                                                be fastened with a specialized riveting tool to
                                               SUPPLEMENTARY INFORMATION: Notice is                      The merchandise at issue are Aliva                  secure the core and casing together. Finally,
                                                                                                       aluminum honeycomb panels, which will be              each mounting blade is secured to the
                                               hereby given that on 02/21/18, CBP                                                                            finished panel with four stainless steel rivets.
                                               issued a final determination concerning                 used as architectural finished coating panels
                                                                                                       for wall and tunnel areas in train stations.             According to Aliva, the processing in the
                                               the aluminum honeycomb panels,                                                                                United States requires skilled labor and
                                                                                                       The panels come in two variations: straight
                                               which may be offered to the United                      and curved. Each installed panel will contain         increases the value of the component parts.
                                               States Government under an                              a casing, a core, and two mounting blades.            Aliva estimates that the work required to
                                               undesignated government procurement                                                                           incorporate the casing, core and mounting
                                               contract. The final determination, HQ                   The casing                                            blades into a singular panel in the United
                                               H290528, was issued at the request of                     The casing is a flat sheet of pre-painted           States will take approximately 46 minutes of
                                               Aliva Chemica E Sistemi SRL, under                      aluminum alloy which will be supplied in              labor. The importer further states that the
daltland on DSKBBV9HB2PROD with NOTICES




                                               procedures set forth at 19 C.F.R. Part                  both perforated and non-perforated variations         processes performed in the United States to
                                                                                                       as required for aesthetic appearance. The flat        produce all of the panels will require
                                               177, subpart B, which implements Title                                                                        ‘‘hundreds of thousands of dollars of labor.’’
                                                                                                       sheet is produced in Italy in dimensions of
                                               III of the Trade Agreements Act of 1979,                two feet in width and variable lengths. These         Aliva indicates that each panel will have a
                                               as amended (19 U.S.C. § 2511–18). In                    aluminum alloy sheets are painted through a           significantly increased value over the
                                               the final determination, CBP was asked                  reverse coil process and will include anti-           collective value of the individual parts
                                               to consider whether the cutting,                        graffiti characteristics as required by the           (casing, core, and mounting blades) after the
                                               bending, and assembly of aluminum                       architectural specification. The sheets are           processing in the United States is completed.



                                          VerDate Sep<11>2014   18:10 Mar 01, 2018   Jkt 244001   PO 00000   Frm 00053   Fmt 4703   Sfmt 4703   E:\FR\FM\02MRN1.SGM   02MRN1



Document Created: 2018-03-01 23:56:24
Document Modified: 2018-03-01 23:56:24
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of final determination.
DatesThe final determination was issued on February 23, 2018. A copy of the final determination is attached. Any party-at-interest, as defined in 19 CFR Sec. 177.22(d), may seek judicial review of this final determination within April 2, 2018.
ContactRoss M. Cunningham, Valuation and Special Programs Branch, Regulations and Rulings, Office of Trade (202) 325-0034.
FR Citation83 FR 9013 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR