Air Plan Approval; Nebraska; Infrastructure SIP Requirements for the 2015 Ozone National Ambient Air Quality Standards (NAAQS)
The Environmental Protection Agency (EPA) is proposing to approve elements of a State Implementation Plan (SIP) submission from the State of Nebraska addressing the applicable r...
The Environmental Protection Agency (EPA) is proposing to approve elements of a State Implementation Plan (SIP) submission from the State of Nebraska addressing the applicable requirements of the Clean Air Act (CAA) section 110 for the 2015 Ozone (O3) National Ambient Air Quality Standards (NAAQS). Section 110 requires that each state adopt and submit a SIP to support the implementation, maintenance, and enforcement of each new or revised NAAQS promulgated by EPA. These SIPs are commonly referred to as “infrastructure” SIPs. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA.
DATES:
Comments must be received on or before June 10, 2019.
ADDRESSES:
You may send comments, identified by Docket ID No. EPA-R07-OAR-2019-0083 to
https://www.regulations.gov.
Follow the online instructions for submitting comments.
Instructions:
All submissions received must include the Docket ID No. for this rulemaking. Comments received will be posted without change to
https://www.regulations.gov/,
including any personal information provided. For detailed instructions on sending comments and additional information on the rulemaking process, see the “Written Comments” heading of the
SUPPLEMENTARY INFORMATION
section of this document.
FOR FURTHER INFORMATION CONTACT:
Mr. Gregory Crable Environmental Protection Agency, Air Planning and Development Branch, 11201 Renner Boulevard, Lenexa, Kansas 66219; telephone number (913) 551-7391; email address
crable.gregory@epa.gov.
SUPPLEMENTARY INFORMATION:
Throughout this document “we,” “us,” and “our” refer to the EPA. A technical support document (TSD) is included in this proposed rulemaking docket.
Table of Contents
I. Written Comments
II. What is being addressed in this document?
III. Have the requirements for approval of a SIP revision been met?
IV. What action is EPA taking?
V. Statutory and Executive Order Reviews
I. Written Comments
Submit your comments, identified by Docket ID No. EPA-R07-OAR-2019-0083, at
https://www.regulations.gov.
Once submitted, comments cannot be edited or removed from
Regulations.gov.
The EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Multimedia submissions (audio, video, etc.) must be accompanied by a written comment. The written comment is considered the official comment and should include discussion of all points you wish to make. The EPA will generally not consider comments or comment contents located outside of the primary submission (
i.e.,
on the web, cloud, or other file sharing system). For additional submission methods, the full EPA public comment policy, information about CBI or multimedia submissions, and general guidance on making effective comments, please visit
https://www.epa.gov/dockets/commenting-epa-dockets.
II. What is being addressed in this document?
The EPA is proposing to approve the infrastructure SIP submission received from the State of Nebraska on September 24, 2018. Specifically, EPA is proposing to approve the following infrastructure elements of section 110(a)(2): (A) through (C), (D)(i)(I)—prongs 1 and 2, (D)(i)(II)—prong 3, (D)(ii), (E) through (H), and (J) through (M).
A Technical Support Document (TSD), is included as part of the docket to discuss the details of this proposed action, including an analysis of how the SIP meets the applicable 110(a)(1) and (2) requirements for infrastructure SIPs. As explained in the TSD, EPA plans to take separate action on the infrastructure elements under section 110(a)(2)(D)(i)(II)—prong 4. The EPA is not taking action on section 110(a)(2)(I)—Nonattainment Area Plan or Plan Revisions Under Part D.
III. Have the requirements for approval of a SIP revision been met?
The state submission has met the public notice requirements for SIP submissions in accordance with 40 CFR 51.102. The submission also satisfied the completeness criteria of 40 CFR part 51, appendix V. The state provided a public comment period for this SIP revision from August 7, 2018 to September 7, 2018, and at the same time, offered an opportunity for a public hearing. The state received no comments and no requests for a public hearing. The public hearing scheduled for September 11, 2018 was canceled. In addition, as explained in more detail in the TSD, the revision meets the substantive SIP requirements of the CAA, including section 110 and implementing regulations.
IV. What action is EPA taking?
The EPA is proposing to approve elements of the September 24, 2018, infrastructure SIP submission from the State of Nebraska, which address the requirements of CAA sections 110(a)(1) and (2) as applicable to the 2015 O3
NAAQS. Specifically, the EPA is proposing to approve the following infrastructure elements of 110(a)(2): (A) through (C), (D)(i)(I)—prongs 1 and 2, (D)(i)(II)—prong 3, (D)(ii), (E) through (H), and (J) through (M). As explained in the TSD, the EPA intends to act on section 110(a)(2)(D)(i)(II)—prong 4, in a
( printed page 20319)
subsequent rulemaking. The EPA is not taking action on section 110(a)(2)(I)—Nonattainment Area Plan or Plan Revisions under part D.
Based upon review of the state's infrastructure SIP submissions and relevant statutory and regulatory authorities and provisions referenced in those submissions or referenced in Nebraska's SIP, the EPA believes that Nebraska's SIP will meet all applicable required elements of sections 110(a)(1) and (2) (except as otherwise noted) with respect to the 2015 O3
NAAQS. We are processing this as a proposed action because we are soliciting comments on this proposed action. Final rulemaking will occur after consideration of any comments.
VI. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the CAA and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:
Is not a significant regulatory action subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501et seq.);
Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601et seq.);
Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
Is not subject to requirements of the National Technology Transfer and Advancement Act (NTTA) because this rulemaking does not involve technical standards; and
Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, underExecutive Order 12898 (59 FR 7629, February 16, 1994).
The SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications and will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).
(35) Sections 110(a)(1) and (2) Infrastructure Requirements for the 2015 O
3
NAAQS
Statewide
9/24/2018
[Date of publication of the final rule in the
Federal Register
], [
Federal Register
citation of the final rule]
This action approves for the O3
NAAQS: The following CAA elements: 110(a)(1) and (2): (A) Through (C),(D)(i)(I)—prongs 1 and 2, (D)(i)(II)—prong 3, (D)(ii), (E) through (H), and (J) through (M). EPA-R07-OAR-2019-0083; FRL-9992-72-Region 7.
Use this for formal legal and research references to the published document.
84 FR 20318
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Air Plan Approval; Nebraska; Infrastructure SIP Requirements for the 2015 Ozone National Ambient Air Quality Standards (NAAQS),” thefederalregister.org (May 9, 2019), https://thefederalregister.org/documents/2019-09492/air-plan-approval-nebraska-infrastructure-sip-requirements-for-the-2015-ozone-national-ambient-air-quality-standards-naa.