Notice of Final Agency Actions on Proposed Railroad Project in California on Behalf of the California High Speed Rail Authority
FRA, on behalf of the California High-Speed Rail Authority (Authority), is issuing this notice to announce actions taken by the Authority that are final. By this notice, FRA is ...
SUPPLEMENTARY INFORMATION:
Effective July 23, 2019, FRA assigned, and the State of California acting through the Authority assumed, environmental responsibilities for the California High-Speed Rail (HSR) System pursuant to 23 U.S.C. 327. Notice is given that the Authority has taken final agency actions subject to 23 U.S.C. 139(
l)(1); 49 U.S.C. 24201(a)(4) by issuing approvals for the Project. The purpose of the California HSR System []
is to provide a reliable, high-speed, electric-powered train system that links the major metropolitan areas of California, delivering predictable and consistent travel times. A further objective is to provide an interface with commercial airports, mass transit, and the highway network, and to relieve capacity constraints of the existing transportation system as increases in intercity travel demand in California occur, in a manner sensitive to and protective of California's unique natural resources. The Authority has selected Alternative 4, with the San Jose Diridon Station, a station in downtown Gilroy, the South Gilroy Maintenance-of-Way Facility and maintenance of way siding (MOWS) west of Turner Island Road in the Central Valley, as identified in the Final Environmental Impact Statement (Final EIS) and Record of Decision, for the San Jose to Merced Project because the Selected Alternative (1) best satisfies the Purpose, Need, and Objectives for the Project and (2) minimizes impacts on the natural and human environment by utilizing an existing transportation corridor where practicable and incorporating mitigation measures where practicable. The actions by the Authority, and the laws under which such actions were taken, are described in the Project's Final EIS and Record of Decision (ROD). The ROD was executed on June 1, 2022. The ROD, Final EIS, and other documents will be available online in PDF at the Authority's website (
www.hsr.ca.gov) and via electronic media by calling (916) 324-1541.
This notice applies to the ROD, Final EIS, and all other Federal agency decisions with respect to the Project as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to:
1. NEPA;
2. Council on Environmental Quality regulations (1978); []
3. Fixing America's Surface Transportation Act (FAST Act);
4. Department of Transportation Act of 1966, Section 4(f);
5. Land and Water Conservation Fund (LWCF) Act of 1965, Section 6(f);
6. Clean Air Act Amendments of 1990;
7. Clean Water Act of 1977 and 1987;
8. Endangered Species Act of 1973;
9. Migratory Bird Treaty Act;
10. National Historic Preservation Act of 1966, as amended;
11. Executive Order 11990, Protection of Wetlands;
12. Executive Order 11988, Floodplain Management;
13. Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations;
14. Executive Order 13112, Invasive Species.
Issued in Washington, DC.
Jamie P. Rennert,
Director, Office of Infrastructure Investment.