Document

Pipeline Safety: Standards Update-ASTM F1973

PHMSA is confirming the effective date for a DFR published in the Federal Register on April 24, 2026. The DFR amended PHMSA's regulations at 49 CFR part 192 to incorporate by re...

Department of Transportation
Pipeline and Hazardous Materials Safety Administration
  1. 49 CFR Part 192
  2. [Docket No. PHMSA-2026-1530]
  3. RIN 2137-AG34
( printed page 48304)

AGENCY:

Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT).

ACTION:

Direct final rule (DFR); confirmation of effective date.

SUMMARY:

PHMSA is confirming the effective date for a DFR published in the Federal Register on April 24, 2026. The DFR amended PHMSA's regulations at 49 CFR part 192 to incorporate by reference the updated industry standard ASTM F1973, Standard Specification for Factory Assembled Anodeless Risers and Transition Fittings in Polyethylene (PE) and Polyamide (PA11) and Polyamide 12 (PA12) Fuel Gas Distribution Systems.

DATES:

The effective date of the DFR is January 1, 2027.

FOR FURTHER INFORMATION CONTACT:

Brianna Wilson, Transportation Specialist, by phone at 771-215-0969 or by email at .

SUPPLEMENTARY INFORMATION:

On April 24, 2026, PHMSA published a DFR titled “Pipeline Safety: Standards Update—ASTM F1973” (91 FR 22018). The DFR amended regulations at 49 CFR part 192 to incorporate the 2025 edition of ASTM F1973, “Standard Specification for Factory Assembled Anodeless Risers and Transition Fittings in Polyethylene (PE) and Polyamide (PA11) and Polyamide 12 (PA12) Fuel Gas Distribution Systems” (ASTM F1973) by reference. Reference to the 2025 edition of ASTM F1973 will replace existing references within § 192.204(b) and Appendix B to Part 192 to ASTM F1973-21, Standard Specification for Factory Assembled Anodeless Risers and Transition Fittings in Polyethylene (PE) and Polyamide 11 (PA11) and Polyamide 12 (PA12) Fuel Gas Distribution Systems, November 1, 2021.

PHMSA issued the DFR under the procedures set forth at 49 CFR 190.339. In accordance with those procedures, PHMSA stated in the DFR that if no adverse comments were received, the DFR would become effective on January 1, 2027. PHMSA did not receive any comments that warranted withdrawal of the DFR; therefore, this rule will become effective as scheduled.

Issued in Washington, DC under authority delegated in 49 CFR 1.97.

Keith J. Coyle,

Chief Counsel.

[FR Doc. 2026-15570 Filed 7-30-26; 8:45 am]

BILLING CODE 4910-60-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

91 FR 48304

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Pipeline Safety: Standards Update-ASTM F1973,” thefederalregister.org (July 31, 2026), https://thefederalregister.org/documents/2026-15570/pipeline-safety-standards-update-astm-f1973.