PHMSA is confirming the effective date for a DFR published in the Federal Register on April 24, 2026. The DFR amended PHMSA's regulations at 49 CFR part 195 to incorporate by re...
Pipeline and Hazardous Materials Safety Administration
49 CFR Part 195
[Docket No. PHMSA-2026-1532]
RIN 2137-AG36
( printed page 48307)
AGENCY:
Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT).
ACTION:
Direct final rule (DFR); confirmation of effective date.
SUMMARY:
PHMSA is confirming the effective date for a DFR published in the
Federal Register
on April 24, 2026. The DFR amended PHMSA's regulations at 49 CFR part 195 to incorporate by reference the updated industry standard MSS SP-75, High-Strength, Wrought, Butt-Welding Fittings.
DATES:
The effective date of the DFR is January 1, 2027.
FOR FURTHER INFORMATION CONTACT:
Brianna Wilson, Transportation Specialist, by phone at 771-215-0969 or by email at
brianna.wilson@dot.gov.
SUPPLEMENTARY INFORMATION:
On April 24, 2026, PHMSA published a DFR titled “Pipeline Safety: Standards Update—MSS SP-75” (91 FR 22043). The DFR amended regulations at 49 CFR part 195 to incorporate the 2025 edition of MSS SP-75 High Strength, Wrought, Butt-Welding Fittings (MSS SP-75) by reference. Reference to the 2025 edition of MSS SP-75 will replace existing references within § 195.118(a) to MSS SP-75-2019 Standard Practice, High Strength, Wrought, Butt-Welding Fittings, published December 2019.
PHMSA issued the DFR under the procedures set forth at 49 CFR 190.339. In accordance with those procedures, PHMSA stated in the DFR that if no adverse comments were received, the DFR would become effective on January 1, 2027. PHMSA did not receive any comments that warranted withdrawal of the DFR; therefore, this rule will become effective as scheduled.
Issued in Washington, DC under authority delegated in 49 CFR 1.97.