DEPARTMENT OF DEFENSE
Department of the Army, U.S. Army Corps of Engineers

Federal Register Volume 80, Issue 72 (April 15, 2015)

Page Range20202-20203
FR Document2015-08723

The purpose of this notice is to initiate the scoping process for an evaluation of whether there is adequate capacity at existing placement sites for placement/disposal of projected maintenance dredged material from Petaluma River. This evaluation will be conducted in a two-step process: First a preliminary assessment (PA) will make projections of the volume of dredged material, estimate the existing capacity for placement/disposal of the material, and verify that continued maintenance dredging is economically justified. If the PA concludes that continued maintenance dredging is justified and that the existing placement/disposal capacity is not adequate, then a Dredged Material Management Plan (DMMP) will be prepared to identify additional placement/disposal sites with adequate capacity for the next 20 years of federal and non-federal maintenance dredging.

Federal Register, Volume 80 Issue 72 (Wednesday, April 15, 2015)
[Federal Register Volume 80, Number 72 (Wednesday, April 15, 2015)]
[Notices]
[Pages 20202-20203]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-08723]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, U.S. Army Corps of Engineers


Notice To Conduct a Public Meeting for Preparation of a 
Preliminary Assessment and Dredged Material Management Plan for 
Petaluma River, City of Petaluma, Sonoma County, CA

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD.

ACTION: Public Notice.

-----------------------------------------------------------------------

SUMMARY: The purpose of this notice is to initiate the scoping process 
for an evaluation of whether there is adequate capacity at existing 
placement sites for placement/disposal of projected maintenance dredged 
material from Petaluma River. This evaluation will be conducted in a 
two-step process: First a preliminary assessment (PA) will make 
projections of the volume of dredged material, estimate the existing 
capacity for placement/disposal of the material, and verify that 
continued maintenance dredging is economically justified. If the PA 
concludes that continued maintenance dredging is justified and that the 
existing placement/disposal capacity is not adequate, then a Dredged 
Material Management Plan (DMMP) will be prepared to identify additional 
placement/disposal sites with adequate capacity for the next 20 years 
of federal and non-federal maintenance dredging.

DATES: A public meeting will be held on April 30, 2015, at 7:00 p.m. 
(PDT). Submit comments concerning this project on or before May 18, 
2015.

ADDRESSES: The public meeting will be held at the Petaluma Community 
Center, 320 North McDowell Boulevard, Petaluma, CA 94954. Mail written 
comments concerning this notice to: U.S. Army Corps of Engineers, San 
Francisco District, Engineering and Technical Services Division, ATTN: 
Roxanne Grillo, 1455 Market Street, 17th Floor, San Francisco, CA 
94103-1398. Comment letters should include the commenter's physical 
mailing address and the project title, Petaluma River federal 
navigation project, in the subject line.

FOR FURTHER INFORMATION CONTACT: Roxanne Grillo, U.S. Army Corps of 
Engineers, San Francisco District, Environmental Section A, 1455 Market 
Street, 17th Floor, San Francisco, CA 94103-1398, (415) 503-6859, 
[email protected].

SUPPLEMENTARY INFORMATION: If the Corps determines that preparation of 
a DMMP is necessary, an accompanying Environmental Assessment in 
accordance will be prepared in accordance with the National 
Environmental Policy Act (NEPA). The primary federal actions under 
consideration are dredging, dredged material placement/disposal, and 
transport of dredged material for the purpose of aquatic disposal and/
or upland beneficial reuse. The City of Petaluma is the non-federal 
sponsor (NFS). An Environmental Assessment is intended to be sufficient 
in scope to address the federal, state and local requirements and 
environmental issues concerning the proposed activities and permit 
approvals.
    Project Site and Background Information: The Petaluma River federal 
navigation project is located on the

[[Page 20203]]

Northern California coast about 35 miles to the north of San Francisco. 
It consists of two portions: The Upper Channel that begins in Petaluma 
City and extends 14 miles to the mouth of Petaluma River at San Pablo 
Bay (near the Highway 37 Bridge); and the Across the Flats (ATF) 
portion that continues southeast of the Highway 37 Bridge and extends 5 
miles into the deeper water of San Pablo Bay. It is a shallow draft 
navigation project that supports light commercial and sport fishing, 
and recreational boating.
    Both the channel width and depth vary throughout the entire length 
of the federal project. An 8 foot depth is authorized for the five 
miles of the ATF portion extending into San Pablo Bay (200 foot wide 
channel) and as far upstream as Western Avenue in the City of Petaluma 
(100 foot wide channel). This includes a 300 foot by 400 foot turning 
basin. The channel then reduces to 50 feet wide with a 4 foot depth 
until the Washington Street Bridge and from there it reduces to a 40 
foot width and a 4 foot depth for an additional 935 linear feet.
    Historically, dredged sediment from the Upper Channel was placed at 
an upland disposal site located downstream of the turning basin. The 
dredged sediment from the ATF portion has historically been placed at 
the San Pablo in-bay disposal site SF-10.
    Proposed Action(s): The San Francisco District, US Army Corps of 
Engineers, is evaluating whether there is sufficient placement/disposal 
capacity and verifying economic justification to support continued 
federal and non-federal maintenance dredging over the next 20 years.
    Issues: Potentially significant issues associated with the project 
may include: air quality emissions, biological resource impacts, 
hazards and hazardous materials, hydrology and water quality, noise, 
traffic and transportation, and cumulative impacts from past, present 
and reasonably foreseeable future projects.
    Scoping Process: The U.S. Army Corps of Engineers is seeking 
participation and input of all interested federal, state, and local 
agencies, Native American groups, and other concerned private 
organizations or individuals through this public notice. The purpose of 
the public meeting is to solicit comments regarding the potential 
impacts and environmental issues associated with the proposed action to 
be considered. A meeting will be held on April 30, 2015, at 7:00 p.m. 
(PDT). The draft PA is expected to be available for public review and 
comment in late summer of 2015.

John C. Morrow,
Lieutenant Colonel, U.S. Army, District Engineer.
[FR Doc. 2015-08723 Filed 4-14-15; 8:45 am]
 BILLING CODE 3720-58-P



                                              20202                        Federal Register / Vol. 80, No. 72 / Wednesday, April 15, 2015 / Notices

                                                 Availability of Materials for the                    meeting so that they may be made                      placement/disposal of projected
                                              Meeting. A copy of the agenda or any                    available to the Board for its                        maintenance dredged material from
                                              updates to the agenda for the May 14,                   consideration prior to the meeting.                   Petaluma River. This evaluation will be
                                              2015 meeting will be available at the                   Written comments or statements                        conducted in a two-step process: First a
                                              meeting. The final version will be                      received after this date may not be                   preliminary assessment (PA) will make
                                              provided at the meeting. All materials                  provided to the Board until its next                  projections of the volume of dredged
                                              will be posted to the Web site after the                meeting. Please note that because the                 material, estimate the existing capacity
                                              meeting.                                                Board operates under the provisions of                for placement/disposal of the material,
                                                 Public Accessibility to the Meeting:                 the Federal Advisory Committee Act, as                and verify that continued maintenance
                                              Pursuant to 5 U.S.C. 552b, as amended,                  amended, all written comments will be                 dredging is economically justified. If the
                                              and 41 CFR 102–3.140 through 102–                       treated as public documents and will be               PA concludes that continued
                                              3.165, and subject to the availability of               made available for public inspection.                 maintenance dredging is justified and
                                              space, this meeting is open to the                         Verbal Comments: Members of the                    that the existing placement/disposal
                                              public. Registration of members of the                  public will be permitted to make verbal               capacity is not adequate, then a Dredged
                                              public who wish to attend the meeting                   comments during the Board meeting                     Material Management Plan (DMMP) will
                                              will begin at 8:15 a.m. on the day of the               only at the time and in the manner                    be prepared to identify additional
                                              meeting. Seating is limited and is on a                 allowed herein. If a member of the                    placement/disposal sites with adequate
                                              first-to-arrive basis. Attendees will be                public is interested in making a verbal               capacity for the next 20 years of federal
                                              asked to provide their name, title,                     comment at the open meeting, that                     and non-federal maintenance dredging.
                                              affiliation, and contact information to                 individual must submit a request, with                DATES: A public meeting will be held on
                                              include email address and daytime                       a brief statement of the subject matter to            April 30, 2015, at 7:00 p.m. (PDT).
                                              telephone number at registration. Any                   be addressed by the comment, at least                 Submit comments concerning this
                                              interested person may attend the                        three (3) business days in advance to the             project on or before May 18, 2015.
                                              meeting, file written comments or                       committee DFO or ADFO, via electronic                 ADDRESSES: The public meeting will be
                                              statements with the committee, or make                  mail, the preferred mode of submission,               held at the Petaluma Community
                                              verbal comments from the floor during                   at the addresses listed in the FOR                    Center, 320 North McDowell Boulevard,
                                              the public meeting, at the times, and in                FURTHER INFORMATION CONTACT section.                  Petaluma, CA 94954. Mail written
                                              the manner, permitted by the                            The committee DFO and ADFO will log                   comments concerning this notice to:
                                              committee, as set forth below.                          each request to make a comment, in the                U.S. Army Corps of Engineers, San
                                                 Special Accommodations: The                          order received, and determine whether                 Francisco District, Engineering and
                                              meeting venue is fully handicap                         the subject matter of each comment is                 Technical Services Division, ATTN:
                                              accessible, with wheelchair access.                     relevant to the Board’s mission and/or                Roxanne Grillo, 1455 Market Street,
                                              Individuals requiring special                           the topics to be addressed in this public             17th Floor, San Francisco, CA 94103–
                                              accommodations to access the public                     meeting. A 15-minute period near the                  1398. Comment letters should include
                                              meeting or seeking additional                           end of meeting will be available for                  the commenter’s physical mailing
                                              information about public access                         verbal public comments. Members of                    address and the project title, Petaluma
                                              procedures, should contact Mr. Pointon,                 the public who have requested to make                 River federal navigation project, in the
                                              the committee DFO, or Mr. Lichtman,                     a verbal comment and whose comments
                                              the ADFO, at the email addresses or                                                                           subject line.
                                                                                                      have been deemed relevant under the                   FOR FURTHER INFORMATION CONTACT:
                                              telephone numbers listed in the FOR                     process described above, will be allotted
                                              FURTHER INFORMATION CONTACT section,                                                                          Roxanne Grillo, U.S. Army Corps of
                                                                                                      no more than three (3) minutes during                 Engineers, San Francisco District,
                                              at least five (5) business days prior to                this period, and will be invited to speak
                                              the meeting so that appropriate                                                                               Environmental Section A, 1455 Market
                                                                                                      in the order in which their requests                  Street, 17th Floor, San Francisco, CA
                                              arrangements can be made.                               were received by the DFO and ADFO.
                                                 Written Comments or Statements:                                                                            94103–1398, (415) 503–6859,
                                              Pursuant to 41 CFR 102–3.105(j) and                     Brenda S. Bowen,                                      Roxanne.Grillo@usace.army.mil.
                                              102–3.140 and section 10(a)(3) of the                   Army Federal Register Liaison Officer.                SUPPLEMENTARY INFORMATION: If the
                                              Federal Advisory Committee Act, the                     [FR Doc. 2015–08561 Filed 4–14–15; 8:45 am]           Corps determines that preparation of a
                                              public or interested organizations may                  BILLING CODE 3720–58–P                                DMMP is necessary, an accompanying
                                              submit written comments or statements                                                                         Environmental Assessment in
                                              to the Board about its mission and/or                                                                         accordance will be prepared in
                                              the topics to be addressed in this public               DEPARTMENT OF DEFENSE                                 accordance with the National
                                              meeting. Written comments or                                                                                  Environmental Policy Act (NEPA). The
                                              statements should be submitted to Mr.                   Department of the Army, U.S. Army                     primary federal actions under
                                              Pointon, the committee DFO, or Mr.                      Corps of Engineers                                    consideration are dredging, dredged
                                              Lichtman, the committee ADFO, via                                                                             material placement/disposal, and
                                              electronic mail, the preferred mode of                  Notice To Conduct a Public Meeting for                transport of dredged material for the
                                              submission, at the addresses listed in                  Preparation of a Preliminary                          purpose of aquatic disposal and/or
                                              the FOR FURTHER INFORMATION CONTACT                     Assessment and Dredged Material                       upland beneficial reuse. The City of
                                              section in the following formats: Adobe                 Management Plan for Petaluma River,                   Petaluma is the non-federal sponsor
                                              Acrobat or Microsoft Word. The                          City of Petaluma, Sonoma County, CA                   (NFS). An Environmental Assessment is
                                              comment or statement must include the                   AGENCY:  Department of the Army, U.S.                 intended to be sufficient in scope to
tkelley on DSK3SPTVN1PROD with NOTICES




                                              author’s name, title, affiliation, address,             Army Corps of Engineers, DOD.                         address the federal, state and local
                                              and daytime telephone number. Written                   ACTION: Public Notice.                                requirements and environmental issues
                                              comments or statements being                                                                                  concerning the proposed activities and
                                              submitted in response to the agenda set                 SUMMARY:    The purpose of this notice is             permit approvals.
                                              forth in this notice must be received by                to initiate the scoping process for an                   Project Site and Background
                                              the committee DFO or ADFO at least                      evaluation of whether there is adequate               Information: The Petaluma River federal
                                              five (5) business days prior to the                     capacity at existing placement sites for              navigation project is located on the


                                         VerDate Sep<11>2014   17:29 Apr 14, 2015   Jkt 235001   PO 00000   Frm 00006   Fmt 4703   Sfmt 4703   E:\FR\FM\15APN1.SGM   15APN1


                                                                           Federal Register / Vol. 80, No. 72 / Wednesday, April 15, 2015 / Notices                                         20203

                                              Northern California coast about 35 miles                for public review and comment in late                 for programs of research in areas of
                                              to the north of San Francisco. It consists              summer of 2015.                                       demonstrated national need.
                                              of two portions: The Upper Channel that                                                                          Competitions in This Notice: The
                                                                                                      John C. Morrow,
                                              begins in Petaluma City and extends 14                                                                        Institute will conduct eight research
                                                                                                      Lieutenant Colonel, U.S. Army, District               competitions in FY 2016 through two of
                                              miles to the mouth of Petaluma River at                 Engineer.
                                              San Pablo Bay (near the Highway 37                                                                            its centers:
                                                                                                      [FR Doc. 2015–08723 Filed 4–14–15; 8:45 am]              The Institute’s National Center for
                                              Bridge); and the Across the Flats (ATF)
                                              portion that continues southeast of the                 BILLING CODE 3720–58–P                                Education Research (NCER) will hold
                                              Highway 37 Bridge and extends 5 miles                                                                         six competitions: one competition for
                                              into the deeper water of San Pablo Bay.                                                                       education research, one competition for
                                              It is a shallow draft navigation project                DEPARTMENT OF EDUCATION                               education research training, one
                                              that supports light commercial and                                                                            competition for education research and
                                                                                                      Applications for New Awards;                          development centers, one competition
                                              sport fishing, and recreational boating.                Education Research and Special                        for statistical and research methodology
                                                 Both the channel width and depth                     Education Research Grant Programs                     in education, one competition for
                                              vary throughout the entire length of the                                                                      partnerships and collaborations focused
                                                                                                      AGENCY: Institute of Education Sciences,
                                              federal project. An 8 foot depth is                                                                           on problems of practice or policy, and
                                                                                                      Department of Education.
                                              authorized for the five miles of the ATF                                                                      one competition for research networks.
                                                                                                      ACTION: Notice.
                                              portion extending into San Pablo Bay                                                                             The Institute’s National Center for
                                              (200 foot wide channel) and as far                                                                            Special Education Research (NCSER)
                                              upstream as Western Avenue in the City                  Overview Information
                                                                                                                                                            will hold two competitions: one
                                              of Petaluma (100 foot wide channel).                    Education Research and Special                        competition for special education
                                              This includes a 300 foot by 400 foot                    Education Research Grant Programs                     research and one competition for special
                                              turning basin. The channel then reduces                   Notice inviting applications for new                education research training.
                                              to 50 feet wide with a 4 foot depth until               awards for fiscal year (FY) 2016.
                                              the Washington Street Bridge and from                                                                         NCER Competitions
                                                                                                        Catalog of Federal Domestic Assistance
                                              there it reduces to a 40 foot width and                                                                         The Education Research Competition.
                                                                                                      (CFDA) Numbers: 84.305A, 84.305B,
                                              a 4 foot depth for an additional 935                    84.305C, 84.305D, 84.305H, 84.305N,                   Under this competition, NCER will
                                              linear feet.                                            84.324A, and 84.324B.                                 consider only applications that address
                                                 Historically, dredged sediment from                                                                        one of the following ten education
                                                                                                      DATES:   The dates when applications are
                                              the Upper Channel was placed at an                                                                            research topics:
                                                                                                      available and the deadlines for                         • Cognition and Student Learning.
                                              upland disposal site located                            transmittal of applications invited under               • Early Learning Programs and
                                              downstream of the turning basin. The                    this notice are indicated in the chart at             Policies.
                                              dredged sediment from the ATF portion                   the end of this notice.                                 • Education Technology.
                                              has historically been placed at the San                 SUMMARY: The Acting Director of the                     • Effective Teachers and Effective
                                              Pablo in-bay disposal site SF–10.                       Institute of Education Sciences                       Teaching.
                                                 Proposed Action(s): The San                          (Institute) announces the Institute’s FY                • English Learners.
                                              Francisco District, US Army Corps of                    2016 competitions for grants to support                 • Improving Education Systems:
                                              Engineers, is evaluating whether there is               education research and special                        Policies, Organization, Management,
                                              sufficient placement/disposal capacity                  education research. The Acting Director               and Leadership.
                                              and verifying economic justification to                 takes this action under the Education                   • Mathematics and Science
                                              support continued federal and non-                      Sciences Reform Act of 2002. The                      Education.
                                              federal maintenance dredging over the                   Institute’s purpose in awarding these                   • Postsecondary and Adult
                                              next 20 years.                                          grants is to provide national leadership              Education.
                                                                                                      in expanding fundamental knowledge                      • Reading and Writing.
                                                 Issues: Potentially significant issues               and understanding of (1) developmental                  • Social and Behavioral Context for
                                              associated with the project may include:                and school readiness outcomes for                     Academic Learning.
                                              air quality emissions, biological                       infants and toddlers with or at risk for                The Research Training Programs in
                                              resource impacts, hazards and                           disability, and (2) education outcomes                the Education Sciences. Under this
                                              hazardous materials, hydrology and                      for all students from early childhood                 competition, NCER will consider only
                                              water quality, noise, traffic and                       education through postsecondary and                   applications that address the following
                                              transportation, and cumulative impacts                  adult education.                                      topic:
                                              from past, present and reasonably                                                                               • Pathways to the Education Sciences
                                              foreseeable future projects.                            Full Text of Announcement                             Research Training.
                                                                                                      I. Funding Opportunity Description                      The Education Research and
                                                 Scoping Process: The U.S. Army                                                                             Development Centers Competition.
                                              Corps of Engineers is seeking                              Purpose of Program: The central                    Under this competition, NCER will
                                              participation and input of all interested               purpose of the Institute’s research grant             consider only applications that address
                                              federal, state, and local agencies, Native              programs is to provide interested                     the following topic:
                                              American groups, and other concerned                    individuals and the general public with                 • Virtual Learning.
                                              private organizations or individuals                    reliable and valid information about                    The Statistical and Research
                                              through this public notice. The purpose                 education practices that support                      Methodology in Education Competition.
tkelley on DSK3SPTVN1PROD with NOTICES




                                              of the public meeting is to solicit                     learning and improve academic                         Under this competition, NCER will
                                              comments regarding the potential                        achievement and access to education                   consider only applications that address
                                              impacts and environmental issues                        opportunities for all students. These                 the following topic:
                                              associated with the proposed action to                  interested individuals include parents,                 • Early Career Statistical and
                                              be considered. A meeting will be held                   educators, students, researchers, and                 Research Methodology Grants.
                                              on April 30, 2015, at 7:00 p.m. (PDT).                  policymakers. In carrying out its grant                 Partnerships and Collaborations
                                              The draft PA is expected to be available                programs, the Institute provides support              Focused on Problems of Practice or


                                         VerDate Sep<11>2014   17:29 Apr 14, 2015   Jkt 235001   PO 00000   Frm 00007   Fmt 4703   Sfmt 4703   E:\FR\FM\15APN1.SGM   15APN1



Document Created: 2015-12-18 11:13:43
Document Modified: 2015-12-18 11:13:43
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionPublic Notice.
DatesA public meeting will be held on April 30, 2015, at 7:00 p.m. (PDT). Submit comments concerning this project on or before May 18, 2015.
ContactRoxanne Grillo, U.S. Army Corps of Engineers, San Francisco District, Environmental Section A, 1455 Market Street, 17th Floor, San Francisco, CA 94103-1398, (415) 503-6859, [email protected]
FR Citation80 FR 20202 