80 FR 20202 - Notice To Conduct a Public Meeting for Preparation of a Preliminary Assessment and Dredged Material Management Plan for Petaluma River, City of Petaluma, Sonoma County, CA

DEPARTMENT OF DEFENSE
Department of the Army, U.S. Army Corps of Engineers

Federal Register Volume 80, Issue 72 (April 15, 2015)

Page Range20202-20203
FR Document2015-08723

The purpose of this notice is to initiate the scoping process for an evaluation of whether there is adequate capacity at existing placement sites for placement/disposal of projected maintenance dredged material from Petaluma River. This evaluation will be conducted in a two-step process: First a preliminary assessment (PA) will make projections of the volume of dredged material, estimate the existing capacity for placement/disposal of the material, and verify that continued maintenance dredging is economically justified. If the PA concludes that continued maintenance dredging is justified and that the existing placement/disposal capacity is not adequate, then a Dredged Material Management Plan (DMMP) will be prepared to identify additional placement/disposal sites with adequate capacity for the next 20 years of federal and non-federal maintenance dredging.

Federal Register, Volume 80 Issue 72 (Wednesday, April 15, 2015)
[Federal Register Volume 80, Number 72 (Wednesday, April 15, 2015)]
[Notices]
[Pages 20202-20203]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-08723]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, U.S. Army Corps of Engineers


Notice To Conduct a Public Meeting for Preparation of a 
Preliminary Assessment and Dredged Material Management Plan for 
Petaluma River, City of Petaluma, Sonoma County, CA

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD.

ACTION: Public Notice.

-----------------------------------------------------------------------

SUMMARY: The purpose of this notice is to initiate the scoping process 
for an evaluation of whether there is adequate capacity at existing 
placement sites for placement/disposal of projected maintenance dredged 
material from Petaluma River. This evaluation will be conducted in a 
two-step process: First a preliminary assessment (PA) will make 
projections of the volume of dredged material, estimate the existing 
capacity for placement/disposal of the material, and verify that 
continued maintenance dredging is economically justified. If the PA 
concludes that continued maintenance dredging is justified and that the 
existing placement/disposal capacity is not adequate, then a Dredged 
Material Management Plan (DMMP) will be prepared to identify additional 
placement/disposal sites with adequate capacity for the next 20 years 
of federal and non-federal maintenance dredging.

DATES: A public meeting will be held on April 30, 2015, at 7:00 p.m. 
(PDT). Submit comments concerning this project on or before May 18, 
2015.

ADDRESSES: The public meeting will be held at the Petaluma Community 
Center, 320 North McDowell Boulevard, Petaluma, CA 94954. Mail written 
comments concerning this notice to: U.S. Army Corps of Engineers, San 
Francisco District, Engineering and Technical Services Division, ATTN: 
Roxanne Grillo, 1455 Market Street, 17th Floor, San Francisco, CA 
94103-1398. Comment letters should include the commenter's physical 
mailing address and the project title, Petaluma River federal 
navigation project, in the subject line.

FOR FURTHER INFORMATION CONTACT: Roxanne Grillo, U.S. Army Corps of 
Engineers, San Francisco District, Environmental Section A, 1455 Market 
Street, 17th Floor, San Francisco, CA 94103-1398, (415) 503-6859, 
[email protected].

SUPPLEMENTARY INFORMATION: If the Corps determines that preparation of 
a DMMP is necessary, an accompanying Environmental Assessment in 
accordance will be prepared in accordance with the National 
Environmental Policy Act (NEPA). The primary federal actions under 
consideration are dredging, dredged material placement/disposal, and 
transport of dredged material for the purpose of aquatic disposal and/
or upland beneficial reuse. The City of Petaluma is the non-federal 
sponsor (NFS). An Environmental Assessment is intended to be sufficient 
in scope to address the federal, state and local requirements and 
environmental issues concerning the proposed activities and permit 
approvals.
    Project Site and Background Information: The Petaluma River federal 
navigation project is located on the

[[Page 20203]]

Northern California coast about 35 miles to the north of San Francisco. 
It consists of two portions: The Upper Channel that begins in Petaluma 
City and extends 14 miles to the mouth of Petaluma River at San Pablo 
Bay (near the Highway 37 Bridge); and the Across the Flats (ATF) 
portion that continues southeast of the Highway 37 Bridge and extends 5 
miles into the deeper water of San Pablo Bay. It is a shallow draft 
navigation project that supports light commercial and sport fishing, 
and recreational boating.
    Both the channel width and depth vary throughout the entire length 
of the federal project. An 8 foot depth is authorized for the five 
miles of the ATF portion extending into San Pablo Bay (200 foot wide 
channel) and as far upstream as Western Avenue in the City of Petaluma 
(100 foot wide channel). This includes a 300 foot by 400 foot turning 
basin. The channel then reduces to 50 feet wide with a 4 foot depth 
until the Washington Street Bridge and from there it reduces to a 40 
foot width and a 4 foot depth for an additional 935 linear feet.
    Historically, dredged sediment from the Upper Channel was placed at 
an upland disposal site located downstream of the turning basin. The 
dredged sediment from the ATF portion has historically been placed at 
the San Pablo in-bay disposal site SF-10.
    Proposed Action(s): The San Francisco District, US Army Corps of 
Engineers, is evaluating whether there is sufficient placement/disposal 
capacity and verifying economic justification to support continued 
federal and non-federal maintenance dredging over the next 20 years.
    Issues: Potentially significant issues associated with the project 
may include: air quality emissions, biological resource impacts, 
hazards and hazardous materials, hydrology and water quality, noise, 
traffic and transportation, and cumulative impacts from past, present 
and reasonably foreseeable future projects.
    Scoping Process: The U.S. Army Corps of Engineers is seeking 
participation and input of all interested federal, state, and local 
agencies, Native American groups, and other concerned private 
organizations or individuals through this public notice. The purpose of 
the public meeting is to solicit comments regarding the potential 
impacts and environmental issues associated with the proposed action to 
be considered. A meeting will be held on April 30, 2015, at 7:00 p.m. 
(PDT). The draft PA is expected to be available for public review and 
comment in late summer of 2015.

John C. Morrow,
Lieutenant Colonel, U.S. Army, District Engineer.
[FR Doc. 2015-08723 Filed 4-14-15; 8:45 am]
 BILLING CODE 3720-58-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionPublic Notice.
DatesA public meeting will be held on April 30, 2015, at 7:00 p.m. (PDT). Submit comments concerning this project on or before May 18, 2015.
ContactRoxanne Grillo, U.S. Army Corps of Engineers, San Francisco District, Environmental Section A, 1455 Market Street, 17th Floor, San Francisco, CA 94103-1398, (415) 503-6859, [email protected]
FR Citation80 FR 20202 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR