DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 139 (July 20, 2016)

Page Range47168-47168
FR Document2016-17125

Federal Register, Volume 81 Issue 139 (Wednesday, July 20, 2016)
[Federal Register Volume 81, Number 139 (Wednesday, July 20, 2016)]
[Notices]
[Page 47168]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-17125]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14514-002]


Community of Elfin Cove, DBA Elfin Cove Utility Commission; 
Notice of Successive Preliminary Permit Application Accepted for Filing 
and Soliciting Comments, Motions To Intervene, and Competing 
Applications

    On July 1, 2016, the Community of Elfin Cove, DBA Elfin Cove 
Utility Commission (Elfin Cove) filed an application for a successive 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), to study the feasibility of the proposed Crooked Creek and Jim's 
Lake Hydroelectric Project (project) to be located on Crooked Creek and 
Jim's Lake, 70 miles west of Juneau, in the unincorporated Sitka 
Recording District, Alaska. The sole purpose of a preliminary permit, 
if issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of two developments, the Upper 
System and the Lower System.
    The Upper System would consist of: (1) A 20-foot-long, 4-foot-wide, 
4-foot-tall diversion structure to divert up to 5 cubic feet per second 
(cfs) from Crooked Creek; (2) a 1,200-foot-long, 1-foot-diameter buried 
penstock; (3) a 20-foot-long, 20-foot-wide powerhouse containing a 35-
kilowatt (kW) crossflow turbine/generator; (4) a 50-foot-long, 8-foot-
wide, 3-foot-deep cobble-lined tailrace discharging flows into Jim's 
Lake; and (5) appurtenant facilities.
    The Lower System would consist of: (1) A 220-foot-long, 20-foot-
high rock-fill embankment dam and intake at the outlet to Jim's Lake; 
(2) a 2,050-foot-long, 1.2-foot-diameter buried penstock; (3) a 24-
foot-long, 24-foot-wide powerhouse containing a 105-kW Pelton turbine/
generator; (4) a 150-foot-long, 8-foot-wide, 3-foot-deep cobble-lined 
tailrace discharging flows into Port Althorp; and (5) appurtenant 
facilities.
    The 300-foot-long, 7.2/12.47 kV buried transmission line from the 
upper powerhouse would converge with the 2,800-foot-long, 7.2/12.47 kV 
buried transmission line from the lower powerhouse into a single 8,400-
foot-long, 7.2/12.47 kV buried transmission line extending to Elfin 
Cove's existing 7.2/12.47-kV distribution network.
    The estimated annual generation of the project would be 655.5 
megawatt-hours. The project would be partially located on 60 acres of 
federal lands managed by the U.S. Forest Service in the Tongass 
National Forest.
    Applicant Contact: Joel Groves, Polarconsult Alaska, Inc., 1503 
West 33rd Avenue, Number 310, Anchorage, AK 99503; phone: (907) 258-
2420 x204.
    FERC Contact: Sean O'Neill; phone: (202) 502-6462.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14514-002.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14514) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: July 14, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-17125 Filed 7-19-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  47168                        Federal Register / Vol. 81, No. 139 / Wednesday, July 20, 2016 / Notices

                                                  operation of the Commission’s                            tailrace discharging flows into Port                  DEPARTMENT OF ENERGY
                                                  regulations. 18 CFR 366.7(a).                            Althorp; and (5) appurtenant facilities.
                                                    Dated: July 14, 2016.                                     The 300-foot-long, 7.2/12.47 kV                    Federal Energy Regulatory
                                                                                                           buried transmission line from the upper               Commission
                                                  Nathaniel J. Davis, Sr.,
                                                  Deputy Secretary
                                                                                                           powerhouse would converge with the                    [Docket No. CP16–474–000]
                                                                                                           2,800-foot-long, 7.2/12.47 kV buried
                                                  [FR Doc. 2016–17099 Filed 7–19–16; 8:45 am]
                                                                                                           transmission line from the lower                      High Point Gas Transmission, LLC;
                                                  BILLING CODE 6717–01–P
                                                                                                           powerhouse into a single 8,400-foot-                  Notice of Application
                                                                                                           long, 7.2/12.47 kV buried transmission
                                                                                                                                                                    Take notice that on July 1, 2016, High
                                                                                                           line extending to Elfin Cove’s existing
                                                  DEPARTMENT OF ENERGY                                                                                           Point Gas Transmission, LLC, 1400 16th
                                                                                                           7.2/12.47-kV distribution network.
                                                                                                                                                                 Street, Suite 310, Denver, Colorado
                                                  Federal Energy Regulatory                                   The estimated annual generation of                 80202, filed in Docket No. CP16–474–
                                                  Commission                                               the project would be 655.5 megawatt-                  000 an application pursuant to section
                                                                                                           hours. The project would be partially                 7(b) of the Natural Gas Act (NGA) for
                                                  [Project No. 14514–002]
                                                                                                           located on 60 acres of federal lands                  authorization to abandon by sale to
                                                                                                           managed by the U.S. Forest Service in                 Cayenne Pipeline, LLC (Cayenne)
                                                  Community of Elfin Cove, DBA Elfin                       the Tongass National Forest.                          approximately 61.3 miles of 12–22-inch-
                                                  Cove Utility Commission; Notice of                          Applicant Contact: Joel Groves,                    diameter pipeline facilities in
                                                  Successive Preliminary Permit                            Polarconsult Alaska, Inc., 1503 West                  Plaquemines and St. Bernard Parishes,
                                                  Application Accepted for Filing and                      33rd Avenue, Number 310, Anchorage,                   Louisiana. Upon completion of the sale,
                                                  Soliciting Comments, Motions To                          AK 99503; phone: (907) 258–2420 x204.                 Cayenne will make certain changes to
                                                  Intervene, and Competing Applications                       FERC Contact: Sean O’Neill; phone:                 the facilities to enable it to transport
                                                                                                           (202) 502–6462.                                       natural gas liquids, all as more fully set
                                                     On July 1, 2016, the Community of                        Deadline for filing comments, motions              forth in the application which is on file
                                                  Elfin Cove, DBA Elfin Cove Utility                       to intervene, competing applications                  with the Commission and open to
                                                  Commission (Elfin Cove) filed an                         (without notices of intent), or notices of            public inspection. The filing is available
                                                  application for a successive preliminary                 intent to file competing applications: 60             for review at the Commission in the
                                                  permit, pursuant to section 4(f) of the                  days from the issuance of this notice.                Public Reference Room or may be
                                                  Federal Power Act (FPA), to study the                    Competing applications and notices of                 viewed on the Commission’s Web site at
                                                  feasibility of the proposed Crooked                      intent must meet the requirements of 18               http://www.ferc.gov using the
                                                  Creek and Jim’s Lake Hydroelectric                       CFR 4.36.                                             ‘‘eLibrary’’ link. Enter the docket
                                                  Project (project) to be located on                          The Commission strongly encourages                 number excluding the last three digits in
                                                  Crooked Creek and Jim’s Lake, 70 miles                   electronic filing. Please file comments,              the docket number field to access the
                                                  west of Juneau, in the unincorporated                    motions to intervene, notices of intent,              document. For assistance, contact FERC
                                                  Sitka Recording District, Alaska. The                    and competing applications using the                  at FERCOnlineSupport@ferc.gov or call
                                                  sole purpose of a preliminary permit, if                 Commission’s eFiling system at http://                toll-free, (886) 208–3676 or TYY, (202)
                                                  issued, is to grant the permit holder                    www.ferc.gov/docs-filing/efiling.asp.                 502–8659.
                                                  priority to file a license application                   Commenters can submit brief comments                     Any questions concerning these
                                                  during the permit term. A preliminary                    up to 6,000 characters, without prior                 applications may be directed to Dennis
                                                  permit does not authorize the permit                     registration, using the eComment system               J. Kelly, Senior Counsel, High Point Gas
                                                  holder to perform any land-disturbing                    at http://www.ferc.gov/docs-filing/                   Transmission, LLC, 1400 16th Street,
                                                  activities or otherwise enter upon lands                 ecomment.asp. You must include your                   Suite 310, Denver, Colorado 80202, by
                                                  or waters owned by others without the                    name and contact information at the end               telephone at (720) 457–6076.
                                                  owners’ express permission.                              of your comments. For assistance,                        Pursuant to section 157.9 of the
                                                     The proposed project would consist of                 please contact FERC Online Support at                 Commission’s rules, 18 CFR 157.9,
                                                  two developments, the Upper System                       FERCOnlineSupport@ferc.gov, (866)                     within 90 days of this Notice the
                                                  and the Lower System.                                    208–3676 (toll free), or (202) 502–8659               Commission staff will either: Complete
                                                     The Upper System would consist of:                    (TTY). In lieu of electronic filing, please           its environmental assessment (EA) and
                                                  (1) A 20-foot-long, 4-foot-wide, 4-foot-                 send a paper copy to: Secretary, Federal              place it into the Commission’s public
                                                  tall diversion structure to divert up to 5               Energy Regulatory Commission, 888                     record (eLibrary) for this proceeding; or
                                                  cubic feet per second (cfs) from Crooked                 First Street NE., Washington, DC 20426.               issue a Notice of Schedule for
                                                  Creek; (2) a 1,200-foot-long, 1-foot-                    The first page of any filing should                   Environmental Review. If a Notice of
                                                  diameter buried penstock; (3) a 20-foot-                 include docket number P–14514–002.                    Schedule for Environmental Review is
                                                  long, 20-foot-wide powerhouse                               More information about this project,               issued, it will indicate, among other
                                                  containing a 35-kilowatt (kW) crossflow                  including a copy of the application, can              milestones, the anticipated date for the
                                                  turbine/generator; (4) a 50-foot-long, 8-                be viewed or printed on the ‘‘eLibrary’’              Commission staff’s issuance of the final
                                                  foot-wide, 3-foot-deep cobble-lined                      link of the Commission’s Web site at                  environmental impact statement (FEIS)
                                                  tailrace discharging flows into Jim’s                    http://www.ferc.gov/docs-filing/                      or EA for this proposal. The filing of the
                                                  Lake; and (5) appurtenant facilities.                    elibrary.asp. Enter the docket number                 EA in the Commission’s public record
                                                     The Lower System would consist of:                    (P–14514) in the docket number field to               for this proceeding or the issuance of a
                                                  (1) A 220-foot-long, 20-foot-high rock-                                                                        Notice of Schedule for Environmental
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                           access the document. For assistance,
                                                  fill embankment dam and intake at the                    contact FERC Online Support.                          Review will serve to notify federal and
                                                  outlet to Jim’s Lake; (2) a 2,050-foot-                                                                        state agencies of the timing for the
                                                  long, 1.2-foot-diameter buried penstock;                   Dated: July 14, 2016.                               completion of all necessary reviews, and
                                                  (3) a 24-foot-long, 24-foot-wide                         Kimberly D. Bose,                                     the subsequent need to complete all
                                                  powerhouse containing a 105-kW Pelton                    Secretary.                                            federal authorizations within 90 days of
                                                  turbine/generator; (4) a 150-foot-long, 8-               [FR Doc. 2016–17125 Filed 7–19–16; 8:45 am]           the date of issuance of the Commission
                                                  foot-wide, 3-foot-deep cobble-lined                      BILLING CODE 6717–01–P                                staff’s FEIS or EA.


                                             VerDate Sep<11>2014   18:24 Jul 19, 2016   Jkt 238001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\20JYN1.SGM   20JYN1



Document Created: 2018-02-08 07:57:16
Document Modified: 2018-02-08 07:57:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 47168 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR