81_FR_94677 81 FR 94430 - Design of Structures, Components, Equipment, and Systems, and Reactor Coolant System and Connected Systems Guidance

81 FR 94430 - Design of Structures, Components, Equipment, and Systems, and Reactor Coolant System and Connected Systems Guidance

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 81, Issue 247 (December 23, 2016)

Page Range94430-94431
FR Document2016-30908

The U.S. Nuclear Regulatory Commission (NRC) is issuing a final revision to several sections in Chapter 3, ``Design of Structures, Components, Equipment, and Systems Reactor Coolant System and Connected Systems,'' and Chapter 5, ``Reactor Coolant System and Connected Systems,'' of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.'' The revisions to these standard review plan (SRP) sections reflect no changes in staff position; rather they clarify the original intent of these SRP sections using plain language throughout in accordance with the NRC's Plain Writing Action Plan. Additionally, these revisions reflect operating experience, lessons learned, and the inclusion of updated guidance since the last revision, and address the applicability of regulatory treatment of non-safety systems where appropriate. The staff also deleted text in one of the Chapter 5 SRPs, as the text contained guidance that was included in other SRPs and, therefore, does not constitute removal of guidance and added several references to updated standards and guidance.

Federal Register, Volume 81 Issue 247 (Friday, December 23, 2016)
[Federal Register Volume 81, Number 247 (Friday, December 23, 2016)]
[Notices]
[Pages 94430-94431]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-30908]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2015-0198]


Design of Structures, Components, Equipment, and Systems, and 
Reactor Coolant System and Connected Systems Guidance

AGENCY: Nuclear Regulatory Commission.

ACTION: Standard review plan-final section revision; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a 
final revision to several sections in Chapter 3, ``Design of 
Structures, Components, Equipment, and Systems Reactor Coolant System 
and Connected Systems,'' and Chapter 5, ``Reactor Coolant System and 
Connected Systems,'' of NUREG-0800, ``Standard Review Plan for the 
Review of Safety Analysis Reports for Nuclear Power Plants: LWR 
Edition.'' The revisions to these standard review plan (SRP) sections 
reflect no changes in staff position; rather they clarify the original 
intent of these SRP sections using plain language throughout in 
accordance with the NRC's Plain Writing Action Plan. Additionally, 
these revisions reflect operating experience, lessons learned, and the 
inclusion of updated guidance since the last revision, and address the 
applicability of regulatory treatment of non-safety systems where 
appropriate. The staff also deleted text in one of the Chapter 5 SRPs, 
as the text contained guidance that was included in other SRPs and, 
therefore, does not constitute removal of guidance and added several 
references to updated standards and guidance.

DATES: The effective date of this Standard Review Plan (SRP) update is 
January 23, 2017.

ADDRESSES: Please refer to Docket ID NRC-2015-0198 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0198. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. For 
the convenience of the reader, the ADAMS accession numbers are provided 
in a table in the ``Availability of Documents'' section of this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Mark Notich, Office of New Reactors, 
telephone: 301-415-3053; email: [email protected]; or Nishka Devaser, 
Office of New Reactors, telephone: 301-415-5196; email: 
[email protected]; both staff at U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION:

I. Background

    A summary of the comments and the NRC staff's disposition of the 
comments are available in a separate document, ``Response to Public 
Comments on Draft Standard Review Plan Sections from Chapters 3 and 5: 
Design of Structures, Components, Equipment, and Systems, and Reactor 
Coolant System and

[[Page 94431]]

Connected Systems'' (ADAMS Accession No. ML16088A345).
    The Office of New Reactors and the Office of Nuclear Reactor 
Regulation are revising these sections from their current revisions. 
Details of specific changes in the proposed revisions are included at 
the end of each of the proposed sections.
    The changes to these SRP sections reflect current NRC staff review 
methods and practices based on lessons learned from the NRC's reviews 
of design certification and combined license applications completed 
since the last revision of this chapter.

II. Backfitting and Finality Provisions

    Issuance of these revised SRP sections does not constitute 
backfitting as defined in Sec.  50.109 of title 10 of the Code of 
Federal Regulations (10 CFR), ``Backfitting,'' (the Backfit Rule) or 
otherwise be inconsistent with the issue finality provisions in 10 CFR 
part 52. The NRC's position is based upon the following considerations.
    1. The SRP positions do not constitute backfitting, inasmuch as the 
SRP is internal guidance directed at the NRC staff with respect to 
their regulatory responsibilities.
    The SRP provides guidance to the staff on how to review an 
application for the NRC's regulatory approval in the form of licensing. 
Changes in internal staff guidance are not matters for which either 
nuclear power plant applicants or licensees are protected under either 
the Backfit Rule or the issue finality provisions of 10 CFR part 52.
    2. The NRC staff has no intention to impose the SRP positions on 
current licensees and regulatory approvals either now or in the future.
    The staff does not intend to impose or apply the positions 
described in the SRP to existing (already issued) licenses and 
regulatory approvals. Therefore, the issuance of a final SRP--even if 
considered guidance that is within the purview of the issue finality 
provisions in 10 CFR part 52--need not be evaluated as if it were a 
backfit or as being inconsistent with issue finality provisions. If, in 
the future, the staff seeks to impose a position in the SRP on holders 
of already issued licenses in a manner which does not provide issue 
finality as described in the applicable issue finality provision, then 
the staff must make the showing as set forth in the Backfit Rule or 
address the criteria for avoiding issue finality as described in the 
applicable issue finality provision.
    3. Backfitting and issue finality do not--with limited exceptions 
not applicable here--protect current or future applicants.
    Applicants and potential applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. This is because neither the Backfit 
Rule nor the issue finality provisions under 10 CFR part 52--with 
certain exclusions discussed in the next paragraph--were intended to 
apply to every NRC action which substantially changes the expectations 
of current and future applicants.
    The exceptions to the general principle are applicable whenever an 
applicant references a 10 CFR part 52 license (e.g., an early site 
permit) and/or NRC regulatory approval (e.g., a design certification 
rule) with specified issue finality provisions. The staff does not, at 
this time, intend to impose the positions represented in the SRP in a 
manner that is inconsistent with any issue finality provisions. If, in 
the future, the staff seeks to impose a position in the SRP in a manner 
which does not provide issue finality as described in the applicable 
issue finality provision, then the staff must address the criteria for 
avoiding issue finality as described in the applicable issue finality 
provision.

III. Congressional Review Act

    This action is a rule as defined in the Congressional Review Act (5 
U.S.C. 801-808). However, the Office of Management and Budget has not 
found it to be a major rule as defined in the Congressional Review Act.

IV. Availability of Documents

    The ADAMS accession numbers revised sections are available in ADAMS 
under the accession numbers in the table below.

------------------------------------------------------------------------
                                                               ADAMS
                        Document                          accession No.*
------------------------------------------------------------------------
Section 3.6.2, ``Determination of Rupture Locations and      ML16088A041
 Dynamic Effects Associated with the Postulated Rupture
 of Piping,'' Revision 3................................
Section 3.9.1, ``Special Topics for Mechanical               ML16088A068
 Components,'' Revision 4...............................
Section 3.10, ``Seismic and Dynamic Qualification of         ML16088A101
 Mechanical and Electrical Equipment,'' Revision 4......
Section 5.2.1.1, ``Compliance with the Codes and             ML16088A127
 Standards Rule, 10 CFR 50.55a,'' Revision 4............
Section 5.2.1.2, ``Applicable Code Cases,'' Revision 4..     ML16088A219
Branch Technical Position 3-4, ``Postulated Rupture          ML16085A315
 Locations in Fluid System Piping Inside and Outside
 Containment,'' Revision 3..............................
------------------------------------------------------------------------
* See documents in the package at ADAMS Accession Number ML16083A387 to
  see changes made since last revision.


    Dated at Rockville, Maryland, this 19th day of December, 2016.

    For the Nuclear Regulatory Commission.
Joseph Colaccino,
Chief, New Reactor Rulemaking and Guidance Branch, Division of 
Engineering, Infrastructure, and Advanced Reactors, Office of New 
Reactors.
[FR Doc. 2016-30908 Filed 12-22-16; 8:45 am]
BILLING CODE 7590-01-P



                                                  94430                       Federal Register / Vol. 81, No. 247 / Friday, December 23, 2016 / Notices

                                                  want to be publicly disclosed in your                     9. An estimate of the total number of               SRPs and, therefore, does not constitute
                                                  comment submission. All comment                         hours needed annually to comply with                  removal of guidance and added several
                                                  submissions are posted at http://                       the information collection requirement                references to updated standards and
                                                  www.regulations.gov and entered into                    or request: Each form requires, on                    guidance.
                                                  ADAMS. Comment submissions are not                      average, approximately 0.5 hours to                   DATES:   The effective date of this
                                                  routinely edited to remove identifying                  prepare. 136 × 0.5 hour = a total annual              Standard Review Plan (SRP) update is
                                                  or contact information.                                 burden for all respondents of 68 hours.               January 23, 2017.
                                                    If you are requesting or aggregating                    10. Abstract: The NRC Form 314
                                                  comments from other persons for                         furnishes information to the NRC                      ADDRESSES: Please refer to Docket ID
                                                  submission to the OMB, then you                         regarding transfer or other disposition of            NRC–2015–0198 when contacting the
                                                  should inform those persons not to                      radioactive material by licensees who                 NRC about the availability of
                                                  include identifying or contact                          wish to terminate their licenses. The                 information regarding this document.
                                                  information that they do not want to be                 information is used by the NRC as part                You may obtain publicly-available
                                                  publicly disclosed in their comment                     of the basis for its determination that the           information related to this document
                                                  submission. Your request should state                   facility has been cleared of radioactive              using any of the following methods:
                                                  that comment submissions are not                        material before the facility is released                 • Federal Rulemaking Web site: Go to
                                                  routinely edited to remove such                         for unrestricted use.                                 http://www.regulations.gov and search
                                                  information before making the comment                                                                         for Docket ID NRC–2015–0198. Address
                                                                                                            Dated at Rockville, Maryland, this 19th day
                                                  submissions available to the public or                                                                        questions about NRC dockets to Carol
                                                                                                          of December 2016.
                                                  entering the comment into ADAMS.                                                                              Gallagher; telephone: 301–415–3463;
                                                                                                            For the Nuclear Regulatory Commission.
                                                                                                                                                                email: Carol.Gallagher@nrc.gov. For
                                                  II. Background                                          David Cullison,                                       technical questions, contact the
                                                                                                          NRC Clearance Officer, Office of the Chief            individuals listed in the FOR FURTHER
                                                     Under the provisions of the                          Information Officer.
                                                  Paperwork Reduction Act of 1995 (44                                                                           INFORMATION CONTACT section of this
                                                                                                          [FR Doc. 2016–30909 Filed 12–22–16; 8:45 am]          document.
                                                  U.S.C. Chapter 35), the NRC recently
                                                  submitted a request for renewal of an                   BILLING CODE 7590–01–P                                   • NRC’s Agencywide Documents
                                                  existing collection of information to                                                                         Access and Management System
                                                  OMB for review entitled, ‘‘NRC Form                                                                           (ADAMS): You may obtain publicly
                                                                                                          NUCLEAR REGULATORY                                    available documents online in the
                                                  314, Certification of Disposition of
                                                                                                          COMMISSION                                            ADAMS Public Documents collection at
                                                  Material.’’ The NRC hereby informs
                                                  potential respondents that an agency                    [NRC–2015–0198]                                       http://www.nrc.gov/reading-rm/
                                                  may not conduct or sponsor, and that a                                                                        adams.html. To begin the search, select
                                                  person is not required to respond to, a                 Design of Structures, Components,                     ‘‘ADAMS Public Documents’’ and then
                                                  collection of information unless it                     Equipment, and Systems, and Reactor                   select ‘‘Begin Web-based ADAMS
                                                  displays a currently valid OMB control                  Coolant System and Connected                          Search.’’ For problems with ADAMS,
                                                  number.                                                 Systems Guidance                                      please contact the NRC’s Public
                                                     The NRC published a Federal                                                                                Document Room (PDR) reference staff at
                                                                                                          AGENCY:  Nuclear Regulatory
                                                  Register notice with a 60-day comment                                                                         1–800–397–4209, 301–415–4737, or by
                                                                                                          Commission.
                                                  period on this information collection on                                                                      email to pdr.resource@nrc.gov. For the
                                                                                                          ACTION: Standard review plan-final                    convenience of the reader, the ADAMS
                                                  July 19, 2016 (81 FR 46972).
                                                                                                          section revision; issuance.                           accession numbers are provided in a
                                                     1. The title of the information
                                                  collection: NRC Form 314 Certification                  SUMMARY:   The U.S. Nuclear Regulatory                table in the ‘‘Availability of Documents’’
                                                  of Disposition of Material.                             Commission (NRC) is issuing a final                   section of this document.
                                                     2. OMB approval number: 3150–0028.                   revision to several sections in Chapter 3,               • NRC’s PDR: You may examine and
                                                     3. Type of submission: Extension.                    ‘‘Design of Structures, Components,                   purchase copies of public documents at
                                                     4. The form number if applicable:                    Equipment, and Systems Reactor                        the NRC’s PDR, Room O1–F21, One
                                                  NRC Form 314.                                           Coolant System and Connected                          White Flint North, 11555 Rockville
                                                     5. How often the collection is required              Systems,’’ and Chapter 5, ‘‘Reactor                   Pike, Rockville, Maryland 20852.
                                                  or requested: NRC Form 314 is                           Coolant System and Connected                          FOR FURTHER INFORMATION CONTACT:
                                                  submitted by materials licensee who                     Systems,’’ of NUREG–0800, ‘‘Standard                  Mark Notich, Office of New Reactors,
                                                  wishes to terminate its license. The form               Review Plan for the Review of Safety                  telephone: 301–415–3053; email:
                                                  provides information needed by the                      Analysis Reports for Nuclear Power                    Mark.Notich@nrc.gov; or Nishka
                                                  NRC to determine whether the licensee                   Plants: LWR Edition.’’ The revisions to               Devaser, Office of New Reactors,
                                                  has radioactive materials on hand which                 these standard review plan (SRP)                      telephone: 301–415–5196; email:
                                                  must be transferred or otherwise                        sections reflect no changes in staff                  Nishka.Devaser@nrc.gov; both staff at
                                                  disposed of prior to expiration or                      position; rather they clarify the original            U.S. Nuclear Regulatory Commission,
                                                  termination of the license.                             intent of these SRP sections using plain              Washington, DC 20555–0001.
                                                     6. Who will be required or asked to                  language throughout in accordance with                SUPPLEMENTARY INFORMATION:
                                                  respond: Respondents are firms,                         the NRC’s Plain Writing Action Plan.
                                                  institutions, and individual holding                    Additionally, these revisions reflect                 I. Background
                                                  NRC licenses to possess and use                         operating experience, lessons learned,                   A summary of the comments and the
mstockstill on DSK3G9T082PROD with NOTICES




                                                  radioactive materials who do not wish                   and the inclusion of updated guidance                 NRC staff’s disposition of the comments
                                                  who do not wish to renew those                          since the last revision, and address the              are available in a separate document,
                                                  licenses.                                               applicability of regulatory treatment of              ‘‘Response to Public Comments on Draft
                                                     7. The estimated number of annual                    non-safety systems where appropriate.                 Standard Review Plan Sections from
                                                  responses: 136 responses.                               The staff also deleted text in one of the             Chapters 3 and 5: Design of Structures,
                                                     8. The estimated number of annual                    Chapter 5 SRPs, as the text contained                 Components, Equipment, and Systems,
                                                  respondents: 136 respondents.                           guidance that was included in other                   and Reactor Coolant System and


                                             VerDate Sep<11>2014   18:33 Dec 22, 2016   Jkt 241001   PO 00000   Frm 00119   Fmt 4703   Sfmt 4703   E:\FR\FM\23DEN1.SGM   23DEN1


                                                                                          Federal Register / Vol. 81, No. 247 / Friday, December 23, 2016 / Notices                                                                                                 94431

                                                  Connected Systems’’ (ADAMS                                                   Backfit Rule or the issue finality                                           certain exclusions discussed in the next
                                                  Accession No. ML16088A345).                                                  provisions of 10 CFR part 52.                                                paragraph—were intended to apply to
                                                     The Office of New Reactors and the                                           2. The NRC staff has no intention to                                      every NRC action which substantially
                                                  Office of Nuclear Reactor Regulation are                                     impose the SRP positions on current                                          changes the expectations of current and
                                                  revising these sections from their                                           licensees and regulatory approvals                                           future applicants.
                                                  current revisions. Details of specific                                       either now or in the future.                                                    The exceptions to the general
                                                  changes in the proposed revisions are                                           The staff does not intend to impose or                                    principle are applicable whenever an
                                                  included at the end of each of the                                           apply the positions described in the SRP                                     applicant references a 10 CFR part 52
                                                  proposed sections.                                                           to existing (already issued) licenses and                                    license (e.g., an early site permit) and/
                                                     The changes to these SRP sections                                         regulatory approvals. Therefore, the                                         or NRC regulatory approval (e.g., a
                                                  reflect current NRC staff review                                             issuance of a final SRP—even if                                              design certification rule) with specified
                                                  methods and practices based on lessons                                       considered guidance that is within the                                       issue finality provisions. The staff does
                                                  learned from the NRC’s reviews of                                            purview of the issue finality provisions                                     not, at this time, intend to impose the
                                                  design certification and combined                                            in 10 CFR part 52—need not be                                                positions represented in the SRP in a
                                                  license applications completed since the                                     evaluated as if it were a backfit or as                                      manner that is inconsistent with any
                                                  last revision of this chapter.                                               being inconsistent with issue finality                                       issue finality provisions. If, in the
                                                  II. Backfitting and Finality Provisions                                      provisions. If, in the future, the staff                                     future, the staff seeks to impose a
                                                     Issuance of these revised SRP sections                                    seeks to impose a position in the SRP on                                     position in the SRP in a manner which
                                                  does not constitute backfitting as                                           holders of already issued licenses in a                                      does not provide issue finality as
                                                  defined in § 50.109 of title 10 of the                                       manner which does not provide issue                                          described in the applicable issue finality
                                                  Code of Federal Regulations (10 CFR),                                        finality as described in the applicable                                      provision, then the staff must address
                                                  ‘‘Backfitting,’’ (the Backfit Rule) or                                       issue finality provision, then the staff                                     the criteria for avoiding issue finality as
                                                  otherwise be inconsistent with the issue                                     must make the showing as set forth in                                        described in the applicable issue finality
                                                  finality provisions in 10 CFR part 52.                                       the Backfit Rule or address the criteria                                     provision.
                                                  The NRC’s position is based upon the                                         for avoiding issue finality as described
                                                                                                                                                                                                            III. Congressional Review Act
                                                  following considerations.                                                    in the applicable issue finality
                                                     1. The SRP positions do not constitute                                    provision.                                                                      This action is a rule as defined in the
                                                  backfitting, inasmuch as the SRP is                                             3. Backfitting and issue finality do                                      Congressional Review Act (5 U.S.C.
                                                  internal guidance directed at the NRC                                        not—with limited exceptions not                                              801–808). However, the Office of
                                                  staff with respect to their regulatory                                       applicable here—protect current or                                           Management and Budget has not found
                                                  responsibilities.                                                            future applicants.                                                           it to be a major rule as defined in the
                                                     The SRP provides guidance to the                                             Applicants and potential applicants                                       Congressional Review Act.
                                                  staff on how to review an application for                                    are not, with certain exceptions,                                            IV. Availability of Documents
                                                  the NRC’s regulatory approval in the                                         protected by either the Backfit Rule or
                                                  form of licensing. Changes in internal                                       any issue finality provisions under 10                                         The ADAMS accession numbers
                                                  staff guidance are not matters for which                                     CFR part 52. This is because neither the                                     revised sections are available in
                                                  either nuclear power plant applicants or                                     Backfit Rule nor the issue finality                                          ADAMS under the accession numbers
                                                  licensees are protected under either the                                     provisions under 10 CFR part 52—with                                         in the table below.

                                                                                                                                                                                                                                                                 ADAMS
                                                                                                                                              Document                                                                                                        accession No.*

                                                  Section 3.6.2, ‘‘Determination of Rupture Locations and Dynamic Effects Associated with the Postulated Rupture of Piping,’’ Re-
                                                    vision 3 .............................................................................................................................................................................................    ML16088A041
                                                  Section 3.9.1, ‘‘Special Topics for Mechanical Components,’’ Revision 4 .........................................................................................                                           ML16088A068
                                                  Section 3.10, ‘‘Seismic and Dynamic Qualification of Mechanical and Electrical Equipment,’’ Revision 4 .......................................                                                              ML16088A101
                                                  Section 5.2.1.1, ‘‘Compliance with the Codes and Standards Rule, 10 CFR 50.55a,’’ Revision 4 ...................................................                                                            ML16088A127
                                                  Section 5.2.1.2, ‘‘Applicable Code Cases,’’ Revision 4 ......................................................................................................................                               ML16088A219
                                                  Branch Technical Position 3–4, ‘‘Postulated Rupture Locations in Fluid System Piping Inside and Outside Containment,’’ Revi-
                                                    sion 3 ................................................................................................................................................................................................   ML16085A315
                                                     * See documents in the package at ADAMS Accession Number ML16083A387 to see changes made since last revision.


                                                     Dated at Rockville, Maryland, this 19th day                               NUCLEAR REGULATORY                                                           in an Independent Spent Fuel Storage
                                                  of December, 2016.                                                           COMMISSION                                                                   Installation.’’ This proposed revision
                                                     For the Nuclear Regulatory Commission.                                                                                                                 (Revision 2) to RG 3.54 provides
                                                                                                                               [NRC–2016–0268]
                                                  Joseph Colaccino,                                                                                                                                         methods acceptable to the Nuclear
                                                  Chief, New Reactor Rulemaking and                                            Spent Fuel Heat Generation in an                                             Regulatory Commission (NRC) staff for
                                                  Guidance Branch, Division of Engineering,                                    Independent Spent Fuel Storage                                               calculating spent nuclear fuel heat
                                                  Infrastructure, and Advanced Reactors, Office                                Installation                                                                 generation rates for use for an
                                                  of New Reactors.                                                                                                                                          independent spent fuel storage
                                                  [FR Doc. 2016–30908 Filed 12–22–16; 8:45 am]
                                                                                                                               AGENCY: Nuclear Regulatory                                                   installation (ISFSI).
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                               Commission.
                                                  BILLING CODE 7590–01–P
                                                                                                                               ACTION: Draft regulatory guide; request
                                                                                                                                                                                                            DATES: Submit comments by February
                                                                                                                               for comment.                                                                 21, 2017. Comments received after this
                                                                                                                                                                                                            date will be considered if it is practical
                                                                                                                               SUMMARY: The U.S. Nuclear Regulatory                                         to do so, but the NRC is able to ensure
                                                                                                                               Commission (NRC) is issuing for public                                       consideration only for comments
                                                                                                                               comment draft regulatory guide (DG),                                         received on or before this date.
                                                                                                                               DG–3050, ‘‘Spent Fuel Heat Generation                                        Although a time limit is given,


                                             VerDate Sep<11>2014          18:33 Dec 22, 2016         Jkt 241001       PO 00000        Frm 00120        Fmt 4703       Sfmt 4703       E:\FR\FM\23DEN1.SGM               23DEN1



Document Created: 2016-12-23 12:29:48
Document Modified: 2016-12-23 12:29:48
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionStandard review plan-final section revision; issuance.
DatesThe effective date of this Standard Review Plan (SRP) update is January 23, 2017.
ContactMark Notich, Office of New Reactors, telephone: 301-415-3053; email: [email protected]; or Nishka Devaser, Office of New Reactors, telephone: 301-415-5196; email: [email protected]; both staff at U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation81 FR 94430 

2025 Federal Register | Disclaimer | Privacy Policy