82_FR_47394 82 FR 47199 - Dominion Energy Services, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

82 FR 47199 - Dominion Energy Services, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 195 (October 11, 2017)

Page Range47199-47200
FR Document2017-21874

Federal Register, Volume 82 Issue 195 (Wednesday, October 11, 2017)
[Federal Register Volume 82, Number 195 (Wednesday, October 11, 2017)]
[Notices]
[Pages 47199-47200]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-21874]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14854-000]


Dominion Energy Services, Inc.; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On September 6, 2017, Dominion Energy Services, Inc., filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Tazewell Hybrid

[[Page 47200]]

Energy Center Project to be located approximately 1.0 mile southwest of 
the Town of Bluefield in Tazewell County, Virginia. The sole purpose of 
a preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of one of the following two 
alternatives:
    Alternative 1--(1) a new 3,263-foot-long, 380-foot-high concrete-
face rockfill dam for the upper reservoir with a 150-foot-long 
concrete-lined emergency spillway; (2) a new 1,723-foot-long, 288-foot-
high concrete-face rockfill dam for the lower reservoir with a 150-
foot-long concrete-lined emergency spillway; (3) a new upper reservoir 
with a surface area of 112 acres and a storage capacity of 8,173 acre-
feet at a surface elevation of 3,830 feet above mean sea level (msl); 
(4) a new lower reservoir with a surface area of 96 acres and a storage 
capacity of 8,173 acre-feet at a surface elevation of 3,238 feet msl; 
(5) a new 9.5-mile-long water source conveyance from the proposed water 
source to the project; (6) a new 5,235-foot-long penstock connecting 
the upper and lower reservoirs; (7) a new 250-foot-long, 100-foot-wide, 
150-foot-high underground reinforced-concrete powerhouse containing two 
pump-turbine generator units with a total rated capacity of 446 
megawatts (MW) and a rated gross hydraulic head of 621 feet; (8) a new 
switchyard/substation that ties directly into an existing 765-kilovolt 
(kV) transmission line; and (9) appurtenant facilities.
    Alternative 2--(1) a new 3,263-foot-long, 380-foot-high concrete-
face rockfill dam for the upper reservoir with a 150-foot-long 
concrete-lined emergency spillway; (2) a new 1,680-foot-long, 257-foot-
high concrete-face rockfill dam for the lower reservoir with a 150-
foot-long concrete-lined emergency spillway; (3) a new upper reservoir 
with a surface area of 112 acres and a storage capacity of 11,135 acre-
feet at a surface elevation of 3,830 feet msl; (4) a new lower 
reservoir with a surface area of 144 acres and a storage capacity of 
11,135 acre-feet at a surface elevation of 2,937 feet msl; (5) a new 
10.5-mile-long water source conveyance from the proposed water source 
to the project; (6) a new 4,965-foot-long penstock connecting the upper 
and lower reservoirs; (7) a new 350-foot-long, 100-foot-wide, 150-foot-
high underground reinforced-concrete powerhouse containing three pump-
turbine generator units with a total rated capacity of 870 MW and a 
rated gross hydraulic head of 887 feet; (8) a new switchyard/substation 
that ties directly into an existing 765-kV transmission line; and (9) 
appurtenant facilities.
    Under both alternatives, mine water would serve as the water source 
for the initial fill and makeup water.
    The proposed project would have an annual generation of 1,302 
gigawatt-hours (GWh) and 2,540 GWh for alternatives 1 and 2, 
respectively.
    Applicant Contacts: Michael Regulinski, Dominion Energy Virginia, 
120 Tredegar Street, RS-2, Richmond, Virginia 23219; phone: 804-819-
2794, and Michael Swiger, Van Ness Feldman, LLP, 1050 Thomas Jefferson 
Street NW., Washington, DC 20007; phone: 202-298-1891.
    FERC Contact: Woohee Choi; phone: (202) 502-6336.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14854-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14854) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: September 29, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-21874 Filed 10-10-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices                                                47199

                                                       g. Filed Pursuant to: Section 23(b)(1)               or (4) would be located on a non-                       Dated: October 4, 2017.
                                                    of the Federal Power Act, 16 U.S.C.                     navigable stream over which Congress                  Nathaniel J. Davis, Sr.,
                                                    817(b) (2012).                                          has Commerce Clause jurisdiction and                  Deputy Secretary.
                                                       h. Applicant Contact: Cole Rhoten,                   would be constructed or enlarged after                [FR Doc. 2017–21840 Filed 10–10–17; 8:45 am]
                                                    677 Milford Hills Drive, Milford, OH                    1935.                                                 BILLING CODE 6717–01–P
                                                    45150, telephone: (317) 945–3936;                          l. Locations of the Application: This
                                                    email: C.Rhoten@outlook.com.                            filing may be viewed on the
                                                       i. FERC Contact: Any questions on                    Commission’s Web site at http://                      DEPARTMENT OF ENERGY
                                                    this notice should be addressed to                      www.ferc.gov/docs-filing/elibrary.asp.
                                                    Jennifer Polardino, (202) 502–6437, or                  Enter the docket number excluding the                 Federal Energy Regulatory
                                                    email: Jennifer.Polardino@ferc.gov.                     last three digits in the docket number                Commission
                                                       j. Deadline for filing comments,                     field to access the document. You may
                                                    protests, and motions to intervene is: 30               also register online at http://                       [Docket No. EL17–93–000]
                                                    Days from the issuance date of this                     www.ferc.gov/docs-filing/
                                                    notice by the Commission.                                                                                     System Energy Resources, Inc.; Notice
                                                                                                            esubscription.asp to be notified via
                                                       The Commission strongly encourages                                                                         of Institution of Section 206
                                                                                                            email of new filings and issuances
                                                    electronic filing. Please file comments,                                                                      Proceeding and Refund Effective Date
                                                                                                            related to this or other pending projects.
                                                    protests, and motions to intervene using                For assistance, call 1–866–208–3676 or                   On September 29, 2017, the
                                                    the Commission’s eFiling system at                      email FERCOnlineSupport@ferc.gov, for                 Commission issued an order in Docket
                                                    http://www.ferc.gov/docs-filing/                        TTY, call (202) 502–8659. A copy is also              No. EL17–93–000, pursuant to section
                                                    efiling.asp. Commenters can submit                      available for inspection and                          206 of the Federal Power Act (FPA), 16
                                                    brief comments up to 6,000 characters,                  reproduction at the address in item (h)               U.S.C. 824e (2012), instituting an
                                                    without prior registration, using the                   above and in the Commission’s Public                  investigation into whether the proposed
                                                    eComment system at http://                              Reference Room located at 888 First                   rate decreases of System Energy
                                                    www.ferc.gov/docs-filing/                               Street NE., Room 2A, Washington, DC                   Resources, Inc. may be unjust and
                                                    ecomment.asp. You must include your                     20426, or by calling (202) 502–8371.                  unreasonable. System Energy Resources,
                                                    name and contact information at the end                    m. Individuals desiring to be included             Inc., 160 FERC ¶61,140 (2017).
                                                    of your comments. For assistance,                       on the Commission’s mailing list should                  The refund effective date in Docket
                                                    please contact FERC Online Support at                   so indicate by writing to the Secretary               No. EL17–93–000, established pursuant
                                                    FERCOnlineSupport@ferc.gov, (866)                       of the Commission.                                    to section 206(b) of the FPA, will be the
                                                    208–3676 (toll free), or (202) 502–8659                    n. Comments, Protests, or Motions to               date of publication of this notice in the
                                                    (TTY). In lieu of electronic filing, please             Intervene: Anyone may submit                          Federal Register.
                                                    send a paper copy to: Secretary, Federal                comments, a protest, or a motion to                      Any interested person desiring to be
                                                    Energy Regulatory Commission, 888                       intervene in accordance with the                      heard in Docket No. EL17–93–000 must
                                                    First Street, NE., Washington, DC 20426.                requirements of Rules of Practice and
                                                                                                                                                                  file a notice of intervention or motion to
                                                    The first page of any filing should                     Procedure, 18 CFR 385.210, .211, and
                                                                                                                                                                  intervene, as appropriate, with the
                                                    include docket number DI17–9–000.                       .214. In determining the appropriate
                                                       k. Description of Project: The                                                                             Federal Energy Regulatory Commission,
                                                                                                            action to take, the Commission will
                                                    proposed run-of-river William H.                                                                              888 First Street NE., Washington, DC
                                                                                                            consider all protests or other comments
                                                    Harsha Lake Hydroelectric Project                                                                             20426, in accordance with Rule 214 of
                                                                                                            filed, but only those who file a motion
                                                    would consist of: (1) An existing                                                                             the Commission’s Rules of Practice and
                                                                                                            to intervene in accordance with the
                                                    William H. Harsha Dam; (2) an existing                                                                        Procedure, 18 CFR 385.214 (2017),
                                                                                                            Commission’s Rules may become a
                                                    conduit; (3) a 50–170 foot long conduit                                                                       within 21 days of the date of issuance
                                                                                                            party to the proceeding. Any comments,
                                                    extension with an end gate; (4) a                                                                             of the order.
                                                                                                            protests, or motions to intervene must
                                                    powerhouse built into the existing                      be received on or before the specified                  Dated: September 29, 2017.
                                                    spillway structure with a Pelton-turbine                comment date for the particular                       Nathaniel J. Davis, Sr.,
                                                    generating unit with a generating                       application.                                          Deputy Secretary.
                                                    capacity of one megawatt; (5) a                            o. Filing and Service of Responsive                [FR Doc. 2017–21871 Filed 10–10–17; 8:45 am]
                                                    transmission line connecting the                        Documents: All filings must bear in all               BILLING CODE 6717–01–P
                                                    generating units with Cincinnati Gas                    capital letters the title COMMENTS,
                                                    and Electric Company’s electric                         PROTESTS, and MOTIONS TO
                                                    distribution system; and (6) appurtenant                INTERVENE, as applicable, and the                     DEPARTMENT OF ENERGY
                                                    facilities. The area of the proposed                    Docket Number of the particular
                                                    project is part of the East Fork State Park             application to which the filing refers. A             Federal Energy Regulatory
                                                    and the dam is under the jurisdiction of                copy of any Motion to Intervene must                  Commission
                                                    the U.S. Corps of Engineers.                            also be served upon each representative
                                                       When a Declaration of Intention is                                                                         [Project No. 14854–000]
                                                                                                            of the Applicant specified in the
                                                    filed with the Federal Energy Regulatory                particular application.                               Dominion Energy Services, Inc.; Notice
                                                    Commission, the Federal Power Act                          p. Agency Comments: Federal, state,                of Preliminary Permit Application
                                                    requires the Commission to investigate                  and local agencies are invited to file                Accepted for Filing and Soliciting
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    and determine if the project would                      comments on the described application.                Comments, Motions To Intervene, and
                                                    affect the interests of interstate or                   A copy of the application may be                      Competing Applications
                                                    foreign commerce. The Commission also                   obtained by agencies directly from the
                                                    determines whether or not the project:                  Applicant. If an agency does not file                   On September 6, 2017, Dominion
                                                    (1) Would be located on a navigable                     comments within the time specified for                Energy Services, Inc., filed an
                                                    waterway; (2) would occupy public                       filing comments, it will be presumed to               application for a preliminary permit,
                                                    lands or reservations of the United                     have no comments. One copy of an                      pursuant to section 4(f) of the Federal
                                                    States; (3) would utilize surplus water                 agency’s comments must also be sent to                Power Act (FPA), proposing to study the
                                                    or water power from a government dam;                   the Applicant’s representatives.                      feasibility of the Tazewell Hybrid


                                               VerDate Sep<11>2014   17:58 Oct 10, 2017   Jkt 244001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\11OCN1.SGM   11OCN1


                                                    47200                     Federal Register / Vol. 82, No. 195 / Wednesday, October 11, 2017 / Notices

                                                    Energy Center Project to be located                     turbine generator units with a total rated            DEPARTMENT OF ENERGY
                                                    approximately 1.0 mile southwest of the                 capacity of 870 MW and a rated gross
                                                    Town of Bluefield in Tazewell County,                   hydraulic head of 887 feet; (8) a new                 Federal Energy Regulatory
                                                    Virginia. The sole purpose of a                         switchyard/substation that ties directly              Commission
                                                    preliminary permit, if issued, is to grant              into an existing 765-kV transmission                  [Docket No. IS17–522–000]
                                                    the permit holder priority to file a                    line; and (9) appurtenant facilities.
                                                    license application during the permit                      Under both alternatives, mine water                Colonial Pipeline Company; Notice of
                                                    term. A preliminary permit does not                     would serve as the water source for the               Technical Conference
                                                    authorize the permit holder to perform                  initial fill and makeup water.
                                                    any land-disturbing activities or                          The proposed project would have an                   The Commission’s September 7, 2017
                                                    otherwise enter upon lands or waters                    annual generation of 1,302 gigawatt-                  order in the above-captioned
                                                    owned by others without the owners’                     hours (GWh) and 2,540 GWh for                         proceeding 1 directed that a technical
                                                    express permission.                                     alternatives 1 and 2, respectively.                   conference be held to address the effect
                                                       The proposed project would consist of                                                                      of the tariff changes proposed by
                                                                                                               Applicant Contacts: Michael
                                                    one of the following two alternatives:                                                                        Colonial Pipeline Company in its June
                                                                                                            Regulinski, Dominion Energy Virginia,
                                                       Alternative 1—(1) a new 3,263-foot-                                                                        23, 2017 filing in this docket.
                                                                                                            120 Tredegar Street, RS–2, Richmond,
                                                    long, 380-foot-high concrete-face rockfill                                                                      Take notice that a technical
                                                                                                            Virginia 23219; phone: 804–819–2794,
                                                    dam for the upper reservoir with a 150-                                                                       conference will be held on Wednesday,
                                                                                                            and Michael Swiger, Van Ness Feldman,
                                                    foot-long concrete-lined emergency                                                                            October 25, 2017 at 9:00 a.m., in a room
                                                                                                            LLP, 1050 Thomas Jefferson Street NW.,
                                                    spillway; (2) a new 1,723-foot-long, 288-                                                                     to be designated at the offices of the
                                                    foot-high concrete-face rockfill dam for                Washington, DC 20007; phone: 202–
                                                                                                                                                                  Federal Energy Regulatory Commission,
                                                    the lower reservoir with a 150-foot-long                298–1891.
                                                                                                                                                                  888 First Street NE., Washington, DC
                                                    concrete-lined emergency spillway; (3) a                   FERC Contact: Woohee Choi; phone:                  20426.
                                                    new upper reservoir with a surface area                 (202) 502–6336.                                         FERC conferences are accessible
                                                    of 112 acres and a storage capacity of                     Deadline for filing comments, motions              under section 508 of the Rehabilitation
                                                    8,173 acre-feet at a surface elevation of               to intervene, competing applications                  Act of 1973. For accessibility
                                                    3,830 feet above mean sea level (msl);                  (without notices of intent), or notices of            accommodations please send an email
                                                    (4) a new lower reservoir with a surface                intent to file competing applications: 60             to accessibility@ferc.gov or call toll free
                                                    area of 96 acres and a storage capacity                 days from the issuance of this notice.                (866) 208–3372 (voice) or (202) 502–
                                                    of 8,173 acre-feet at a surface elevation               Competing applications and notices of                 8659 (TTY), or send a fax to (202) 208–
                                                    of 3,238 feet msl; (5) a new 9.5-mile-                  intent must meet the requirements of 18               2106 with the required
                                                    long water source conveyance from the                   CFR 4.36.                                             accommodations.
                                                    proposed water source to the project; (6)                  The Commission strongly encourages                   All interested persons and staff are
                                                    a new 5,235-foot-long penstock                          electronic filing. Please file comments,              permitted to attend. For further
                                                    connecting the upper and lower                          motions to intervene, notices of intent,              information please contact David
                                                    reservoirs; (7) a new 250-foot-long, 100-               and competing applications using the                  Faerberg at (202) 502–8275 or email
                                                    foot-wide, 150-foot-high underground                    Commission’s eFiling system at http://                David Faerberg at David.Faerberg@
                                                    reinforced-concrete powerhouse                          www.ferc.gov/docs-filing/efiling.asp.                 ferc.gov.
                                                    containing two pump-turbine generator                   Commenters can submit brief comments
                                                                                                                                                                    Dated: September 29, 2017.
                                                    units with a total rated capacity of 446                up to 6,000 characters, without prior
                                                    megawatts (MW) and a rated gross                        registration, using the eComment system               Nathaniel J. Davis, Sr.,
                                                    hydraulic head of 621 feet; (8) a new                   at http://www.ferc.gov/docs-filing/                   Deputy Secretary.
                                                    switchyard/substation that ties directly                ecomment.asp. You must include your                   [FR Doc. 2017–21873 Filed 10–10–17; 8:45 am]
                                                    into an existing 765-kilovolt (kV)                      name and contact information at the end               BILLING CODE 6717–01–P
                                                    transmission line; and (9) appurtenant                  of your comments. For assistance,
                                                    facilities.                                             please contact FERC Online Support at
                                                       Alternative 2—(1) a new 3,263-foot-                  FERCOnlineSupport@ferc.gov, (866)                     DEPARTMENT OF ENERGY
                                                    long, 380-foot-high concrete-face rockfill              208–3676 (toll free), or (202) 502–8659
                                                    dam for the upper reservoir with a 150-                 (TTY). In lieu of electronic filing, please           Federal Energy Regulatory
                                                    foot-long concrete-lined emergency                      send a paper copy to: Secretary, Federal              Commission
                                                    spillway; (2) a new 1,680-foot-long, 257-               Energy Regulatory Commission, 888                     Combined Notice of Filings
                                                    foot-high concrete-face rockfill dam for                First Street NE., Washington, DC 20426.
                                                    the lower reservoir with a 150-foot-long                The first page of any filing should                     Take notice that the Commission has
                                                    concrete-lined emergency spillway; (3) a                include docket number P–14854–000.                    received the following Natural Gas
                                                    new upper reservoir with a surface area                    More information about this project,               Pipeline Rate and Refund Report filings:
                                                    of 112 acres and a storage capacity of                  including a copy of the application, can
                                                    11,135 acre-feet at a surface elevation of                                                                    Filings Instituting Proceedings
                                                                                                            be viewed or printed on the ‘‘eLibrary’’
                                                    3,830 feet msl; (4) a new lower reservoir               link of the Commission’s Web site at                    Docket Numbers: RP17–1101–001.
                                                    with a surface area of 144 acres and a                  http://www.ferc.gov/docs-filing/                        Applicants: Texas Gas Transmission,
                                                    storage capacity of 11,135 acre-feet at a               elibrary.asp. Enter the docket number                 LLC.
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    surface elevation of 2,937 feet msl; (5)                (P–14854) in the docket number field to                 Description: Tariff Amendment:
                                                    a new 10.5-mile-long water source                       access the document. For assistance,                  Amendment to Filing in Docket No.
                                                    conveyance from the proposed water                      contact FERC Online Support.                          RP17–1101–000 to be effective
                                                    source to the project; (6) a new 4,965-                                                                       10/1/2017.
                                                    foot-long penstock connecting the upper                   Dated: September 29, 2017.
                                                                                                            Nathaniel J. Davis, Sr.,
                                                                                                                                                                    Filed Date: 9/28/17.
                                                    and lower reservoirs; (7) a new 350-foot-                                                                       Accession Number: 20170928–5128.
                                                    long, 100-foot-wide, 150-foot-high                      Deputy Secretary.
                                                    underground reinforced-concrete                         [FR Doc. 2017–21874 Filed 10–10–17; 8:45 am]            1 Colonial Pipeline Company, 160 FERC ¶ 61,051

                                                    powerhouse containing three pump-                       BILLING CODE 6717–01–P                                (2017).



                                               VerDate Sep<11>2014   17:58 Oct 10, 2017   Jkt 244001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\11OCN1.SGM   11OCN1



Document Created: 2018-10-25 10:00:09
Document Modified: 2018-10-25 10:00:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 47199 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR