82_FR_56823 82 FR 56595 - City of Kaukauna, Wisconsin; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

82 FR 56595 - City of Kaukauna, Wisconsin; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 228 (November 29, 2017)

Page Range56595-56596
FR Document2017-25725

Federal Register, Volume 82 Issue 228 (Wednesday, November 29, 2017)
[Federal Register Volume 82, Number 228 (Wednesday, November 29, 2017)]
[Notices]
[Pages 56595-56596]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-25725]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1510-018]


City of Kaukauna, Wisconsin; Notice of Application Accepted for 
Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, Terms 
and Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 1510-018.
    c. Date filed: March 24, 2017.
    d. Applicant: City of Kaukauna, Wisconsin (Kaukauna).
    e. Name of Project: Kaukauna Project.
    f. Location: On the Fox River in the City of Kaukauna, Outagamie 
County, Wisconsin. There are no federal or tribal lands within the 
project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Mike Pedersen, Kaukauna Utilities, 777 
Island Street, P.O. Box 1777, Kaukauna, WI 54130-7077; (920) 766-5721.
    i. FERC Contact: Erin Kimsey, (202) 502-8621 or 
[email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, terms and conditions, and prescriptions: 60 days from 
the issuance date of this notice; reply comments are due 105 days from 
the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests, comments, recommendations, terms and 
conditions, and prescriptions using the Commission's eFiling system at 
http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-1510-018.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The existing Kaukauna City Plant Hydroelectric Project consists 
of: (1) An approximately 3,842-foot-long dam that includes: (a) A 930-
foot-long, 14-foot-high masonry retaining wall section (left forebay 
dam) with a 4-foot-wide trash sluice; (b) a 92-foot-long, 25-foot-high 
concrete intake and powerhouse section; (c) a 292-foot-long, 26- to 30-
foot-high masonry and concrete retaining wall section (right forebay 
dam); (d) a 34-foot-long, 11-foot-high trash sluice; (e) a 66-foot-
long, 18-foot-high gated spillway section with two 30-foot-wide, 8.8-
foot-high spillway gates; and (f) a 2,428-foot-long, 0.5- to 10-foot-
high concrete and natural rock spillway section; (2) a 19-acre,1.5-
mile-long impoundment with a normal maximum elevation of 629.0 feet 
above mean sea level (msl); (3) a 25-foot-high, 88-foot-wide intake 
structure with seven 11-foot-high, 7-foot-wide head gates and a 
continuous 25-foot-high, 88-foot-wide trashrack with 5-inch clear-bar 
spacing; (4) a 92-foot-long, 47.5-foot-high concrete and brick 
powerhouse containing two 2.4-megawatt turbine-generator units for a 
total installed capacity of 4.8 megawatts; (5) a 440-foot-wide, 49-
foot-deep, 1,200-foot-long excavated tailrace; (6) two 68-foot-long, 
2.4-kilovolt generator leads that connect the turbine-generator units 
to the licensee's local distribution system; and (7) appurtenant 
facilities. Kaukauna operates the project in a run-of-river mode with 
an average annual generation of approximately 29,704 megawatt-hours.
    Kaukauna is not proposing any new project facilities, and proposes 
to continue operating the project in a run-of-river mode, with a 
minimum impoundment elevation of 628.5 feet msl (0.5 foot less than the 
spillway crest elevation). Kaukauna also proposes to develop resource 
plans for mitigating the effects of reservoir drawdowns, woody debris 
removal, and erosion on aquatic resources; and mitigating the spread of 
invasive species.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at

[[Page 56596]]

http://www.ferc.gov using the eLibrary link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC Online Support. A copy is 
also available for inspection and reproduction at the address in item h 
above.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title PROTEST, 
MOTION TO INTERVENE, COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS 
AND CONDITIONS, or PRESCRIPTIONS; (2) set forth in the heading the name 
of the applicant and the project number of the application to which the 
filing responds; (3) furnish the name, address, and telephone number of 
the person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. A copy of any protest or motion to intervene must 
be served upon each representative of the applicant specified in the 
particular application. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

    Dated: November 21, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-25725 Filed 11-28-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                         Federal Register / Vol. 82, No. 228 / Wednesday, November 29, 2017 / Notices                                            56595

                                                record (eLibrary) for this proceeding, or               DEPARTMENT OF ENERGY                                  with the Commission to serve a copy of
                                                issue a Notice of Schedule for                                                                                that document on each person on the
                                                Environmental Review. If a Notice of                    Federal Energy Regulatory                             official service list for the project.
                                                Schedule for Environmental Review is                    Commission                                            Further, if an intervenor files comments
                                                issued, it will indicate, among other                   [Project No. 1510–018]                                or documents with the Commission
                                                milestones, the anticipated date for the                                                                      relating to the merits of an issue that
                                                Commission staff’s issuance of the final                City of Kaukauna, Wisconsin; Notice of                may affect the responsibilities of a
                                                environmental impact statement (FEIS)                   Application Accepted for Filing,                      particular resource agency, they must
                                                or EA for this proposal. The filing of the              Soliciting Motions To Intervene and                   also serve a copy of the document on
                                                                                                        Protests, Ready for Environmental                     that resource agency.
                                                EA in the Commission’s public record
                                                                                                        Analysis, and Soliciting Comments,                       k. This application has been accepted
                                                for this proceeding or the issuance of a                                                                      for filing and is now ready for
                                                Notice of Schedule for Environmental                    Recommendations, Terms and
                                                                                                        Conditions, and Prescriptions                         environmental analysis.
                                                Review will serve to notify federal and                                                                          l. The existing Kaukauna City Plant
                                                state agencies of the timing for the                       Take notice that the following                     Hydroelectric Project consists of: (1) An
                                                completion of all necessary reviews, and                hydroelectric application has been filed              approximately 3,842-foot-long dam that
                                                the subsequent need to complete all                     with the Commission and is available                  includes: (a) A 930-foot-long, 14-foot-
                                                federal authorizations within 90 days of                for public inspection.                                high masonry retaining wall section (left
                                                the date of issuance of the Commission                     a. Type of Application: New Major                  forebay dam) with a 4-foot-wide trash
                                                staff’s FEIS or EA.                                     License.                                              sluice; (b) a 92-foot-long, 25-foot-high
                                                   Persons who wish to comment only                        b. Project No.: 1510–018.                          concrete intake and powerhouse
                                                                                                           c. Date filed: March 24, 2017.                     section; (c) a 292-foot-long, 26- to 30-
                                                on the environmental review of this                        d. Applicant: City of Kaukauna,                    foot-high masonry and concrete
                                                project should submit an original and                   Wisconsin (Kaukauna).                                 retaining wall section (right forebay
                                                two copies of their comments to the                        e. Name of Project: Kaukauna Project.              dam); (d) a 34-foot-long, 11-foot-high
                                                Secretary of the Commission.                               f. Location: On the Fox River in the               trash sluice; (e) a 66-foot-long, 18-foot-
                                                Environmental commenters will be                        City of Kaukauna, Outagamie County,                   high gated spillway section with two 30-
                                                placed on the Commission’s                              Wisconsin. There are no federal or tribal             foot-wide, 8.8-foot-high spillway gates;
                                                environmental mailing list, will receive                lands within the project boundary.                    and (f) a 2,428-foot-long, 0.5- to 10-foot-
                                                copies of the environmental documents,                     g. Filed Pursuant to: Federal Power                high concrete and natural rock spillway
                                                and will be notified of meetings                        Act 16 U.S.C. 791(a)–825(r).                          section; (2) a 19-acre,1.5-mile-long
                                                associated with the Commission’s                           h. Applicant Contact: Mr. Mike                     impoundment with a normal maximum
                                                environmental review process.                           Pedersen, Kaukauna Utilities, 777 Island              elevation of 629.0 feet above mean sea
                                                Environmental commenters will not be                    Street, P.O. Box 1777, Kaukauna, WI                   level (msl); (3) a 25-foot-high, 88-foot-
                                                required to serve copies of filed                       54130–7077; (920) 766–5721.                           wide intake structure with seven 11-
                                                documents on all other parties.                            i. FERC Contact: Erin Kimsey, (202)                foot-high, 7-foot-wide head gates and a
                                                However, the non-party commenter will                   502–8621 or erin.kimsey@ferc.gov.                     continuous 25-foot-high, 88-foot-wide
                                                not receive copies of all documents filed                  j. Deadline for filing motions to                  trashrack with 5-inch clear-bar spacing;
                                                                                                        intervene and protests, comments,                     (4) a 92-foot-long, 47.5-foot-high
                                                by other parties or issued by the
                                                                                                        recommendations, terms and                            concrete and brick powerhouse
                                                Commission (except for the mailing of
                                                                                                        conditions, and prescriptions: 60 days                containing two 2.4-megawatt turbine-
                                                environmental documents issued by the
                                                                                                        from the issuance date of this notice;                generator units for a total installed
                                                Commission) and will not have the right                 reply comments are due 105 days from                  capacity of 4.8 megawatts; (5) a 440-
                                                to seek court review of the                             the issuance date of this notice.                     foot-wide, 49-foot-deep, 1,200-foot-long
                                                Commission’s final order.                                  The Commission strongly encourages                 excavated tailrace; (6) two 68-foot-long,
                                                   The Commission strongly encourages                   electronic filing. Please file motions to             2.4-kilovolt generator leads that connect
                                                electronic filings of comments, protests                intervene and protests, comments,                     the turbine-generator units to the
                                                and interventions in lieu of paper using                recommendations, terms and                            licensee’s local distribution system; and
                                                the eFiling link at http://www.ferc.gov.                conditions, and prescriptions using the               (7) appurtenant facilities. Kaukauna
                                                Persons unable to file electronically                   Commission’s eFiling system at http://                operates the project in a run-of-river
                                                should submit an original and 5 copies                  www.ferc.gov/docs-filing/efiling.asp.                 mode with an average annual generation
                                                of the protest or intervention to the                   Commenters can submit brief comments                  of approximately 29,704 megawatt-
                                                Federal Energy Regulatory Commission,                   up to 6,000 characters, without prior                 hours.
                                                888 First Street NE., Washington, DC                    registration, using the eComment system                  Kaukauna is not proposing any new
                                                20426.                                                  at http://www.ferc.gov/docs-filing/                   project facilities, and proposes to
                                                                                                        ecomment.asp. You must include your                   continue operating the project in a run-
                                                   Comment Date: 5:00 p.m. Eastern                      name and contact information at the end               of-river mode, with a minimum
                                                Time on January 22, 2018.                               of your comments. For assistance,                     impoundment elevation of 628.5 feet
                                                  Dated: November 22, 2017.                             please contact FERC Online Support at                 msl (0.5 foot less than the spillway crest
                                                Nathaniel J. Davis, Sr.,                                FERCOnlineSupport@ferc.gov, (866)                     elevation). Kaukauna also proposes to
                                                                                                        208–3676 (toll free), or (202) 502–8659               develop resource plans for mitigating
                                                Deputy Secretary.
pmangrum on DSK3GDR082PROD with NOTICES1




                                                                                                        (TTY). In lieu of electronic filing, please           the effects of reservoir drawdowns,
                                                [FR Doc. 2017–25756 Filed 11–28–17; 8:45 am]
                                                                                                        send a paper copy to: Secretary, Federal              woody debris removal, and erosion on
                                                BILLING CODE 6717–01–P                                  Energy Regulatory Commission, 888                     aquatic resources; and mitigating the
                                                                                                        First Street NE., Washington, DC 20426.               spread of invasive species.
                                                                                                        The first page of any filing should                      m. A copy of the application is
                                                                                                        include docket number P–1510–018.                     available for review at the Commission
                                                                                                           The Commission’s Rules of Practice                 in the Public Reference Room or may be
                                                                                                        require all intervenors filing documents              viewed on the Commission’s Web site at


                                           VerDate Sep<11>2014   15:19 Nov 28, 2017   Jkt 241001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\29NON1.SGM   29NON1


                                                56596                   Federal Register / Vol. 82, No. 228 / Wednesday, November 29, 2017 / Notices

                                                http://www.ferc.gov using the eLibrary                  evidence of waiver of water quality                     Dated: November 22, 2017.
                                                link. Enter the docket number excluding                 certification.                                        Nathaniel J. Davis, Sr.,
                                                the last three digits in the docket                       Dated: November 21, 2017.                           Deputy Secretary.
                                                number field to access the document.                    Kimberly D. Bose,                                     [FR Doc. 2017–25758 Filed 11–28–17; 8:45 am]
                                                For assistance, contact FERC Online                                                                           BILLING CODE 6717–01–P
                                                                                                        Secretary.
                                                Support. A copy is also available for
                                                                                                        [FR Doc. 2017–25725 Filed 11–28–17; 8:45 am]
                                                inspection and reproduction at the
                                                address in item h above.                                BILLING CODE 6717–01–P
                                                                                                                                                              DEPARTMENT OF ENERGY
                                                   n. Anyone may submit comments, a
                                                protest, or a motion to intervene in                                                                          Federal Energy Regulatory
                                                                                                        DEPARTMENT OF ENERGY                                  Commission
                                                accordance with the requirements of
                                                Rules of Practice and Procedure, 18 CFR                 Federal Energy Regulatory                             [Docket No. CP18–14–000]
                                                385.210, .211, and .214. In determining                 Commission
                                                the appropriate action to take, the                                                                           Blue Mountain Midstream LLC; Notice
                                                Commission will consider all protests or                                                                      of Application
                                                                                                        [Docket No. EL18–36–000]
                                                other comments filed, but only those
                                                                                                                                                                 Take notice that on November 9,
                                                who file a motion to intervene in                       City Water and Light Plant of the City                2017, Blue Mountain Midstream LLC
                                                accordance with the Commission’s                        of Jonesboro; Notice of Filing                        (Blue Mountain), 14701 Hertz Quail
                                                Rules may become a party to the
                                                                                                                                                              Springs Pkwy, Oklahoma City,
                                                proceeding. Any comments, protests, or                     Take notice that on November 21,
                                                                                                                                                              Oklahoma 73134, filed in Docket No.
                                                motions to intervene must be received                   2017, City Water and Light Plant of the
                                                                                                                                                              CP18–14–000 an application under
                                                on or before the specified comment date                 City of Jonesboro submitted a proposed
                                                                                                                                                              section 7(c) of the Natural Gas Act
                                                for the particular application.                         revenue requirement under Schedule 2
                                                                                                                                                              (NGA) and Part 157 of the Commission’s
                                                   All filings must (1) bear in all capital             of the Midcontinent Independent
                                                                                                                                                              regulations, seeking a certificate of
                                                letters the title PROTEST, MOTION TO                    Transmission System Operator Tariff.                  limited jurisdiction for the Blue
                                                INTERVENE, COMMENTS, REPLY                                 Any person desiring to intervene or to             Mountain Delivery Line located in
                                                COMMENTS, RECOMMENDATIONS,                              protest this filing must file in                      Grady County, Oklahoma, all as more
                                                TERMS AND CONDITIONS, or                                accordance with Rules 211 and 214 of                  fully set forth in the application which
                                                PRESCRIPTIONS; (2) set forth in the                     the Commission’s Rules of Practice and                is on file with the Commission and open
                                                heading the name of the applicant and                   Procedure (18 CFR 385.211, 385.214).                  to public inspection. Blue Mountain
                                                the project number of the application to                Protests will be considered by the                    also requests a blanket certificate under
                                                which the filing responds; (3) furnish                  Commission in determining the                         Subpart F of Part 157 of the
                                                the name, address, and telephone                        appropriate action to be taken, but will              Commission’s regulations. Blue
                                                number of the person protesting or                      not serve to make protestants parties to              Mountain further requests waivers of
                                                intervening; and (4) otherwise comply                   the proceeding. Any person wishing to                 certain Commission regulatory
                                                with the requirements of 18 CFR                         become a party must file a notice of                  requirements as set forth in the
                                                385.2001 through 385.2005. All                          intervention or motion to intervene, as               application.
                                                comments, recommendations, terms and                    appropriate. Such notices, motions, or                   Questions regarding this application
                                                conditions or prescriptions must set                    protests must be filed on or before the               should be directed to William F.
                                                forth their evidentiary basis and                       comment date. On or before the                        Demarest, Jr., Husch Blackwell LLP, 750
                                                otherwise comply with the requirements                  comment date, it is not necessary to                  17th Street NW., Suite 900, Washington,
                                                of 18 CFR 4.34(b). Agencies may obtain                  serve motions to intervene or protests                DC 20006, or by telephone at (202) 378–
                                                copies of the application directly from                 on persons other than the Applicant.                  2310, or by email at william.demarest@
                                                the applicant. A copy of any protest or                    The Commission encourages                          huschblackwell.com.
                                                motion to intervene must be served                      electronic submission of protests and                    This filing is available for review at
                                                upon each representative of the                         interventions in lieu of paper using the              the Commission’s Washington, DC
                                                applicant specified in the particular                   eFiling link at http://www.ferc.gov.                  offices, or may be viewed on the
                                                application. A copy of all other filings                Persons unable to file electronically                 Commission’s Web site at http://
                                                in reference to this application must be                should submit an original and 5 copies                www.ferc.gov using the e-Library link.
                                                accompanied by proof of service on all                  of the protest or intervention to the                 Enter the docket number, excluding the
                                                persons listed in the service list                      Federal Energy Regulatory Commission,                 last three digits, in the docket number
                                                prepared by the Commission in this                      888 First Street NE., Washington, DC                  field to access the document. For
                                                proceeding, in accordance with 18 CFR                   20426.                                                assistance, please contact FERC Online
                                                4.34(b) and 385.2010.                                      This filing is accessible on-line at               Support at FERCOnlineSupport@
                                                   You may also register online at http://              http://www.ferc.gov, using the eLibrary               ferc.gov, or call toll-free at (866) 208–
                                                www.ferc.gov/docs-filing/                               link and is available for review in the               3676, or for TTY, contact (202) 502–
                                                esubscription.asp to be notified via                    Commission’s Public Reference Room in                 8659.
                                                email of new filings and issuances                      Washington, DC. There is an                              Blue Mountain seeks authority to
                                                related to this or other pending projects.              eSubscription link on the Web site that               construct, own and operate the Blue
                                                For assistance, contact FERC Online                     enables subscribers to receive email                  Mountain Delivery Line downstream
pmangrum on DSK3GDR082PROD with NOTICES1




                                                Support.                                                notification when a document is added                 from the Chisolm Trail Plant which will
                                                   o. A license applicant must file no                  to a subscribed docket(s). For assistance             entail the construction of two natural
                                                later than 60 days following the date of                with any FERC Online service, please                  gas pipelines totaling 9.57 miles and a
                                                issuance of this notice: (1) A copy of the              email FERCOnlineSupport@ferc.gov, or                  metering and pigging facility. The two
                                                water quality certification; (2) a copy of              call (866) 208–3676 (toll free). For TTY,             natural gas pipelines would be
                                                the request for certification, including                call (202) 502–8659.                                  constructed in two stages. The first stage
                                                proof of the date on which the certifying                  Comment Date: 5:00 p.m. Eastern                    would be a 20-inch diameter steel
                                                agency received the request; or (3)                     Time on December 12, 2017.                            pipeline approximately 4.35 miles in


                                           VerDate Sep<11>2014   15:19 Nov 28, 2017   Jkt 241001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\29NON1.SGM   29NON1



Document Created: 2017-11-29 01:26:01
Document Modified: 2017-11-29 01:26:01
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 56595 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR