[Federal Register Volume 83, Number 140 (Friday, July 20, 2018)]
[Notices]
[Pages 34570-34571]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-15560]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 2386-004, 2387-003, 2388-004]


City of Holyoke Gas and Electric Department; Notice of 
Application Ready for Environmental Analysis and Soliciting Comments, 
Recommendations, Terms and Conditions, and Prescriptions

    Take notice that the following hydroelectric applications have been 
filed with the Commission and are available for public inspection.
    a. Type of Application: Subsequent Licenses.
    b. Project Nos.: 2386-004, 2387-003, and 2388-004.
    c. Date filed: August 31, 2016.
    d. Applicant: City of Holyoke Gas and Electric Department.
    e. Names of Projects: Holyoke Number 1 Hydroelectric Project, P-
2386-004; Holyoke Number 2 Hydroelectric Project, P-2387-003; and 
Holyoke Number 3 Hydroelectric Project, P-2388-004.
    f. Locations: Holyoke Number 1 (P-2386-004) and Holyoke Number 2 
(P-2387-003) are located between the first and second level canals, and 
Holyoke Number 3 (P-2388-004) is located between the second and third 
level canals on the Holyoke Canal System, adjacent to the Connecticut 
River, in the city of Holyoke in Hampden County, Massachusetts. The 
projects do not occupy federal land.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Paul Ducheney, Superintendent, City of 
Holyoke Gas and Electric Department, 99 Suffolk Street, Holyoke, MA 
01040, (413) 536-9340 or [email protected].
    i. FERC Contact: Kyle Olcott at (202) 502-8963; or email at 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include the 
relevant docket number(s): P-2386-004, P-2387-003, and/or P-2388-004.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. These applications have been accepted and are now ready for 
environmental analysis.
    l. The existing Holyoke Number 1 Project consists of: (1) An intake 
at the wall of the first level canal fed by the Holyoke Canal System 
(licensed under FERC Project No. 2004) with two 14.7-foot-tall by 24.6-
foot-wide trash rack screens with 3.5-inch clear spacing; (2) two 
parallel 10-foot-diameter, 36.5-foot-long penstocks; (3) a 50-foot-long 
by 38-foot-wide brick powerhouse with two 240-kilowatt and two 288-
kilowatt turbine generator units; (4) two parallel 20-foot-wide, 328.5-
foot-long brick arched tailrace conduits discharging into the second 
level canal; and, (5) appurtenant facilities. There is no transmission 
line associated with the project as it is located adjacent to the 
substation of interconnection. The project is estimated to generate 
2,710,000 kilowatt-hours annually.
    The existing Holyoke Number 2 Project consists of: (1) An intake at 
the wall of the first level canal fed by the Holyoke Canal System 
(licensed under FERC Project No. 2004) with three trash rack screens 
(one 16.2-foot-tall by 26.2-foot-wide and two 14.8-foot-tall by 21.8-
foot-long) with 3-inch clear spacing; (2) two 9-foot diameter, 240-
foot-long penstocks; (3) a 17-foot-high by 10-foot-diameter surge tank; 
(4) a 60-foot-long by 40-foot-wide by 50-foot high powerhouse with one 
800-kilowatt vertical turbine generator unit; (5) two parallel 9-foot-
wide, 10-foot-high, 120-foot-long brick arched tailrace conduits 
discharging into the second level canal; (6) an 800-foot-long, 4.8-
kilovolt transmission line; and (7) appurtenant facilities. The project 
is estimated to generate 4,710,000 kilowatt-hours annually.
    The existing Holyoke Number 3 Project consists of: (1) A 52.3-foot-
long by 14-foot-high intake trash rack covering an opening in the 
second level canal fed by the Holyoke Canal System (licensed under FERC 
Project No. 2004); (2) two 11-foot-high by 11-foot-wide headgates; (3) 
two 85-foot-long, 93-square-foot in cross section low pressure brick 
penstocks; (4) a 42-foot-long by 34-foot-wide by 28-foot-high 
reinforced concrete powerhouse with one 450-kilowatt turbine generator 
unit; (5) a 29.7-foot-wide, 10-foot-deep, 118-foot-

[[Page 34571]]

long open tailrace discharging into the third level canal; and, (6) 
4.8-kilovolt generator leads that connect directly to the 4.8-kilovolt 
area distribution system; and (7) appurtenant facilities. The project 
is estimated to generate 2,119,000 kilowatt-hours annually.
    m. Copies of the applications are available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. Copies are also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
applications directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b), and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    o. Procedural schedule: The applications will be processed 
according to the following schedule. Revisions to the schedule will be 
made as appropriate.

Commission issues draft EA, December 2018
Comments on draft EA, February 2019
Commission issues final EA, June 2019

    Dated: July 16, 2018.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2018-15560 Filed 7-19-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               34570                            Federal Register / Vol. 83, No. 140 / Friday, July 20, 2018 / Notices

                                                 9. Figure 1 summarizes the total                       filed with the Commission and are                     that document on each person on the
                                               reported costs incurred by Interior,                     available for public inspection.                      official service list for the project.
                                               Agriculture, and Commerce with respect                      a. Type of Application: Subsequent                 Further, if an intervenor files comments
                                               to their participation in administering                  Licenses.                                             or documents with the Commission
                                               Part I of the FPA. Additionally, Figure                     b. Project Nos.: 2386–004, 2387–003,               relating to the merits of an issue that
                                               1 summarizes the reported costs that the                 and 2388–004.                                         may affect the responsibilities of a
                                               Commission determined were clearly                          c. Date filed: August 31, 2016.                    particular resource agency, they must
                                               documented and accepted for inclusion                       d. Applicant: City of Holyoke Gas and              also serve a copy of the document on
                                               in its FY 2018 administrative annual                     Electric Department.                                  that resource agency.
                                               charges.                                                    e. Names of Projects: Holyoke Number                  k. These applications have been
                                                                                                        1 Hydroelectric Project, P–2386–004;                  accepted and are now ready for
                                               Summary Findings of Commission’s                         Holyoke Number 2 Hydroelectric                        environmental analysis.
                                               Costs Review                                             Project, P–2387–003; and Holyoke                         l. The existing Holyoke Number 1
                                                  10. As presented in Figure 1, the                     Number 3 Hydroelectric Project, P–                    Project consists of: (1) An intake at the
                                               Commission determined that $6,602,429                    2388–004.                                             wall of the first level canal fed by the
                                               of the $6,643,007 in total reported costs                   f. Locations: Holyoke Number 1 (P–                 Holyoke Canal System (licensed under
                                               were reasonable and clearly                              2386–004) and Holyoke Number 2 (P–                    FERC Project No. 2004) with two 14.7-
                                               documented in the OFAs’                                  2387–003) are located between the first               foot-tall by 24.6-foot-wide trash rack
                                               accompanying reports and/or analyses.                    and second level canals, and Holyoke                  screens with 3.5-inch clear spacing; (2)
                                               Based on this finding, 1% of the total                   Number 3 (P–2388–004) is located                      two parallel 10-foot-diameter, 36.5-foot-
                                               reported cost was determined to be                       between the second and third level                    long penstocks; (3) a 50-foot-long by 38-
                                               unreasonable. The Commission noted                       canals on the Holyoke Canal System,                   foot-wide brick powerhouse with two
                                               the most significant issue with the                      adjacent to the Connecticut River, in the             240-kilowatt and two 288-kilowatt
                                               documentation provided by the OFAs                       city of Holyoke in Hampden County,                    turbine generator units; (4) two parallel
                                               was the lack of supporting                               Massachusetts. The projects do not                    20-foot-wide, 328.5-foot-long brick
                                               documentation to substantiate costs                      occupy federal land.                                  arched tailrace conduits discharging
                                               reported on the ‘‘Other Federal Agency                      g. Filed Pursuant to: Federal Power                into the second level canal; and, (5)
                                               Cost Submission Form.’’                                  Act 16 U.S.C. 791(a)–825(r).                          appurtenant facilities. There is no
                                                  11. The cost reports that the                            h. Applicant Contact: Paul Ducheney,               transmission line associated with the
                                               Commission determined were clearly                       Superintendent, City of Holyoke Gas                   project as it is located adjacent to the
                                               documented and supported could be                        and Electric Department, 99 Suffolk                   substation of interconnection. The
                                               traced to detailed cost-accounting                       Street, Holyoke, MA 01040, (413) 536–                 project is estimated to generate
                                               reports, which reconciled to data                        9340 or ducheney@hged.com.                            2,710,000 kilowatt-hours annually.
                                               provided from agency financial systems                      i. FERC Contact: Kyle Olcott at (202)                 The existing Holyoke Number 2
                                               or other pertinent source                                502–8963; or email at kyle.olcott@                    Project consists of: (1) An intake at the
                                               documentation. A further breakdown of                    ferc.gov.                                             wall of the first level canal fed by the
                                               these costs is included in the Appendix                     j. Deadline for filing comments,                   Holyoke Canal System (licensed under
                                               to this notice, along with an explanation                recommendations, terms and                            FERC Project No. 2004) with three trash
                                               of how the Commission determined                         conditions, and prescriptions: 60 days                rack screens (one 16.2-foot-tall by 26.2-
                                               their reasonableness.                                    from the issuance date of this notice;                foot-wide and two 14.8-foot-tall by 21.8-
                                                                                                        reply comments are due 105 days from                  foot-long) with 3-inch clear spacing; (2)
                                               Points of Contact                                        the issuance date of this notice.                     two 9-foot diameter, 240-foot-long
                                                 12. If you have any questions                             The Commission strongly encourages                 penstocks; (3) a 17-foot-high by 10-foot-
                                               regarding this notice, please contact                    electronic filing. Please file comments,              diameter surge tank; (4) a 60-foot-long
                                               Norman Richardson at (202) 502–6219                      recommendations, terms and                            by 40-foot-wide by 50-foot high
                                               or Raven Rodriguez at (202) 502–6276.                    conditions, and prescriptions using the               powerhouse with one 800-kilowatt
                                                 Dated: July 16, 2018.                                  Commission’s eFiling system at http://                vertical turbine generator unit; (5) two
                                                                                                        www.ferc.gov/docs-filing/efiling.asp.                 parallel 9-foot-wide, 10-foot-high, 120-
                                               Kimberly D. Bose,
                                                                                                        Commenters can submit brief comments                  foot-long brick arched tailrace conduits
                                               Secretary.
                                                                                                        up to 6,000 characters, without prior                 discharging into the second level canal;
                                               [FR Doc. 2018–15562 Filed 7–19–18; 8:45 am]              registration, using the eComment system               (6) an 800-foot-long, 4.8-kilovolt
                                               BILLING CODE 6717–01–P                                   at http://www.ferc.gov/docs-filing/                   transmission line; and (7) appurtenant
                                                                                                        ecomment.asp. You must include your                   facilities. The project is estimated to
                                                                                                        name and contact information at the end               generate 4,710,000 kilowatt-hours
                                               DEPARTMENT OF ENERGY
                                                                                                        of your comments. For assistance,                     annually.
                                               Federal Energy Regulatory                                please contact FERC Online Support at                    The existing Holyoke Number 3
                                               Commission                                               FERCOnlineSupport@ferc.gov, (866)                     Project consists of: (1) A 52.3-foot-long
                                                                                                        208–3676 (toll free), or (202) 502–8659               by 14-foot-high intake trash rack
                                               [Project Nos. 2386–004, 2387–003, 2388–                  (TTY). In lieu of electronic filing, please           covering an opening in the second level
                                               004]                                                     send a paper copy to: Secretary, Federal              canal fed by the Holyoke Canal System
                                                                                                        Energy Regulatory Commission, 888                     (licensed under FERC Project No. 2004);
                                               City of Holyoke Gas and Electric
                                                                                                        First Street NE, Washington, DC 20426.                (2) two 11-foot-high by 11-foot-wide
daltland on DSKBBV9HB2PROD with NOTICES




                                               Department; Notice of Application
                                                                                                        The first page of any filing should                   headgates; (3) two 85-foot-long, 93-
                                               Ready for Environmental Analysis and
                                                                                                        include the relevant docket number(s):                square-foot in cross section low pressure
                                               Soliciting Comments,
                                                                                                        P–2386–004, P–2387–003, and/or P–                     brick penstocks; (4) a 42-foot-long by 34-
                                               Recommendations, Terms and
                                                                                                        2388–004.                                             foot-wide by 28-foot-high reinforced
                                               Conditions, and Prescriptions
                                                                                                           The Commission’s Rules of Practice                 concrete powerhouse with one 450-
                                                 Take notice that the following                         require all intervenors filing documents              kilowatt turbine generator unit; (5) a
                                               hydroelectric applications have been                     with the Commission to serve a copy of                29.7-foot-wide, 10-foot-deep, 118-foot-


                                          VerDate Sep<11>2014   18:06 Jul 19, 2018   Jkt 244001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\20JYN1.SGM   20JYN1


                                                                                Federal Register / Vol. 83, No. 140 / Friday, July 20, 2018 / Notices                                            34571

                                               long open tailrace discharging into the                  Comments on draft EA, February 2019                   Statement will not be prepared. The
                                               third level canal; and, (6) 4.8-kilovolt                 Commission issues final EA, June 2019                 purpose of this notice is to inform the
                                               generator leads that connect directly to                   Dated: July 16, 2018.                               public of the approval and availability
                                               the 4.8-kilovolt area distribution system;               Kimberly D. Bose,                                     of the Final RP/EA #4 and FONSI.
                                               and (7) appurtenant facilities. The                      Secretary.                                            ADDRESSES: Obtaining Documents: You
                                               project is estimated to generate                                                                               may download the Final RP/EA #4 and
                                                                                                        [FR Doc. 2018–15560 Filed 7–19–18; 8:45 am]
                                               2,119,000 kilowatt-hours annually.                                                                             FONSI at any of the following sites:
                                                  m. Copies of the applications are                     BILLING CODE 6717–01–P
                                                                                                                                                                • http://www.gulfspillrestoration.
                                               available for review at the Commission                                                                         noaa.gov
                                               in the Public Reference Room or may be                                                                           • http://www.la-dwh.com
                                               viewed on the Commission’s website at                    ENVIRONMENTAL PROTECTION                                Alternatively, you may request a CD
                                               http://www.ferc.gov using the                            AGENCY                                                of the Final RP/EA #4 and FONSI (see
                                               ‘‘eLibrary’’ link. Enter the docket                      [FRL–9980–78–OW]                                      FOR FURTHER INFORMATION CONTACT). You
                                               number excluding the last three digits in                                                                      may also view the document at any of
                                               the docket number field to access the                    Notice of Availability of the Deepwater               the public facilities listed at http://
                                               document. For assistance, contact FERC                   Horizon Oil Spill Louisiana Trustee                   www.gulfspillrestoration.noaa.gov.
                                               Online Support. Copies are also                          Implementation Group Final                            FOR FURTHER INFORMATION CONTACT:
                                               available for inspection and                             Restoration Plan/Environmental                        • Louisiana—Joann Hicks, 225–342–
                                               reproduction at the address in item h                    Assessment #4: Nutrient Reduction                     5477.
                                               above.                                                   (Nonpoint Source) and Recreational                      • EPA—Doug Jacobson, 214–665–
                                                  All filings must (1) bear in all capital              Opportunities and Finding of No                       6692.
                                               letters the title ‘‘COMMENTS’’, ‘‘REPLY                  Significant Impact
                                               COMMENTS’’,                                                                                                    SUPPLEMENTARY INFORMATION:
                                               ‘‘RECOMMENDATIONS,’’ ‘‘TERMS                             AGENCY: Environmental Protection
                                                                                                        Agency (EPA).                                         Introduction
                                               AND CONDITIONS,’’ or
                                               ‘‘PRESCRIPTIONS;’’ (2) set forth in the                  ACTION: Notice of availability.                          On April 20, 2010, the mobile
                                               heading the name of the applicant and                                                                          offshore drilling unit Deepwater
                                               the project number of the application to                 SUMMARY:   In accordance with the Oil                 Horizon, which was being used to drill
                                               which the filing responds; (3) furnish                   Pollution Act of 1990 (OPA) and the                   a well for BP Exploration and
                                               the name, address, and telephone                         National Environmental Policy Act                     Production, Inc. (BP), in the Macondo
                                               number of the person submitting the                      (NEPA), the Federal and State natural                 prospect (Mississippi Canyon 252–
                                               filing; and (4) otherwise comply with                    resource trustee agencies for the                     MC252), experienced a significant
                                               the requirements of 18 CFR 385.2001                      Louisiana Trustee Implementation                      explosion, fire, and subsequent sinking
                                               through 385.2005. All comments,                          Group (Louisiana TIG) have prepared                   in the Gulf of Mexico, resulting in an
                                               recommendations, terms and conditions                    the Final Restoration Plan and                        unprecedented volume of oil and other
                                               or prescriptions must set forth their                    Environmental Assessment #4: Nutrient                 discharges from the rig and from the
                                               evidentiary basis and otherwise comply                   Reduction (Nonpoint Source) and                       wellhead on the seabed. The Deepwater
                                               with the requirements of 18 CFR 4.34(b).                 Recreational Opportunities (Final RP/                 Horizon oil spill is the largest off shore
                                               Agencies may obtain copies of the                        EA #4). The Final RP/EA #4 describes                  oil spill in U.S. history, discharging
                                               applications directly from the applicant.                and, in conjunction with the associated               millions of barrels of oil over a period
                                               Each filing must be accompanied by                       Finding of No Significant Impact                      of 87 days.
                                               proof of service on all persons listed on                (FONSI), selects twenty-three preferred                  The Trustees conducted the natural
                                               the service list prepared by the                         project alternatives considered by the                resource damage assessment for the
                                               Commission in this proceeding, in                        Louisiana TIG to improve water quality                Deepwater Horizon oil spill under the
                                               accordance with 18 CFR 4.34(b), and                      by reducing nutrients from nonpoint                   Oil Pollution Act of 1990 (33 U.S.C.
                                               385.2010.                                                sources and to compensate for                         2701 et seq.). Under OPA, Federal and
                                                  You may also register online at http://               recreational use services lost as a result            State agencies act as trustees on behalf
                                               www.ferc.gov/docs-filing/                                of the Deepwater Horizon oil spill. The               of the public to assess natural resource
                                               esubscription.asp to be notified via                     Louisiana TIG evaluated alternatives                  injuries and losses and to determine the
                                               email of new filings and issuances                       under criteria set forth in the OPA                   actions required to compensate the
                                               related to this or other pending projects.               natural resource damage assessment                    public for those injuries and losses.
                                               For assistance, contact FERC Online                      (NRDA) regulations, and evaluated the                 OPA further instructs the designated
                                               Support.                                                 environmental consequences of the                     trustees to develop and implement a
                                                  n. A license applicant must file no                   restoration alternatives in accordance                plan for the restoration, rehabilitation,
                                               later than 60 days following the date of                 with NEPA. The selected projects are                  replacement, or acquisition of the
                                               issuance of this notice: (1) A copy of the               consistent with the restoration                       equivalent of the injured natural
                                               water quality certification; (2) a copy of               alternatives selected in the Deepwater                resources under their trusteeship,
                                               the request for certification, including                 Horizon oil spill Final Programmatic                  including the loss of use and services
                                               proof of the date on which the certifying                Damage Assessment and Restoration                     from those resources from the time of
                                               agency received the request; or (3)                      Plan/Programmatic Environmental                       injury until the time restoration to
                                               evidence of waiver of water quality                      Impact Statement (PDARP/PEIS). The                    baseline (the resource quality and
                                               certification.                                           Federal Trustees of the Louisiana TIG                 conditions that would exist if the spill
daltland on DSKBBV9HB2PROD with NOTICES




                                                  o. Procedural schedule: The                           have determined that implementation of                had not occurred) is complete.
                                               applications will be processed                           the Final RP/EA #4 is not a major                        The Deepwater Horizon oil spill
                                               according to the following schedule.                     federal action significantly affecting the            Trustees are:
                                               Revisions to the schedule will be made                   quality of the human environment                         • U.S. Environmental Protection
                                               as appropriate.                                          within the context of NEPA. They have                 Agency (EPA);
                                               Commission issues draft EA, December                     concluded a FONSI is appropriate, and,                   • U.S. Department of the Interior
                                                  2018                                                  therefore, an Environmental Impact                    (DOI), as represented by the National


                                          VerDate Sep<11>2014   18:06 Jul 19, 2018   Jkt 244001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\20JYN1.SGM   20JYN1



Document Created: 2018-07-20 01:19:12
Document Modified: 2018-07-20 01:19:12
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 34570 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR