83_FR_38838 83 FR 38686 - Notice of Availability of Government-Owned Inventions; Available for Licensing

83 FR 38686 - Notice of Availability of Government-Owned Inventions; Available for Licensing

DEPARTMENT OF DEFENSE
Department of the Navy

Federal Register Volume 83, Issue 152 (August 7, 2018)

Page Range38686-38687
FR Document2018-16875

The Department of the Navy (DoN) announces the availability of the inventions listed below, assigned to the United States Government, as represented by the Secretary of the Navy, for domestic and foreign licensing by the Department of the Navy.

Federal Register, Volume 83 Issue 152 (Tuesday, August 7, 2018)
[Federal Register Volume 83, Number 152 (Tuesday, August 7, 2018)]
[Notices]
[Pages 38686-38687]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-16875]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Navy


Notice of Availability of Government-Owned Inventions; Available 
for Licensing

AGENCY: Department of the Navy, DoD.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Department of the Navy (DoN) announces the availability of 
the inventions listed below, assigned to the United States Government, 
as represented by the Secretary of the Navy, for domestic and foreign 
licensing by the Department of the Navy.

ADDRESSES: Requests for copies of the patents cited should be directed 
to Naval Surface Warfare Center, Crane Div., Code OOL, Bldg. 2, 300 
Highway 361, Crane, IN 47522-5001.

[[Page 38687]]


FOR FURTHER INFORMATION CONTACT: Mr. Christopher Monsey, Naval Surface 
Warfare Center, Crane Div., Code OOL, Bldg. 2, 300 Highway 361, Crane, 
IN 47522-5001, email [email protected], 812-854-2777.

SUPPLEMENTARY INFORMATION: The following patents are available for 
licensing: Patent No. 10,012,457 (Navy Case No. 200367): TAKE-DOWN 
COMPACT PRECISION RIFLE//Patent No. 10,036,800 (Navy Case No. 103387): 
SYSTEMS AND METHODS FOR USING COHERENT NOISE FILTERING//and Patent No. 
10,037,498 (Navy Case No. 100130): PROJECT MANAGEMENT SYSTEM AND 
METHOD.

    Authority:  35 U.S.C. 207, 37 CFR part 404

    Dated: August 2, 2018.
Emilee Kujat Baldini,
Lieutenant Commander, Judge Advocate General's Corps, U.S. Navy, 
Federal Register Liaison Officer.
[FR Doc. 2018-16875 Filed 8-6-18; 8:45 am]
 BILLING CODE 3810-FF-P



                                               38686                         Federal Register / Vol. 83, No. 152 / Tuesday, August 7, 2018 / Notices

                                               You may send an email to Mr. Kris                       DEPARTMENT OF DEFENSE                                 (817) 886–1729; CedarRidge@
                                               Kleinschmidt at Kris.Kleinschmidt@                                                                            usace.army.mil.
                                               noaa.gov or contact him at (503) 820–                   Department of the Army, Corps of
                                                                                                                                                             SUPPLEMENTARY INFORMATION:      On March
                                               2280, extension 411 for technical                       Engineers
                                                                                                                                                             20, 2018, the Office of Management and
                                               assistance.                                                                                                   Budget (OMB) and the Council on
                                                                                                       Availability of the Final Environmental
                                                 Council address: Pacific Fishery                      Impact Statement for the Northern                     Environmental Quality (CEQ) issued an
                                               Management Council, 7700 NE                             Integrated Supply Project, Larimer and                OMB/CEQ Memorandum for Heads of
                                               Ambassador Place, Suite 101, Portland,                  Weld Counties, Colorado                               Federal Departments and Agencies
                                               OR 97220.                                                                                                     titled ‘‘One Federal Decision Framework
                                                                                                       AGENCY: Department of the Army, U.S.                  for the Environmental Review and
                                               FOR FURTHER INFORMATION CONTACT:    Dr.                 Army Corps of Engineers, DoD.                         Authorization Process for Major
                                               Kit Dahl, Pacific Council; telephone:                   ACTION: Notice; extension of public                   Infrastructure Projects under Executive
                                               (503) 820–2422.                                         comment deadline.                                     Order [E.O.] 13807.’’ Additionally,
                                               SUPPLEMENTARY INFORMATION:      The EWG                                                                       twelve federal agencies, including
                                                                                                       SUMMARY:   The comment period for the                 Department of the Army, signed a
                                               is holding this webinar to help other                   Availability of the Final Environmental
                                               Council advisory bodies and the public                                                                        Memorandum of Understanding (MOU)
                                                                                                       Impact Statement for the Northern                     as an appendix to the OMB/CEQ
                                               prepare comments on two topics the                      Integrated Supply Project, Larimer and                Memorandum. The MOU is titled
                                               Council will take up at its September 7–                Weld Counties, Colorado published in                  ‘‘Memorandum of Understanding
                                               12, 2018 meeting. First, the Council will               the Federal Register on Friday, July 20,              Implementing One Federal Decision
                                               be deciding on future activities as part                2018, and required comments be                        Under Executive Order 13807’’ and was
                                               of the Climate and Communities                          postmarked on or before September 4,                  effective on April 10, 2018. E.O. 13807
                                               Initiative pursuant to its Fishery                      2018. The Corps is extending the                      sets a goal for agencies of reducing the
                                               Ecosystem Plan (FEP). Second, the                       deadline for submitting public                        time for completing environmental
                                               Council will be scoping the first 5-year                comments to October 4, 2018.                          reviews and authorization decisions to
                                               review of the FEP. The Council may                      FOR FURTHER INFORMATION CONTACT: John                 an agency average of not more than two
                                               consider initiating revisions to FEP and                Urbanic, NISP EIS Project Manager,                    years from publication of a NOI to
                                               forming any new ad hoc committees                       telephone 303–979–4120, fax at 303–                   prepare an EIS. The MOU set forth
                                               necessary to revise the Plan. To help                   979–0602, or email at nisp.eis@                       activities to be accomplished before the
                                               advisory bodies and the public make                     usace.army.mil.                                       issuance of an NOI, including project
                                               comments on these topics the EWG                        SUPPLEMENTARY INFORMATION: None.                      prescoping, the development of a
                                               prepared two sets of discussion                                                                               permitting timetable, and the
                                                                                                       Brenda S. Bowen,                                      development of project Purpose and
                                               questions, available on the Council’s
                                               website (https://www.pcouncil.org/):                    Army Federal Register Liaison Officer.                Need. Because the Cedar Ridge
                                                                                                       [FR Doc. 2018–16861 Filed 8–6–18; 8:45 am]            Reservoir planning had not reached
                                               • Webinar Discussion Questions
                                                                                                       BILLING CODE 3720–58–P                                these milestones prior to publication of
                                               • Webinar Agenda                                                                                              the NOI, the NOI is being withdrawn
                                                  Although non-emergency issues not                                                                          until such time that these milestones are
                                               contained in the meeting agenda may be                  DEPARTMENT OF DEFENSE                                 complete.
                                               discussed, those issues may not be the
                                                                                                       Department of the Army; Corps of                      Brenda S. Bowen,
                                               subject of formal action during this                    Engineers                                             Army Federal Register Liaison Officer.
                                               meeting. Action will be restricted to
                                                                                                                                                             [FR Doc. 2018–16862 Filed 8–6–18; 8:45 am]
                                               those issues specifically listed in this                Withdrawal of the Notice of Intent To
                                                                                                                                                             BILLING CODE 3720–58–P
                                               document and any issues arising after                   Prepare an Environmental Impact
                                               publication of this document that                       Statement (EIS) for the City of Abilene,
                                               require emergency action under section                  TX, Cedar Ridge Reservoir Water                       DEPARTMENT OF DEFENSE
                                               305(c) of the Magnuson-Stevens Fishery                  Supply Project
                                               Conservation and Management Act,                                                                              Department of the Navy
                                               provided the public has been notified of                AGENCY: Department of the Army, U.S.
                                                                                                       Army Corps of Engineers, DoD.                         Notice of Availability of Government-
                                               the intent to take final action to address
                                               the emergency.                                          ACTION: Notice.                                       Owned Inventions; Available for
                                                                                                                                                             Licensing
                                               Special Accommodations                                  SUMMARY:   The U.S. Army Corps of
                                                                                                       Engineers, Fort Worth District,                       AGENCY:   Department of the Navy, DoD.
                                                 This meeting is physically accessible                 Regulatory Division is notifying                      ACTION:   Notice.
                                               to people with disabilities. Requests for               interested parties that it has withdrawn
                                               sign language interpretation or other                   the Notice of Intent (NOI) to develop an              SUMMARY:   The Department of the Navy
                                               auxiliary aids should be directed to Mr.                EIS for the proposed Cedar Ridge                      (DoN) announces the availability of the
                                               Kris Kleinschmidt, (503) 820–2411, at                   Reservoir. The original NOI to Prepare                inventions listed below, assigned to the
                                               least 10 business days prior to the                     an EIS was published in the Federal                   United States Government, as
                                               meeting date.                                           Register on Friday, April 13, 2018.                   represented by the Secretary of the
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                       FOR FURTHER INFORMATION CONTACT:                      Navy, for domestic and foreign licensing
                                                 Dated: August 1, 2018.                                                                                      by the Department of the Navy.
                                                                                                       Questions regarding the withdrawal of
                                               Tracey L. Thompson,                                     this NOI should be addressed to Mr.                   ADDRESSES: Requests for copies of the
                                               Acting Deputy Director, Office of Sustainable           Frederick Land, Regulatory Division                   patents cited should be directed to
                                               Fisheries, National Marine Fisheries Service.           (CESWF–DE–R), Fort Worth District,                    Naval Surface Warfare Center, Crane
                                               [FR Doc. 2018–16809 Filed 8–6–18; 8:45 am]              U.S. Army Corps of Engineers, P.O. Box                Div., Code OOL, Bldg. 2, 300 Highway
                                               BILLING CODE 3510–22–P                                  17300, Fort Worth, TX 76102–0300;                     361, Crane, IN 47522–5001.


                                          VerDate Sep<11>2014   16:54 Aug 06, 2018   Jkt 244001   PO 00000   Frm 00010   Fmt 4703   Sfmt 4703   E:\FR\FM\07AUN1.SGM   07AUN1


                                                                             Federal Register / Vol. 83, No. 152 / Tuesday, August 7, 2018 / Notices                                            38687

                                               FOR FURTHER INFORMATION CONTACT:    Mr.                   The Commission strongly encourages                  approximately 200 acre-feet at an
                                               Christopher Monsey, Naval Surface                       electronic filing. Please file motions to             elevation of approximately 159 feet
                                               Warfare Center, Crane Div., Code OOL,                   intervene and protests using the                      above sea level; and (2) three 3-foot-
                                               Bldg. 2, 300 Highway 361, Crane, IN                     Commission’s eFiling system at http://                high, 4-foot-wide manually operated
                                               47522–5001, email                                       www.ferc.gov/docs-filing/efiling.asp. For             butterfly gates.
                                               Christopher.Monsey@navy.mil, 812–                       assistance, please contact FERC Online
                                               854–2777.                                               Support at FERCOnlineSupport@                         Mill Dam
                                               SUPPLEMENTARY INFORMATION: The                          ferc.gov, (866) 208–3676 (toll free), or
                                                                                                                                                                (1) A 6-foot-tall, 70-foot-wide masonry
                                               following patents are available for                     (202) 502–8659 (TTY). In lieu of
                                                                                                                                                             dam impounding a reservoir with a
                                               licensing: Patent No. 10,012,457 (Navy                  electronic filing, please send a paper
                                                                                                                                                             storage capacity of approximately 7
                                               Case No. 200367): TAKE-DOWN                             copy to: Secretary, Federal Energy
                                               COMPACT PRECISION RIFLE//Patent                         Regulatory Commission, 888 First Street               acre-feet at an elevation of
                                               No. 10,036,800 (Navy Case No. 103387):                  NE, Washington, DC 20426. The first                   approximately 128 feet above sea level;
                                               SYSTEMS AND METHODS FOR USING                           page of any filing should include docket              (2) a concrete inlet structure; (3) a trash
                                               COHERENT NOISE FILTERING//and                           number P–2804–035.                                    sluice with wooden stop logs; (4) a
                                               Patent No. 10,037,498 (Navy Case No.                      The Commission’s Rules of Practice                  powerhouse containing a Francis-type
                                               100130): PROJECT MANAGEMENT                             require all intervenors filing documents              turbine and generator unit with a
                                               SYSTEM AND METHOD.                                      with the Commission to serve a copy of                licensed capacity of 94 kW; and (5) an
                                                  Authority: 35 U.S.C. 207, 37 CFR part 404            that document on each person on the                   approximately 100-foot-long, 12-kV
                                                                                                       official service list for the project.                transmission line. The penstock used to
                                                 Dated: August 2, 2018.
                                                                                                       Further, if an intervenor files comments              deliver water to the powerhouse has
                                               Emilee Kujat Baldini,                                   or documents with the Commission                      been removed due to deterioration and
                                               Lieutenant Commander, Judge Advocate                    relating to the merits of an issue that               subsequent leakage; thus, the
                                               General’s Corps, U.S. Navy, Federal Register            may affect the responsibilities of a
                                               Liaison Officer.
                                                                                                                                                             powerhouse is not operating.
                                                                                                       particular resource agency, they must
                                               [FR Doc. 2018–16875 Filed 8–6–18; 8:45 am]
                                                                                                       also serve a copy of the document on                  CMP Dam
                                               BILLING CODE 3810–FF–P
                                                                                                       that resource agency.                                    (1) A 21-foot-high, 231-foot-long
                                                                                                         k. This application has been accepted,
                                                                                                                                                             buttress dam impounding a reservoir
                                                                                                       but is not ready for environmental
                                               DEPARTMENT OF ENERGY                                                                                          with a storage capacity of approximately
                                                                                                       analysis at this time.
                                                                                                         l. The project consists of the following            72 acre-feet at an elevation of
                                               Federal Energy Regulatory                               existing facilities:                                  approximately 109 feet above sea level;
                                               Commission                                                                                                    (2) a manually operated low-level water
                                                                                                       Swan Lake Dam                                         release lift gate; (3) a manually operated
                                               [Project No. 2804–035]
                                                                                                          (1) A 14-foot-high, 250-foot-long rock             lift gate regulating flow to the penstock;
                                               Goose River Hydro, Inc.; Notice of                      masonry gravity dam impounding Swan                   (4) a 5-foot-diameter, 1,200-foot-long
                                               Application Accepted for Filing and                     Lake with a surface area of                           steel penstock; (5) a 300-square-foot
                                               Soliciting Motions To Intervene and                     approximately 1,364 acres at an                       concrete and timber powerhouse with a
                                               Protests                                                elevation of 201 feet above sea level; (2)            Kaplan-type turbine and generator unit
                                                 Take notice that the following                        a concrete inlet structure; (3) three 3.5-            with a licensed capacity of 200 kW; and
                                               hydroelectric application has been filed                foot-high, 4-foot-wide manually                       (6) an approximately 500-foot-long, 12-
                                               with the Commission and is available                    operated butterfly gates that regulate                kV transmission line. The penstock used
                                               for public inspection.                                  flow through the inlet structure; (4) two             to deliver water to the powerhouse is
                                                                                                       culverts the convey flow under Route                  currently out of service due to damage,
                                                 a. Type of Application: New Minor
                                                                                                       141; and (5) appurtenant facilities.                  deterioration, and subsequent leakage;
                                               License.
                                                 b. Project No.: 2804–035.                             Mason’s Dam                                           thus, the powerhouse is not operating.
                                                 c. Date filed: February 2, 2018.                                                                               m. A copy of the application is
                                                 d. Applicant: Goose River Hydro, Inc.                    (1) A 15-foot-high, 86-foot-long rock
                                                                                                       masonry dam impounding a reservoir                    available for review at the Commission
                                                 e. Name of Project: Goose River
                                                                                                       with a storage capacity of approximately              in the Public Reference Room or may be
                                               Hydroelectric Project.
                                                 f. Location: On the Goose River, in                   1,621 acre-feet at an elevation of 188                viewed on the Commission’s website at
                                               Waldo County, Maine. No federal lands                   feet above sea level; (2) a concrete inlet            http://www.ferc.gov using the
                                               are occupied by the project works or                    structure; (3) a manually operated                    ‘‘eLibrary’’ link. Enter the docket
                                               located within the project boundary.                    butterfly gate regulating flow from the               number excluding the last three digits in
                                                 g. Filed Pursuant to: Federal Power                   inlet structure to the penstock; (4) a 3-             the docket number field to access the
                                               Act, 16 U.S.C. 791 (a)–825(r).                          foot-diameter, 350-foot-long steel                    document. For assistance, contact FERC
                                                  h. Applicant Contact: Nicholas                       penstock; (5) a 266-square-foot concrete              Online Support. A copy is also available
                                               Cabral, Goose River Hydro, Inc., 41                     powerhouse containing two Kaplan                      for inspection and reproduction at the
                                               Sedgewood Drive, Kennebunk, ME                          turbines and generating units with a                  address in item h above.
                                               04043; (207) 604–4394; email—                           licensed capacity of 75 kW; (6) a 300-
                                                                                                                                                                You may also register online at http://
                                               gooseriverhydro@gmail.com.                              foot-long, 12-kilovolt (kV) transmission
                                                 i. FERC Contact: Julia Kolberg at (202)               line and (7) appurtenant facilities.                  www.ferc.gov/docs-filing/
daltland on DSKBBV9HB2PROD with NOTICES




                                               502–8261; or email at julia.kolberg@                                                                          esubscription.asp to be notified via
                                                                                                       Kelley Dam                                            email of new filings and issuances
                                               ferc.gov.
                                                  j. Deadline for filing motions to                      (1) A 15-foot-high, 135-foot-long                   related to this or other pending projects.
                                               intervene and protests: 60 days from the                masonry gravity dam impounding a                      For assistance, contact FERC Online
                                               issuance date of this notice.                           reservoir with a storage capacity of                  Support.




                                          VerDate Sep<11>2014   16:54 Aug 06, 2018   Jkt 244001   PO 00000   Frm 00011   Fmt 4703   Sfmt 4703   E:\FR\FM\07AUN1.SGM   07AUN1



Document Created: 2018-11-06 10:38:32
Document Modified: 2018-11-06 10:38:32
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
ContactMr. Christopher Monsey, Naval Surface Warfare Center, Crane Div., Code OOL, Bldg. 2, 300 Highway 361, Crane, IN 47522-5001, email [email protected], 812-854-2777.
FR Citation83 FR 38686 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR