83_FR_40184 83 FR 40028 - Texas Eastern Transmission, LP; Notice of Application

83 FR 40028 - Texas Eastern Transmission, LP; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 156 (August 13, 2018)

Page Range40028-40029
FR Document2018-17289

Federal Register, Volume 83 Issue 156 (Monday, August 13, 2018)
[Federal Register Volume 83, Number 156 (Monday, August 13, 2018)]
[Notices]
[Pages 40028-40029]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-17289]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-533-000]


Texas Eastern Transmission, LP; Notice of Application

    Take notice that on July 24, 2018, Texas Eastern Transmission, LP 
(Texas Eastern), P.O. Box 1642, Houston, Texas 77251, filed in Docket 
No. CP18-533-000 an application pursuant to section 7(b) of the Natural 
Gas Act (NGA) and Part 157 of the Commission's Regulations, requesting 
authorization to abandon approximately 30 miles of lateral Line 1-N and 
related facilities, located in Harrison and Marion Counties, Texas 
(Line 1-N Abandonment Project), all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection.
    The filing may also be viewed on the web at http://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to Lisa 
A. Connolly, Director, Rates & Certificates, Texas Eastern 
Transmission, LP, P.O. Box 1642, Houston, Texas 77251-1642, or by 
telephone (713) 627-4102, or fax (713) 627-5947 or by email to 
[email protected].
    Specifically, Texas Eastern proposes to (1) abandon in place and by 
removal a total of approximately 30 miles of 12-inch, 10-inch, and 8-
inch diameter lateral pipeline; (ii) abandon by removal all of the 
facilities at metering and regulating station 70191; and (iii) abandon 
by removal other related appurtenances. Texas Eastern states that the 
project will eliminate the need for future operating and maintenance 
expenditures on facilities that are no longer needed to provide 
transportation service and have not been used in over a year. Texas 
Eastern further states that abandonment of these facilities will not

[[Page 40029]]

result in any impact on certificated capacity on its system or in a 
reduction in firm service to existing customers of Texas Eastern.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit five copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit original and five copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on August 28, 2018.

    Dated: August 7, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-17289 Filed 8-10-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                40028                               Federal Register / Vol. 83, No. 156 / Monday, August 13, 2018 / Notices

                                                of prohibited and exempt off-the-record                             be considered by the Commission in                                     cooperating agency as described by 40
                                                communications.                                                     reaching its decision. Parties to a                                    CFR 1501.6, made under 18 CFR
                                                  Order No. 607 (64 FR 51222,                                       proceeding may seek the opportunity to                                 385.2201(e) (1) (v).
                                                September 22, 1999) requires                                        respond to any facts or contentions                                       The following is a list of off-the-
                                                Commission decisional employees, who                                made in a prohibited off-the-record                                    record communications recently
                                                make or receive a prohibited or exempt                              communication, and may request that                                    received by the Secretary of the
                                                off-the-record communication relevant                               the Commission place the prohibited                                    Commission. The communications
                                                to the merits of a contested proceeding,                            communication and responses thereto                                    listed are grouped by docket numbers in
                                                to deliver to the Secretary of the                                  in the decisional record. The                                          ascending order. These filings are
                                                Commission, a copy of the                                           Commission will grant such a request                                   available for electronic review at the
                                                communication, if written, or a                                     only when it determines that fairness so                               Commission in the Public Reference
                                                summary of the substance of any oral                                requires. Any person identified below as                               Room or may be viewed on the
                                                communication.                                                      having made a prohibited off-the-record                                Commission’s website at http://
                                                  Prohibited communications are                                     communication shall serve the                                          www.ferc.gov using the eLibrary link.
                                                included in a public, non-decisional file                           document on all parties listed on the                                  Enter the docket number, excluding the
                                                associated with, but not a part of, the                             official service list for the applicable                               last three digits, in the docket number
                                                decisional record of the proceeding.                                proceeding in accordance with Rule                                     field to access the document. For
                                                Unless the Commission determines that                               2010, 18 CFR 385.2010.                                                 assistance, please contact FERC Online
                                                the prohibited communication and any                                  Exempt off-the-record                                                Support at FERCOnlineSupport@
                                                responses thereto should become a part                              communications are included in the                                     ferc.gov or toll free at (866) 208–3676, or
                                                of the decisional record, the prohibited                            decisional record of the proceeding,                                   for TTY, contact (202) 502–8659.
                                                off-the-record communication will not                               unless the communication was with a                                       Exempt:

                                                                          Docket No.                                                                 File date                                               Presenter or requester

                                                1. CP16–357–000 .................................................       7–19–2018 ............................................................    George Chris Lagos.
                                                2. CP15–554–000 .................................................       7–19–2018 ............................................................    U.S. Congressman Robert Pittenger.
                                                3. CP16–121–000 .................................................       7–23–2018 ............................................................    City of Providence, Rhode Island.
                                                                                                                                                                                                  Councilman Seth Yurdin.
                                                4. CP16–357–000 .................................................       7–24–2018 ............................................................    George Chris Lagos.
                                                5. RP18–877–000 .................................................       7–24–2018 ............................................................    U.S. Congress.1
                                                6. CP16–121–000 .................................................       7–26–2018 ............................................................    FERC Staff.2
                                                7. P–2520–076 ......................................................    7–26–2018 ............................................................    FERC Staff.3
                                                8. CP14–96–000 ...................................................      8–1–2018 ..............................................................   New York State Legislature.4
                                                9. P–516–459 ........................................................   8–2–2018 ..............................................................   FERC Staff.5
                                                10. P–199–205 ......................................................    8–2–2018 ..............................................................   FERC Staff.6
                                                11. P–11810–004 ..................................................      8–2–2018 ..............................................................   FERC Staff.7
                                                12. CP17–40–000 .................................................       8–2–2018 ..............................................................   U.S. Senator Tammy Duckworth.



                                                  Dated: August 7, 2018.                                            Part 157 of the Commission’s                                           Connolly, Director, Rates & Certificates,
                                                Nathaniel J. Davis, Sr.,                                            Regulations, requesting authorization to                               Texas Eastern Transmission, LP, P.O.
                                                Deputy Secretary.                                                   abandon approximately 30 miles of                                      Box 1642, Houston, Texas 77251–1642,
                                                [FR Doc. 2018–17354 Filed 8–10–18; 8:45 am]                         lateral Line 1–N and related facilities,                               or by telephone (713) 627–4102, or fax
                                                BILLING CODE 6717–01–P
                                                                                                                    located in Harrison and Marion                                         (713) 627–5947 or by email to
                                                                                                                    Counties, Texas (Line 1–N                                              lisa.connolly@enbridge.com.
                                                                                                                    Abandonment Project), all as more fully                                   Specifically, Texas Eastern proposes
                                                DEPARTMENT OF ENERGY                                                set forth in the application which is on                               to (1) abandon in place and by removal
                                                                                                                    file with the Commission and open to                                   a total of approximately 30 miles of 12-
                                                Federal Energy Regulatory                                           public inspection.                                                     inch, 10-inch, and 8-inch diameter
                                                Commission                                                             The filing may also be viewed on the                                lateral pipeline; (ii) abandon by removal
                                                                                                                    web at http://www.ferc.gov using the                                   all of the facilities at metering and
                                                [Docket No. CP18–533–000]                                                                                                                  regulating station 70191; and (iii)
                                                                                                                    ‘‘eLibrary’’ link. Enter the docket
                                                Texas Eastern Transmission, LP;                                     number excluding the last three digits in                              abandon by removal other related
                                                Notice of Application                                               the docket number field to access the                                  appurtenances. Texas Eastern states that
                                                                                                                    document. For assistance, please contact                               the project will eliminate the need for
                                                  Take notice that on July 24, 2018,                                FERC Online Support at                                                 future operating and maintenance
                                                Texas Eastern Transmission, LP (Texas                               FERCOnlineSupport@ferc.gov or toll                                     expenditures on facilities that are no
                                                Eastern), P.O. Box 1642, Houston, Texas                             free at (866) 208–3676, or TTY, contact                                longer needed to provide transportation
                                                77251, filed in Docket No. CP18–533–                                (202) 502–8659.                                                        service and have not been used in over
                                                000 an application pursuant to section                                 Any questions concerning this                                       a year. Texas Eastern further states that
                                                7(b) of the Natural Gas Act (NGA) and                               application may be directed to Lisa A.                                 abandonment of these facilities will not
sradovich on DSK3GMQ082PROD with NOTICES




                                                  1 Senators Roy Blunt and Claire McCaskill.                          4 Assemblymen Sandra Galef, David Buchwald,                            7 Memorandum dated August 2, 2018 forwarding

                                                Congressmen Vicky Hartzler and Jason Smith.                         Steven Otis, and Thomas Abinanti.                                      email communication with Robert Hoffman of
                                                  2 Email dated July 26, 2018 with Timothy                            5 Memorandum dated August 2, 2018 forwarding
                                                                                                                                                                                           National Marine Fisheries Service.
                                                Timmermann with the EPA, Office of                                  email communication with Robert Hoffman of
                                                Environmental Review.                                               National Marine Fisheries Service.
                                                  3 Memorandum dated July 26, 2018 forwarding                         6 Memorandum dated August 2, 2018 forwarding

                                                email communication with Kevin Bernier of Great                     email communication with Robert Hoffman of
                                                Lakes Hydro America, LLC.                                           National Marine Fisheries Service.



                                           VerDate Sep<11>2014       20:42 Aug 10, 2018      Jkt 244001      PO 00000     Frm 00048       Fmt 4703      Sfmt 4703      E:\FR\FM\13AUN1.SGM          13AUN1


                                                                             Federal Register / Vol. 83, No. 156 / Monday, August 13, 2018 / Notices                                            40029

                                                result in any impact on certificated                    provide copies of their protests only to                 f. Location: The existing project is
                                                capacity on its system or in a reduction                the party or parties directly involved in             located at river mile 167 on the
                                                in firm service to existing customers of                the protest.                                          Guadalupe River in the City of
                                                Texas Eastern.                                             Persons who wish to comment only                   Gonzales, in Gonzales County, Texas.
                                                   Pursuant to section 157.9 of the                     on the environmental review of this                   The project does not affect federal lands.
                                                Commission’s rules (18 CFR 157.9),                      project should submit an original and                    g. Filed Pursuant to: Federal Power
                                                within 90 days of this Notice, the                      two copies of their comments to the                   Act, 16 U.S.C. 791 (a)–825(r).
                                                Commission staff will either: complete                  Secretary of the Commission.                             h. Applicant Contact: Tim Patek,
                                                its environmental assessment (EA) and                   Environmental commentors will be                      Superintendent of Public Works, City of
                                                place it into the Commission’s public                   placed on the Commission’s                            Gonzales, 1920 St. Joseph Street,
                                                record (eLibrary) for this proceeding or                environmental mailing list, will receive              Gonzales, TX 78629; Telephone (830)
                                                issue a Notice of Schedule for                          copies of the environmental documents,                672–3192; tpatek@gonzales.texas.gov.
                                                Environmental Review. If a Notice of                    and will be notified of meetings                         i. FERC Contact: Rachel McNamara at
                                                Schedule for Environmental Review is                    associated with the Commission’s                      (202) 502–8340, or at
                                                issued, it will indicate, among other                   environmental review process.                         rachel.mcnamara@ferc.gov.
                                                milestones, the anticipated date for the                Environmental commentors will not be                     j. This application is not ready for
                                                Commission staff’s issuance of the final                required to serve copies of filed                     environmental analysis at this time.
                                                environmental impact statement (FEIS)                   documents on all other parties.                          k. Project Description: The Gonzales
                                                or EA for this proposal. The filing of the              However, the non-party commentors                     Project consists of: (1) A 15-foot-high,
                                                EA in the Commission’s public record                    will not receive copies of all documents              258-foot-long, concrete Ambursen dam
                                                for this proceeding or the issuance of a                filed by other parties or issued by the               with a 178-foot-long ogee-type spillway;
                                                Notice of Schedule will serve to notify                 Commission (except for the mailing of                 (2) a reservoir with a surface area of 300
                                                federal and state agencies of the timing                environmental documents issued by the                 acres and a storage capacity of 1,400
                                                for the completion of all necessary                     Commission) and will not have the right               acre-feet; (3) an intake structure
                                                reviews, and the subsequent need to                     to seek court review of the                           comprised of six wooden water control
                                                complete all federal authorizations                     Commission’s final order.                             gates; (4) an 80-foot-long, 20-foot-wide
                                                within 90 days of the date of issuance                     The Commission strongly encourages                 brick powerhouse containing three
                                                of the Commission staff’s FEIS or EA.                   electronic filings of comments, protests              generating units with a total capacity of
                                                   There are two ways to become                         and interventions in lieu of paper using              1,140 kilowatts; (5) two 50-foot-long
                                                involved in the Commission’s review of                  the ‘‘eFiling’’ link at http://                       underground 5-kilovolt cables to a step-
                                                this project. First, any person wishing to              www.ferc.gov. Persons unable to file                  up transformer; and (6) an above-ground
                                                obtain legal status by becoming a party                 electronically should submit original                 transmission line connecting the step-
                                                to the proceedings for this project                     and five copies of the protest or                     up transformer to a distribution line
                                                should, on or before the comment date                   intervention to the Federal Energy                    near the access road to the project. The
                                                stated below, file with the Federal                     Regulatory Commission, 888 First Street               Gonzales Project is a conventional
                                                Energy Regulatory Commission, 888                       NE, Washington, DC 20426.                             project generating 1,314 megawatt-hours
                                                First Street, NE, Washington, DC 20426,                    Comment Date: 5:00 p.m. Eastern                    of electricity annually.
                                                a motion to intervene in accordance                     Time on August 28, 2018.                                 The project is operated as a run-of-
                                                with the requirements of the                                                                                  river facility with no impoundment
                                                                                                          Dated: August 7, 2018.
                                                Commission’s Rules of Practice and                                                                            fluctuation. When flows exceed the
                                                                                                        Kimberly D. Bose,                                     minimum flow requirement of 200 cubic
                                                Procedure (18 CFR 385.214 or 385.211)
                                                and the Regulations under the NGA (18                   Secretary.                                            feet per second (cfs) and a minimum of
                                                CFR 157.10). A person obtaining party                   [FR Doc. 2018–17289 Filed 8–10–18; 8:45 am]           9 feet of head height is achieved,
                                                status will be placed on the service list               BILLING CODE 6717–01–P                                generation can commence. When flows
                                                maintained by the Secretary of the                                                                            exceed the combined capacity of all
                                                Commission and will receive copies of                                                                         three turbines (1,161 cfs), excess flows
                                                all documents filed by the applicant and                DEPARTMENT OF ENERGY                                  are passed over the spillway dam.
                                                by all other parties. A party must submit                                                                        l. A copy of the application is
                                                                                                        Federal Energy Regulatory                             available for review at the Commission
                                                five copies of filings made with the
                                                                                                        Commission                                            in the Public Reference Room or may be
                                                Commission and must mail a copy to
                                                the applicant and to every other party in               [Project No. 2960–006]                                viewed on the Commission’s website at
                                                the proceeding. Only parties to the                                                                           http://www.ferc.gov, using the
                                                proceeding can ask for court review of                  City of Gonzales; Notice of Application               ‘‘eLibrary’’ link. Enter the docket
                                                Commission orders in the proceeding.                    Tendered for Filing With the                          number, excluding the last three digits
                                                   However, a person does not have to                   Commission and Establishing                           in the docket number field, to access the
                                                intervene in order to have comments                     Procedural Schedule for Licensing and                 document. For assistance, contact FERC
                                                considered. The second way to                           Deadline for Submission of Final                      Online Support at
                                                participate is by filing with the                       Amendments                                            FERCOnlineSupport@ferc.gov, or toll
                                                Secretary of the Commission, as soon as                   Take notice that the following                      free at (866) 208–3676, or for TTY at
                                                possible, an original and two copies of                 hydroelectric application has been filed              (202) 502–8659. A copy is also available
                                                comments in support of or in opposition                 with the Commission and is available                  for inspection and reproduction at the
                                                to this project. The Commission will
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        for public inspection.                                address in paragraph h.
                                                consider these comments in                                a. Type of Application: Subsequent                     You may also register online at http://
                                                determining the appropriate action to be                License.                                              www.ferc.gov/docs-filing/
                                                taken, but the filing of a comment alone                  b. Project No.: 2960–006.                           esubscription.asp to be notified via
                                                will not serve to make the filer a party                  c. Date Filed: July 27, 2018.                       email of new filings and issuances
                                                to the proceeding. The Commission’s                       d. Applicant: City of Gonzales.                     related to this or other pending projects.
                                                rules require that persons filing                         e. Name of Project: Gonzales                        For assistance, contact FERC Online
                                                comments in opposition to the project                   Hydroelectric Project (Gonzales Project).             Support.


                                           VerDate Sep<11>2014   20:42 Aug 10, 2018   Jkt 244001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\13AUN1.SGM   13AUN1



Document Created: 2018-08-11 00:27:59
Document Modified: 2018-08-11 00:27:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on August 28, 2018.
FR Citation83 FR 40028 

2025 Federal Register | Disclaimer | Privacy Policy