83_FR_48489 83 FR 48304 - Coronado Midstream LLC; Notice of Application

83 FR 48304 - Coronado Midstream LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 185 (September 24, 2018)

Page Range48304-48305
FR Document2018-20683

Federal Register, Volume 83 Issue 185 (Monday, September 24, 2018)
[Federal Register Volume 83, Number 185 (Monday, September 24, 2018)]
[Notices]
[Pages 48304-48305]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-20683]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-543-000]


Coronado Midstream LLC; Notice of Application

    Take notice that on August 30 2018, Coronado Midstream LLC 
(Coronado), 1722 Routh Street, Suite 1300, Dallas, Texas 75201, filed 
an application under section 7(c) of the Natural Gas Act and Part 157 
of the Commission's regulations requesting authorization to own and 
operate existing natural gas residue lines connected to three 
processing plants in Andrews County and Martin County, Texas, and for 
related waivers. Specifically, Coronado requests (1) a limited 
jurisdiction certificate authorizing Coronado to transport natural gas 
owned solely by Coronado through existing residue lines connected to 
the tailgate outlets of Coronado's Midmar East processing plant, Midmar 
West processing plant, and Riptide processing plant; and (2) a waiver 
of certain regulatory requirements.
    This filing is available for review at the Commission's Washington, 
DC offices, or may be viewed on the Commission's website at http://www.ferc.gov using the e-Library link. Enter the docket number, 
excluding the last three digits, in the docket number field to access 
the document. For assistance, please contact FERC Online Support at 
[email protected], or call toll-free at (866) 208-3676, or for 
TTY, contact (202) 502-8659.
    Any questions regarding the filing should be directed to Emily 
Fuquay, Senior Counsel & Director of Regulatory Affairs at the address 
listed above, by

[[Page 48305]]

phone at 214-721-9678, or via email at [email protected]; and 
Kenneth W.Irvin, Sidley Austin LLP, 1501 K Street NW, Washington, DC 
20005, by phone at 202-736- 8256, or via email at [email protected].
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    There is an eSubscription link on the website that enables 
subscribers to receive email notification when a document is added to a 
subscribed docket(s). For assistance with any FERC Online service, 
please email [email protected], or call (866) 208-3676 (toll 
free). For TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m., October 3, 2018.

    Dated: September 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-20683 Filed 9-21-18; 8:45 am]
 BILLING CODE 6717-01-P



                                              48304                     Federal Register / Vol. 83, No. 185 / Monday, September 24, 2018 / Notices

                                              Generator Status of LMBE Project                           Description: Baseline eTariff Filing:              385.214) on or before 5:00 p.m. Eastern
                                              Company LLC.                                            Petition for Approval of Initial Market-              time on the specified comment date.
                                                 Filed Date: 9/17/18.                                 Based Rate Tariff to be effective 10/1/               Protests may be considered, but
                                                 Accession Number: 20180917–5104.                     2018.                                                 intervention is necessary to become a
                                                 Comments Due: 5 p.m. ET 10/9/18.                        Filed Date: 9/17/18.                               party to the proceeding.
                                                 Take notice that the Commission                         Accession Number: 20180917–5027.                      eFiling is encouraged. More detailed
                                              received the following electric rate                       Comments Due: 5 p.m. ET 10/9/18.                   information relating to filing
                                              filings:                                                   Docket Numbers: ER18–2436–000.                     requirements, interventions, protests,
                                                 Docket Numbers: ER10–1276–009;                          Applicants: Mid-Atlantic Interstate                service, and qualifying facilities filings
                                              ER10–1292–008; ER10–1287–008;                           Transmission, LLC, PJM                                can be found at: http://www.ferc.gov/
                                              ER10–1303–008; ER10–1319–010;                           Interconnection, L.L.C.                               docs-filing/efiling/filing-req.pdf. For
                                              ER10–1353–010; ER18–1183–001;                              Description: § 205(d) Rate Filing:                 other information, call (866) 208–3676
                                              ER18–1184–001                                           MAIT submits IA SA No. 4578 to be                     (toll free). For TTY, call (202) 502–8659.
                                                 Applicants: Consumers Energy                         effective 11/16/2018.                                   Dated: September 17, 2018.
                                              Company, CMS Energy Resource                               Filed Date: 9/17/18.                               Nathaniel J. Davis, Sr.,
                                              Management Company, Grayling                               Accession Number: 20180917–5074.                   Deputy Secretary.
                                              Generation Station Limited Partnership,                    Comments Due: 5 p.m. ET 10/9/18.
                                                                                                                                                            [FR Doc. 2018–20729 Filed 9–21–18; 8:45 am]
                                              Genesee Power Station Limited                              Docket Numbers: ER18–2437–000.                     BILLING CODE 6717–01–P
                                              Partnership, CMS Generation Michigan                       Applicants: Southwest Power Pool,
                                              Power, LLC, Dearborn Industrial                         Inc.
                                              Generation, L.L.C., Delta Solar Power I,                   Description: § 205(d) Rate Filing:                 DEPARTMENT OF ENERGY
                                              LLC, Delta Solar Power II, LLC.                         Revisions to Schedule 12 FERC Annual
                                                 Description: Notice of Non-Material                  Charge Calculation to be effective                    Federal Energy Regulatory
                                              Change-In-Status of Consumer Energy                     3/1/2019.                                             Commission
                                              Company, et al.                                            Filed Date: 9/17/18.
                                                                                                                                                            [Docket No. CP18–543–000]
                                                 Filed Date: 9/14/18.                                    Accession Number: 20180917–5091.
                                                 Accession Number: 20180914–5195.                        Comments Due: 5 p.m. ET 10/9/18.                   Coronado Midstream LLC; Notice of
                                                 Comments Due: 5 p.m. ET 10/5/18.                        Docket Numbers: ER18–2438–000.                     Application
                                                 Docket Numbers: ER17–802–002.                           Applicants: Midcontinent
                                                 Applicants: Exelon Generation                        Independent System Operator, Inc.                        Take notice that on August 30 2018,
                                              Company, LLC.                                              Description: Compliance filing: 2018–              Coronado Midstream LLC (Coronado),
                                                 Description: Compliance filing:                      09–17_Compliance Filing to Address                    1722 Routh Street, Suite 1300, Dallas,
                                              Informational Filing Regarding Oyster                   Self-Fund EL15–68; EL15–36; ER16–696                  Texas 75201, filed an application under
                                              Creek Generating Station Deactivation to                to be effective 7/10/2018.                            section 7(c) of the Natural Gas Act and
                                              be effective N/A.                                          Filed Date: 9/17/18.                               Part 157 of the Commission’s
                                                 Filed Date: 9/14/18.                                    Accession Number: 20180917–5105.                   regulations requesting authorization to
                                                 Accession Number: 20180914–5165.                        Comments Due: 5 p.m. ET 10/9/18.                   own and operate existing natural gas
                                                 Comments Due: 5 p.m. ET 10/5/18.                        Docket Numbers: ER18–2439–000.                     residue lines connected to three
                                                 Docket Numbers: ER17–1376–005.                          Applicants: ITC Midwest LLC.                       processing plants in Andrews County
                                                 Applicants: Midcontinent                                Description: § 205(d) Rate Filing:                 and Martin County, Texas, and for
                                              Independent System Operator, Inc.                       Amended and Restated Interconnection/                 related waivers. Specifically, Coronado
                                                 Description: Compliance filing: 2018–                Interchange/JCA to be effective                       requests (1) a limited jurisdiction
                                              09–14 Compliance filing of Stored                       11/17/2018.                                           certificate authorizing Coronado to
                                              Energy Resources-Type II to be effective                   Filed Date: 9/17/18.                               transport natural gas owned solely by
                                              12/1/2017.                                                 Accession Number: 20180917–5113.                   Coronado through existing residue lines
                                                 Filed Date: 9/14/18.                                    Comments Due: 5 p.m. ET 10/9/18.                   connected to the tailgate outlets of
                                                 Accession Number: 20180914–5181.                                                                           Coronado’s Midmar East processing
                                                                                                         Take notice that the Commission                    plant, Midmar West processing plant,
                                                 Comments Due: 5 p.m. ET 10/5/18.                     received the following public utility                 and Riptide processing plant; and (2) a
                                                 Docket Numbers: ER18–2433–000.                       holding company filings:                              waiver of certain regulatory
                                                 Applicants: NRG REMA LLC.                               Docket Numbers: PH18–13–000.                       requirements.
                                                 Description: Compliance filing: Notice                  Applicants: Citizens Energy                           This filing is available for review at
                                              of Succession for Reactive Service Rate                 Corporation.                                          the Commission’s Washington, DC
                                              Schedule to be effective 8/21/2018.                        Description: Citizens Energy                       offices, or may be viewed on the
                                                 Filed Date: 9/14/18.                                 Corporation submits FERC 65–B                         Commission’s website at http://
                                                 Accession Number: 20180914–5173.                     Notification of Change in Status.                     www.ferc.gov using the e-Library link.
                                                 Comments Due: 5 p.m. ET 10/5/18.                        Filed Date: 9/13/18.                               Enter the docket number, excluding the
                                                 Docket Numbers: ER18–2434–000.                          Accession Number: 20180913–5135.                   last three digits, in the docket number
                                                 Applicants: PJM Interconnection,                        Comments Due: 5 p.m. ET 10/4/18.                   field to access the document. For
                                              L.L.C.                                                     The filings are accessible in the                  assistance, please contact FERC Online
                                                 Description: Notice of Cancellation of               Commission’s eLibrary system by                       Support at FERCOnlineSupport@
amozie on DSK3GDR082PROD with NOTICES1




                                              ISA of PJM Interconnection, L.L.C., (SA                 clicking on the links or querying the                 ferc.gov, or call toll-free at (866) 208–
                                              No. 825; Queue No. AA1–043).                            docket number.                                        3676, or for TTY, contact (202) 502–
                                                 Filed Date: 9/14/18.                                    Any person desiring to intervene or                8659.
                                                 Accession Number: 20180914–5188.                     protest in any of the above proceedings                  Any questions regarding the filing
                                                 Comments Due: 5 p.m. ET 10/5/18.                     must file in accordance with Rules 211                should be directed to Emily Fuquay,
                                                 Docket Numbers: ER18–2435–000.                       and 214 of the Commission’s                           Senior Counsel & Director of Regulatory
                                                 Applicants: ORNI 41 LLC.                             Regulations (18 CFR 385.211 and                       Affairs at the address listed above, by


                                         VerDate Sep<11>2014   19:58 Sep 21, 2018   Jkt 244001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\24SEN1.SGM   24SEN1


                                                                        Federal Register / Vol. 83, No. 185 / Monday, September 24, 2018 / Notices                                           48305

                                              phone at 214–721–9678, or via email at                    Comment Date: 5:00 p.m., October 3,                    • a new 32,000 horsepower natural
                                              emily.fuquay@enlink.com; and Kenneth                    2018.                                                 gas-fired compressor station in Somerset
                                              W.Irvin, Sidley Austin LLP, 1501 K                        Dated: September 12, 2018.                          County, New Jersey (Compressor Station
                                              Street NW, Washington, DC 20005, by                     Kimberly D. Bose,                                     206).
                                              phone at 202–736- 8256, or via email at                                                                          The draft GCD identifies that the
                                                                                                      Secretary.
                                              kirvin@sidley.com.                                                                                            Project is located within the NY–NJ–CT
                                                 There are two ways to become                         [FR Doc. 2018–20683 Filed 9–21–18; 8:45 am]
                                                                                                                                                            Interstate air quality control region
                                              involved in the Commission’s review of                  BILLING CODE 6717–01–P
                                                                                                                                                            (AQCR). The Clean Air Act defines
                                              this project. First, any person wishing to                                                                    nonattainment areas as ‘‘any area that
                                              obtain legal status by becoming a party                                                                       does not meet (or that contributes to
                                              to the proceedings for this project                     DEPARTMENT OF ENERGY
                                                                                                                                                            ambient air quality in a nearby area that
                                              should, on or before the comment date                   Federal Energy Regulatory                             does not meet) the national primary or
                                              stated below, file with the Federal                     Commission                                            secondary ambient air quality standard
                                              Energy Regulatory Commission, 888                                                                             for the pollutant’’. The draft
                                              First Street NE, Washington, DC 20426,                  [Docket No. CP17–101–000]
                                                                                                                                                            environmental impact statement
                                              a motion to intervene in accordance                                                                           explains that in order to achieve
                                              with the requirements of the                            Transcontinental Gas Pipe Line
                                                                                                      Company, LLC; Notice of Draft General                 improved air quality within a
                                              Commission’s Rules of Practice and                                                                            nonattainment area, reductions are
                                              Procedure (18 CFR 385.214 or 385.211)                   Conformity Determination for the
                                                                                                      Northeast Supply Enhancement                          required throughout the entire AQCR.
                                              and the Regulations under the NGA (18                                                                         The General Conformity Regulations
                                              CFR 157.10). A person obtaining party                   Project
                                                                                                                                                            require that offsets be purchased
                                              status will be placed on the service list                 The staff of the Federal Energy                     ‘‘within the same nonattainment or
                                              maintained by the Secretary of the                      Regulatory Commission (FERC or                        maintenance area (or a nearby area of
                                              Commission and will receive copies of                   Commission) has prepared a draft                      equal or higher classification provided
                                              all documents filed by the applicant and                general conformity determination (GCD)                the emissions from that area contribute
                                              by all other parties. A party must submit               for the Northeast Supply Enhancement                  to the violations, or have contributed to
                                              5 copies of filings made with the                       Project (Project) proposed by                         violations in the past).’’ Transco
                                              Commission and must mail a copy to                      Transcontinental Gas Pipe Line                        proposes to implement a combination of
                                              the applicant and to every other party in               Company, LLC (Transco) in the above-                  direct mitigation projects and
                                              the proceeding. Only parties to the                     referenced docket. The draft GCD                      purchasing emission reduction credits
                                              proceeding can ask for court review of                  assesses the potential air quality                    to offset construction emissions nitrogen
                                              Commission orders in the proceeding.                    impacts associated with the                           oxides for the Project. FERC staff will
                                                 However, a person does not have to                   construction and operation of natural                 issue the final GCD with the final
                                              intervene in order to have comments                     gas facilities to provide about 400                   environmental impact statement on
                                              considered. The second way to                           million standard cubic feet of natural
                                              participate is by filing with the                                                                             January 25, 2019.
                                                                                                      gas per day to Brooklyn Union Gas                        The Commission mailed a copy of the
                                              Secretary of the Commission, as soon as                 Company and KeySpan Gas East
                                              possible, an original and two copies of                                                                       Notice of Availability to federal, state,
                                                                                                      Corporation (collectively referred to as              and local government representatives
                                              comments in support of or in opposition                 National Grid) to serve residential and
                                              to this project. The Commission will                                                                          and agencies; elected officials;
                                                                                                      commercial customers in the New York                  environmental and public interest
                                              consider these comments in                              City area beginning in the 2020/heating
                                              determining the appropriate action to be                                                                      groups; Native American tribes;
                                                                                                      season.                                               potentially affected landowners and
                                              taken, but the filing of a comment alone                  The draft GCD was prepared to satisfy
                                              will not serve to make the filer a party                                                                      other interested individuals and groups;
                                                                                                      the requirements of the Clean Air Act.                and libraries in the Project area. The
                                              to the proceeding. The Commission’s                     The FERC staff concludes that the
                                              rules require that persons filing                                                                             draft GCD is only available in electronic
                                                                                                      Project would achieve conformity in                   format. It may be viewed and
                                              comments in opposition to the project                   New York and New Jersey through
                                              provide copies of their protests only to                                                                      downloaded using the eLibrary link on
                                                                                                      direct mitigation and the purchase of                 the FERC’s website. Click on the
                                              the party or parties directly involved in               emission reduction credits. The draft
                                              the protest.                                                                                                  eLibrary link (https://www.ferc.gov/
                                                                                                      GCD addresses the potential air quality               docs-filing/elibrary.asp), click on
                                                 The Commission strongly encourages
                                                                                                      impacts from construction and                         General Search, and enter the docket
                                              electronic filings of comments, protests
                                                                                                      operation of the following relevant                   number in the ‘‘Docket Number’’ field,
                                              and interventions in lieu of paper using
                                                                                                      subset of Project facilities:                         excluding the last three digits (i.e.,
                                              the eFiling link at http://www.ferc.gov.                  • A 3.4-mile-long, 26-inch-diameter
                                              Persons unable to file electronically                                                                         CP17–101). Be sure you have selected
                                                                                                      pipeline loop 1 in Middlesex County,                  an appropriate date range. For
                                              should submit an original and 7 copies
                                                                                                      New Jersey (Madison Loop);                            assistance, please contact FERC Online
                                              of the protest or intervention to the                     • a 23.5-mile long, 26-inch-diameter
                                              Federal Energy Regulatory Commission,                                                                         Support at FercOnlineSupport@ferc.gov
                                                                                                      pipeline loop comprised of a 0.2-mile-
                                              888 First Street NE, Washington, DC                                                                           or toll free at (866) 208–3676, or for
                                                                                                      long segment in onshore Middlesex
                                              20426.                                                                                                        TTY, contact (202) 502–8659.
                                                                                                      County, New Jersey, and a 23.3-mile-
                                                 There is an eSubscription link on the                                                                         In accordance with the General
                                                                                                      long segment in the offshore waters of
                                              website that enables subscribers to                                                                           Conformity Regulations under the Code
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                      Middlesex and Monmouth Counties,
                                              receive email notification when a                                                                             of Federal Regulations Chapter 40 Part
                                                                                                      New Jersey and Queens and Richmond
                                              document is added to a subscribed                                                                             93.156, the draft GCD is issued for a 30-
                                                                                                      Counties, New York (Raritan Bay Loop);
                                              docket(s). For assistance with any FERC                                                                       day comment period. Any person
                                                                                                      and
                                              Online service, please email                                                                                  wishing to comment on the draft GCD
                                              FERCOnlineSupport@ferc.gov, or call                       1 A pipeline ‘‘loop’’ is a segment of pipe          may do so. To ensure consideration of
                                              (866) 208–3676 (toll free). For TTY, call               constructed parallel to an existing pipeline to       your comments on the Project, it is
                                              (202) 502–8659.                                         increase capacity.                                    important that the Commission receive


                                         VerDate Sep<11>2014   17:40 Sep 21, 2018   Jkt 244001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\24SEN1.SGM   24SEN1



Document Created: 2018-09-22 00:32:49
Document Modified: 2018-09-22 00:32:49
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m., October 3, 2018.
FR Citation83 FR 48304 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR