83_FR_60643 83 FR 60416 - Oncor Electric Delivery Company LLC; Notice of Filing

83 FR 60416 - Oncor Electric Delivery Company LLC; Notice of Filing

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 227 (November 26, 2018)

Page Range60416-60417
FR Document2018-25582

Federal Register, Volume 83 Issue 227 (Monday, November 26, 2018)
[Federal Register Volume 83, Number 227 (Monday, November 26, 2018)]
[Notices]
[Pages 60416-60417]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-25582]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. NJ19-3-000]


Oncor Electric Delivery Company LLC; Notice of Filing

    Take notice that on November 7, 2018, Oncor Electric Delivery 
Company LLC submitted its tariff filing: Oncor TFO Tariff Rate Changes 
to be effective 10/10/2018.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov.

[[Page 60417]]

Persons unable to file electronically should submit an original and 5 
copies of the protest or intervention to the Federal Energy Regulatory 
Commission, 888 First Street NE, Washington, DC 20426.
    This filing is accessible on-line at http://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the website that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on November 28, 2018.

    Dated: November 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25582 Filed 11-23-18; 8:45 am]
 BILLING CODE 6717-01-P



     60416                      Federal Register / Vol. 83, No. 227 / Monday, November 26, 2018 / Notices

     Power Act (FPA), proposing to study the                 dam with a 196.85-foot-long, 17-foot-                 Commenters can submit brief comments
     feasibility of the Pushmataha County                    high emergency spillway with a channel                up to 6,000 characters, without prior
     Pumped Storage Hydroelectric Project                    to a creek; (2) an upper reservoir with               registration, using the eComment system
     (Pushmataha Project or project) to be                   a surface area of 366.07 acres, and a                 at http://www.ferc.gov/docs-filing/
     located on the Kiamichi River, near the                 storage capacity of 27,462 acre-feet; (3)             ecomment.asp. You must include your
     town of Talihina, in Pushmataha                         a 98.4-foot-long, 39.4-foot-high concrete             name and contact information at the end
     County, Oklahoma. The sole purpose of                   upper intake/outlet structure; (4) a                  of your comments. For assistance,
     a preliminary permit, if issued, is to                  3,979-foot-long, 32.8-foot-diameter steel             please contact FERC Online Support at
     grant the permit holder priority to file                and concrete headrace tunnel; (5) a 545-              FERCOnlineSupport@ferc.gov, (866)
     a license application during the permit                 foot-long, 90-foot-wide, 185.4-foot-high              208–3676 (toll free), or (202) 502–8659
     term. A preliminary permit does not                     underground concrete pumping station/                 (TTY). In lieu of electronic filing, please
     authorize the permit holder to perform                  powerhouse containing four pump/                      send a paper copy to: Secretary, Federal
     any land-disturbing activities or                       generating units with a total capacity of             Energy Regulatory Commission, 888
     otherwise enter upon lands or waters                    1,200 megawatts; (6) a 5,831-foot-long,               First Street NE, Washington, DC 20426.
     owned by others without the owners’                     32.8-foot-diameter tailrace tunnel; (7) a             The first page of any filing should
     express permission.                                     98.4-foot-long, 39.4-foot-high concrete               include docket number P–14890–000.
        The Pushmataha Project permit                        lower intake/outlet structure; (8) a                     More information about this project,
     application describes two adjacent,                     13,911-foot-long, 52.5-foot-high earthen              including a copy of the application, can
     alternative developments that the                       lower dam with a 33-foot-long, 13-foot-               be viewed or printed on the ‘‘eLibrary’’
     applicant proposes to choose between.                   high emergency spillway with a channel                link of Commission’s website at http://
        Alternative 1 would consist of the                   that becomes a tunnel to the Kiamichi                 www.ferc.gov/docs-filing/elibrary.asp.
     following: (1) An 886-foot-long, 282-                   River; (9) a lower reservoir with a                   Enter the docket number (P–14890) in
     foot-high concrete-faced rockfill upper                 surface area of 972.71 acres and a                    the docket number field to access the
     dam with a 196.85-foot-long, 17-foot-                   storage capacity of 31,223 acre-feet; (10)            document. For assistance, contact FERC
     high emergency spillway with a channel                  two 20-inch-diameter, 1,532-foot-long                 Online Support.
     to Long Creek; (2) an upper reservoir                   pipes with 110 kilowatt pumps to move
     with a surface area of 488.52 acres and                                                                         Dated: November 16, 2018.
                                                             water from a regulating reservoir to the
     a storage capacity of 43,633 acre-feet; (3)             lower reservoir; (11) a regulating                    Kimberly D. Bose,
     a 98.4-foot-long, 39.4-foot-high concrete               reservoir with a surface area of 40 acres             Secretary.
     upper intake/outlet structure; (4) a                    and a storage capacity of 1,216 acre-feet;            [FR Doc. 2018–25587 Filed 11–23–18; 8:45 am]
     7,030-foot-long, 32.8-foot-diameter steel               (12) two 20-inch-diameter, 886-foot-long              BILLING CODE 6717–01–P
     and concrete headrace tunnel; (5) a 550-                pipes with two 110 kilowatt pumps to
     foot-long, 93-foot-wide, 188.5-foot-high                move water from the Kiamichi River to
     underground concrete pumping station/                   the a regulating reservoir; (13) a 40-foot-           DEPARTMENT OF ENERGY
     powerhouse containing four pump/                        long, 40-foot-wide funnel-shaped intake
     generating units with a total capacity of               structure on the Kiamichi River located               Federal Energy Regulatory
     1,200 megawatts; (6) an 8,243-foot-long,                1.5-feet above the bottom of the                      Commission
     32.8-foot-diameter tailrace tunnel; (7) a               Kiamichi River tapering down to 10-                   [Docket No. NJ19–3–000]
     98.4-foot-long, 39.4-foot-high concrete                 foot-long, 10-foot-wide section where it
     lower intake/outlet structure; (8) a                    connects to the two withdrawal pipes;                 Oncor Electric Delivery Company LLC;
     13,615-foot-long, 68.9-foot-high earthen                and (14) a 124-mile-long transmission                 Notice of Filing
     lower dam with a 33-foot-long, 13-foot-                 line to the Electric Reliability Council of
     high emergency spillway with a channel                  Texas grid.                                              Take notice that on November 7,
     that becomes a tunnel to the Kiamichi                      For either alternative, the proposed               2018, Oncor Electric Delivery Company
     River; (9) a lower reservoir with a                     project would have an estimated average               LLC submitted its tariff filing: Oncor
     surface area of 727 acres and a storage                 annual generation of 4,368,000                        TFO Tariff Rate Changes to be effective
     capacity of 37,965 acre-feet; (10) two 20-              megawatt-hours.                                       10/10/2018.
     inch-diameter, 1,085-foot-long pipes                       Applicant Contact: Mr. John Bobenic,                  Any person desiring to intervene or to
     with 110 kilowatt pumps to move water                   Southeast Oklahoma Power                              protest this filing must file in
     from a regulating reservoir to the lower                Corporation, c/o Daytona Power Corp,                  accordance with Rules 211 and 214 of
     reservoir; (11) a regulating reservoir                  1800, 421–7 Avenue SW, Calgary,                       the Commission’s Rules of Practice and
     with a surface area of 40 acres and a                   Alberta Canada T2P 4K9; phone: (578)                  Procedure (18 CFR 385.211, 385.214).
     storage capacity of 1,216 acre-feet; (12)               433–4933.                                             Protests will be considered by the
     two 20-inch-diameter, 886-foot-long                        FERC Contact: Michael Spencer, (202)               Commission in determining the
     pipes with two 110 kilowatt pumps to                    502–6093, michael.spencer@ferc.gov.                   appropriate action to be taken, but will
     move water from the Kiamichi River to                      Deadline for filing comments, motions              not serve to make protestants parties to
     a regulating reservoir; (13) a 40-foot-                 to intervene, competing applications                  the proceeding. Any person wishing to
     long, 40-foot-wide funnel-shaped intake                 (without notices of intent), or notices of            become a party must file a notice of
     structure on the Kiamichi River located                 intent to file competing applications: 60             intervention or motion to intervene, as
     1.5-feet above the bottom of the                        days from the issuance of this notice.                appropriate. Such notices, motions, or
     Kiamichi River tapering down to 10-                     Competing applications and notices of                 protests must be filed on or before the
     foot-long, 10-foot-wide section where it                intent must meet the requirements of 18               comment date. On or before the
     connects to the two withdrawal pipes;                   CFR 4.36.                                             comment date, it is not necessary to
     and (14) a 124-mile-long transmission                      The Commission strongly encourages                 serve motions to intervene or protests
     line to the Electric Reliability Council of             electronic filing. Please file comments,              on persons other than the Applicant.
     Texas grid.                                             motions to intervene, notices of intent,                 The Commission encourages
        Alternative 2 would consist of the                   and competing applications using the                  electronic submission of protests and
     following: (1) A 1,529-foot-long, 233-                  Commission’s eFiling system at http://                interventions in lieu of paper using the
     foot-high concrete-faced rockfill upper                 www.ferc.gov/docs-filing/efiling.asp.                 ‘‘eFiling’’ link at http://www.ferc.gov.


VerDate Sep<11>2014   17:28 Nov 23, 2018   Jkt 247001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\26NON1.SGM   26NON1


                                Federal Register / Vol. 83, No. 227 / Monday, November 26, 2018 / Notices                                             60417

     Persons unable to file electronically                   should submit an original and 5 copies                Commission strongly encourages
     should submit an original and 5 copies                  of the protest or intervention to the                 electronic filing. Please file motions to
     of the protest or intervention to the                   Federal Energy Regulatory Commission,                 intervene, protests, comments, and
     Federal Energy Regulatory Commission,                   888 First Street NE, Washington, DC                   recommendations, using the
     888 First Street NE, Washington, DC                     20426.                                                Commission’s eFiling system at http://
     20426.                                                     This filing is accessible on-line at               www.ferc.gov/docs-filing/efiling.asp.
        This filing is accessible on-line at                 http://www.ferc.gov, using the                        Commenters can submit brief comments
     http://www.ferc.gov, using the                          ‘‘eLibrary’’ link and is available for                up to 6,000 characters, without prior
     ‘‘eLibrary’’ link and is available for                  review in the Commission’s Public                     registration, using the eComment system
     review in the Commission’s Public                       Reference Room in Washington, DC.                     at http://www.ferc.gov/docs-filing/
     Reference Room in Washington, DC.                       There is an ‘‘eSubscription’’ link on the             ecomment.asp. You must include your
     There is an ‘‘eSubscription’’ link on the               website that enables subscribers to                   name and contact information at the end
     website that enables subscribers to                     receive email notification when a                     of your comments. For assistance,
     receive email notification when a                       document is added to a subscribed                     please contact FERC Online Support at
     document is added to a subscribed                       docket(s). For assistance with any FERC               FERCOnlineSupport@ferc.gov, (866)
     docket(s). For assistance with any FERC                 Online service, please email                          208–3676 (toll free), or (202) 502–8659
     Online service, please email                            FERCOnlineSupport@ferc.gov, or call                   (TTY). In lieu of electronic filing, please
     FERCOnlineSupport@ferc.gov, or call                     (866) 208–3676 (toll free). For TTY, call             send a paper copy to: Secretary, Federal
     (866) 208–3676 (toll free). For TTY, call               (202) 502–8659.                                       Energy Regulatory Commission, 888
     (202) 502–8659.                                            Comment Date: 5:00 p.m. Eastern                    First Street NE, Washington, DC 20426.
        Comment Date: 5:00 p.m. Eastern                      Time on December 6, 2018.                             The first page of any filing should
     Time on November 28, 2018.                                                                                    include docket number P–2689–040.
                                                               Dated: November 19, 2018.
                                                                                                                      j. Description of Proceeding: N.E.W.
       Dated: November 16, 2018.                             Kimberly D. Bose,                                     Hydro, LLC, licensee for the Oconto
     Kimberly D. Bose,                                       Secretary.                                            Falls (Lower) Project No. 2689, filed a
     Secretary.                                              [FR Doc. 2018–25640 Filed 11–23–18; 8:45 am]          request with the Commission to extend
     [FR Doc. 2018–25582 Filed 11–23–18; 8:45 am]            BILLING CODE 6717–01–P                                the term of the project license, from
     BILLING CODE 6717–01–P                                                                                        April 30, 2024 to October 31, 2027,
                                                                                                                   which would align its modified
                                                             DEPARTMENT OF ENERGY                                  expiration date with that of the
     DEPARTMENT OF ENERGY                                                                                          licensee’s Oconto Falls (Upper) Project
                                                             Federal Energy Regulatory                             No. 2523, located approximately 2,000
     Federal Energy Regulatory                               Commission                                            feet upstream. The licensee requests the
     Commission                                                                                                    license term extension to coordinate and
                                                             [Project No. 2689–040]
     [Docket No. NJ19–1–000]                                                                                       streamline relicensing efforts, including
                                                             Notice of Application Accepted for                    developing and implementing study
     Notice of Supplement Filing; City of                    Filing, Soliciting Comments, Protests                 plans and consultation with resource
     Vernon, California                                      and Motions To Intervene; N.E.W.                      agencies for both projects.
                                                             Hydro, LLC                                               k. This notice is available for review
        Take notice that on November 15,                                                                           and reproduction at the Commission in
     2018, the City of Vernon, California                      Take notice that the following                      the Public Reference Room, Room 2A,
     submitted a Letter Supplementing                        hydroelectric application has been filed              888 First Street NE, Washington, DC
     October 31, 2018 City of Vernon,                        with the Commission and is available                  20426. The filing may also be viewed on
     California tariff filing (Error in                      for public inspection:                                the Commission’s website at http://
     Transmission Revenue Balancing                            a. Type of Proceeding: Extension of                 www.ferc.gov/docs-filing/elibrary.asp.
     Account Adjustment).                                    License Term.                                         Enter the Docket number (P–2689–040)
        Any person desiring to intervene or to                 b. Project No.: P–2689–040.                         excluding the last three digits in the
     protest this filing must file in                          c. Date Filed: November 2, 2018.                    docket number field to access the
     accordance with Rules 211 and 214 of                      d. Licensee: N.E.W. Hydro, LLC.                     notice. You may also register online at
     the Commission’s Rules of Practice and                    e. Name and Location of Project:                    http://www.ferc.gov/docs-filing/
     Procedure (18 CFR 385.211, 385.214).                    Oconto Falls (Lower) Hydroelectric                    esubscription.asp to be notified via
     Protests will be considered by the                      Project, located on the Oconto River, in              email of new filings and issuances
     Commission in determining the                           the City of Oconto Falls, Oconto County,              related to this or other pending projects.
     appropriate action to be taken, but will                Wisconsin.                                            For assistance, call toll-free 1–866–208–
     not serve to make protestants parties to                  f. Filed Pursuant to: Federal Power                 3676 or email FERCOnlineSupport@
     the proceeding. Any person wishing to                   Act, 16 U.S.C. 791a–825r.                             ferc.gov. For TTY, call (202) 502–8659.
     become a party must file a notice of                      g. Licensee Contact Information: Mr.                   l. Individuals desiring to be included
     intervention or motion to intervene, as                 Michael Scarzello, Regulatory Director,               on the Commission’s mailing list should
     appropriate. Such notices, motions, or                  Eagle Creek Renewable Energy, LLC,                    so indicate by writing to the Secretary
     protests must be filed on or before the                 116 N State Street, P.O. Box 167,                     of the Commission.
     comment date. On or before the                          Neshkoro, Wisconsin 54960, (973) 998–                    m. Comments, Protests, or Motions to
     comment date, it is not necessary to                    8400, Michael.Scarzello@                              Intervene: Anyone may submit
     serve motions to intervene or protests                  eaglecrekre.com.                                      comments, a protest, or a motion to
     on persons other than the Applicant.                      h. FERC Contact: Mr. Ashish Desai,                  intervene in accordance with the
        The Commission encourages                            (202) 502–8370, Ashish.Desai@ferc.gov.                requirements of Rules of Practice and
     electronic submission of protests and                     i. Deadline for filing comments,                    Procedure, 18 CFR 385.210, .211, and
     interventions in lieu of paper using the                motions to intervene and protests, is 30              .214. In determining the appropriate
     ‘‘eFiling’’ link at http://www.ferc.gov.                days from the issuance date of this                   action to take, the Commission will
     Persons unable to file electronically                   notice by the Commission. The                         consider all protests or other comments


VerDate Sep<11>2014   17:28 Nov 23, 2018   Jkt 247001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\26NON1.SGM   26NON1



Document Created: 2018-11-24 00:52:24
Document Modified: 2018-11-24 00:52:24
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on November 28, 2018.
FR Citation83 FR 60416 