83_FR_61062 83 FR 60834 - Saddle Butte Pipeline III, LLC; Notice of Request for Temporary Waiver

83 FR 60834 - Saddle Butte Pipeline III, LLC; Notice of Request for Temporary Waiver

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 228 (November 27, 2018)

Page Range60834-60835
FR Document2018-25810

Federal Register, Volume 83 Issue 228 (Tuesday, November 27, 2018)
[Federal Register Volume 83, Number 228 (Tuesday, November 27, 2018)]
[Notices]
[Pages 60834-60835]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-25810]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. OR19-6-000]


Saddle Butte Pipeline III, LLC; Notice of Request for Temporary 
Waiver

    Take notice that on November 14, 2018, Saddle Butte Pipeline III, 
LLC (Saddle Butte) filed a petition seeking a temporary waiver of the 
tariff filing and reporting requirements of sections 6 and 20 of the 
Interstate Commerce Act, 49 U.S.C. App. 6 and 20, and parts 341 and 357 
of the Federal Energy Regulatory Commission's regulations, 18 CFR parts 
341 and 357 (2018), with respect to its Powder Flats System, which is a 
crude petroleum gathering system located in Wyoming, all as more fully 
explained in the petition.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214. Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Petitioner.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies

[[Page 60835]]

of the protest or intervention to the Federal Energy Regulatory 
Commission, 888 First Street NE, Washington, DC 20426.
    This filing is accessible online at http://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the website that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern time on December 7, 2018.

    Dated: November 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25810 Filed 11-26-18; 8:45 am]
 BILLING CODE 6717-01-P



                                              60834                      Federal Register / Vol. 83, No. 228 / Tuesday, November 27, 2018 / Notices

                                                Accession Number: 20181119–5216.                         Applicants: PJM Interconnection,                   and 214 of the Commission’s
                                                Comments Due: 5 p.m. ET 12/10/18.                     L.L.C.                                                Regulations (18 CFR 385.211 and
                                                Docket Numbers: ER19–369–000.                            Description: § 205(d) Rate Filing: First           385.214) on or before 5:00 p.m. Eastern
                                                Applicants: Midcontinent                              Revised ISA, SA No. 4592; Queue No.                   time on the specified comment date.
                                              Independent System Operator, Inc.,                      AC1–182 to be effective 10/23/2018.                   Protests may be considered, but
                                              ALLETE, Inc.                                               Filed Date: 11/20/18.                              intervention is necessary to become a
                                                Description: § 205(d) Rate Filing:                       Accession Number: 20181120–5118.                   party to the proceeding.
                                              2018–11–20_SA 3213 MP–GRE ICA                              Comments Due: 5 p.m. ET 12/11/18.                     eFiling is encouraged. More detailed
                                              (Stinson) to be effective 11/21/2018.                      Docket Numbers: ER19–377–000.                      information relating to filing
                                                Filed Date: 11/20/18.                                    Applicants: Arizona Public Service                 requirements, interventions, protests,
                                                Accession Number: 20181120–5030.                      Company.                                              service, and qualifying facilities filings
                                                Comments Due: 5 p.m. ET 12/11/18.                        Description: § 205(d) Rate Filing:                 can be found at: http://www.ferc.gov/
                                                Docket Numbers: ER19–370–000.                         Service Agreement No. 216—                            docs-filing/efiling/filing-req.pdf. For
                                                Applicants: PJM Interconnection,                      Amendment No. 5 to be effective 11/1/                 other information, call (866) 208–3676
                                              L.L.C.                                                  2018.                                                 (toll free). For TTY, call (202) 502–8659.
                                                Description: § 205(d) Rate Filing:                       Filed Date: 11/20/18.                                Dated: November 20, 2018.
                                              Original ISA SA No. 5235; Queue No.                        Accession Number: 20181120–5125.                   Nathaniel J. Davis, Sr.,
                                              AB2–068 to be effective 10/23/2018.                        Comments Due: 5 p.m. ET 12/11/18.                  Deputy Secretary.
                                                Filed Date: 11/20/18.                                    Docket Numbers: ER19–378–000.                      [FR Doc. 2018–25781 Filed 11–26–18; 8:45 am]
                                                Accession Number: 20181120–5081.                         Applicants: Montour, LLC.                          BILLING CODE 6717–01–P
                                                Comments Due: 5 p.m. ET 12/11/18.                        Description: § 205(d) Rate Filing:
                                                Docket Numbers: ER19–371–000.                         Reactive Service Rate Schedule Filing to
                                                Applicants: Southwest Power Pool,                     be effective 2/17/2019.                               DEPARTMENT OF ENERGY
                                              Inc.                                                       Filed Date: 11/20/18.
                                                Description: § 205(d) Rate Filing:                       Accession Number: 20181120–5126.                   Federal Energy Regulatory
                                              1884R8 Westar Energy, Inc. NITSA NOA                       Comments Due: 5 p.m. ET 12/11/18.                  Commission
                                              to be effective 11/1/2018.                                 Docket Numbers: ER19–379–000.                      [Docket No. OR19–6–000]
                                                Filed Date: 11/20/18.                                    Applicants: PJM Interconnection,
                                                Accession Number: 20181120–5084.                      L.L.C.                                                Saddle Butte Pipeline III, LLC; Notice
                                                Comments Due: 5 p.m. ET 12/11/18.                        Description: § 205(d) Rate Filing:                 of Request for Temporary Waiver
                                                Docket Numbers: ER19–372–000.                         Original WMPA SA No. 5244; Queue
                                                Applicants: Southwest Power Pool,                     No. AD1–085 to be effective 11/14/2018.                  Take notice that on November 14,
                                              Inc.                                                       Filed Date: 11/20/18.                              2018, Saddle Butte Pipeline III, LLC
                                                Description: § 205(d) Rate Filing:                       Accession Number: 20181120–5138.                   (Saddle Butte) filed a petition seeking a
                                              1885R8 Westar Energy, Inc. NITSA NOA                       Comments Due: 5 p.m. ET 12/11/18.                  temporary waiver of the tariff filing and
                                              to be effective 11/1/2018.                                 Docket Numbers: ER19–380–000.                      reporting requirements of sections 6 and
                                                Filed Date: 11/20/18.                                    Applicants: Arizona Public Service                 20 of the Interstate Commerce Act, 49
                                                Accession Number: 20181120–5087.                      Company.                                              U.S.C. App. 6 and 20, and parts 341 and
                                                Comments Due: 5 p.m. ET 12/11/18.                        Description: § 205(d) Rate Filing:                 357 of the Federal Energy Regulatory
                                                                                                      Service Agreement No. 362 NITS with                   Commission’s regulations, 18 CFR parts
                                                Docket Numbers: ER19–373–000.
                                                                                                      City of Williams to be effective 11/1/                341 and 357 (2018), with respect to its
                                                Applicants: Paulding Wind Farm II
                                                                                                      2018.                                                 Powder Flats System, which is a crude
                                              LLC.
                                                                                                         Filed Date: 11/20/18.                              petroleum gathering system located in
                                                Description: Baseline eTariff Filing:
                                                                                                         Accession Number: 20181120–5155.                   Wyoming, all as more fully explained in
                                              Reactive Power Compensation Filing to
                                                                                                         Comments Due: 5 p.m. ET 12/11/18.                  the petition.
                                              be effective 1/19/2019.
                                                                                                                                                               Any person desiring to intervene or to
                                                Filed Date: 11/20/18.                                    Take notice that the Commission                    protest this filing must file in
                                                Accession Number: 20181120–5094.                      received the following electric                       accordance with Rules 211 and 214 of
                                                Comments Due: 5 p.m. ET 12/11/18.                     reliability filings:                                  the Commission’s Rules of Practice and
                                                Docket Numbers: ER19–374–000.                            Docket Numbers: RR19–2–000.                        Procedure (18 CFR 385.211 and 385.214.
                                                Applicants: Southern California                          Applicants: North American Electric                Protests will be considered by the
                                              Edison Company.                                         Reliability Corporation.                              Commission in determining the
                                                Description: § 205(d) Rate Filing:                       Description: Petition of the North                 appropriate action to be taken, but will
                                              Revised Formula Rate TO Tariff—Retail                   American Electric Reliability                         not serve to make protestants parties to
                                              Rate Revisions to be effective 1/21/2019.               Corporation for Approval of Proposed                  the proceeding. Any person wishing to
                                                Filed Date: 11/20/18.                                 Revisions to the Standard Processes                   become a party must file a notice of
                                                Accession Number: 20181120–5099.                      Manual, Appendix 3A to the NERC                       intervention or motion to intervene, as
                                                Comments Due: 5 p.m. ET 12/11/18.                     Rules of Procedure.                                   appropriate. Such notices, motions, or
                                                Docket Numbers: ER19–375–000.                            Filed Date: 11/19/18.                              protests must be filed on or before the
                                                Applicants: Duke Energy Florida,                         Accession Number: 20181119–5222.                   comment date. Anyone filing a motion
                                              LLC.                                                       Comments Due: 5 p.m. ET 12/10/18.                  to intervene or protest must serve a copy
amozie on DSK3GDR082PROD with NOTICES1




                                                Description: § 205(d) Rate Filing:                       The filings are accessible in the                  of that document on the Petitioner.
                                              DEF–Florida Power & Light (RS–81)                       Commission’s eLibrary system by                          The Commission encourages
                                              Amendment to be effective 11/30/2018.                   clicking on the links or querying the                 electronic submission of protests and
                                                Filed Date: 11/20/18.                                 docket number.                                        interventions in lieu of paper using the
                                                Accession Number: 20181120–5117.                         Any person desiring to intervene or                ‘‘eFiling’’ link at http://www.ferc.gov.
                                                Comments Due: 5 p.m. ET 12/11/18.                     protest in any of the above proceedings               Persons unable to file electronically
                                                Docket Numbers: ER19–376–000.                         must file in accordance with Rules 211                should submit an original and 5 copies


                                         VerDate Sep<11>2014   17:45 Nov 26, 2018   Jkt 247001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\27NON1.SGM   27NON1


                                                                         Federal Register / Vol. 83, No. 228 / Tuesday, November 27, 2018 / Notices                                            60835

                                              of the protest or intervention to the                   Commission in determining the                         the Boise River near Mountain Home in
                                              Federal Energy Regulatory Commission,                   appropriate action to be taken, but will              Elmore County, Idaho. The sole purpose
                                              888 First Street NE, Washington, DC                     not serve to make protestants parties to              of a preliminary permit, if issued, is to
                                              20426.                                                  the proceeding. Any person wishing to                 grant the permit holder priority to file
                                                 This filing is accessible online at                  become a party must file a notice of                  a license application during the permit
                                              http://www.ferc.gov, using the                          intervention or motion to intervene, as               term. A preliminary permit does not
                                              ‘‘eLibrary’’ link and is available for                  appropriate. The Respondent’s answer                  authorize the permit holder to perform
                                              review in the Commission’s Public                       and all interventions, or protests must               any land-disturbing activities or
                                              Reference Room in Washington, DC.                       be filed on or before the comment date.               otherwise enter upon lands or waters
                                              There is an ‘‘eSubscription’’ link on the               The Respondent’s answer, motions to                   owned by others without the owners’
                                              website that enables subscribers to                     intervene, and protests must be served                express permission.
                                              receive email notification when a                       on the Complainant.                                      As stated in the original permit for the
                                              document is added to a subscribed                          The Commission encourages                          project, Reclamation retains jurisdiction
                                              docket(s). For assistance with any FERC                 electronic submission of protests and                 over hydropower development at the
                                              Online service, please email                            interventions in lieu of paper using the              Anderson Ranch dam, reservoir, and
                                              FERCOnlineSupport@ferc.gov, or call                     ‘‘eFiling’’ link at http://www.ferc.gov.              powerhouse, which are part of
                                              (866) 208–3676 (toll free). For TTY, call               Persons unable to file electronically                 Reclamation’s Boise Project. However,
                                              (202) 502–8659.                                         should submit an original and 5 copies                the Commission retains jurisdiction for
                                                 Comment Date: 5 p.m. Eastern time                    of the protest or intervention to the                 hydropower facilities that would be
                                              on December 7, 2018.                                    Federal Energy Regulatory Commission,                 located outside of Reclamation’s
                                                                                                      888 First Street NE, Washington, DC                   development. Thus, an entity seeking to
                                                Dated: November 20, 2018.
                                                                                                      20426.                                                build a hydropower project that would
                                              Kimberly D. Bose,                                                                                             use Reclamation’s Boise Project
                                                                                                         This filing is accessible on-line at
                                              Secretary.                                                                                                    facilities would need to obtain a lease of
                                                                                                      http://www.ferc.gov, using the
                                              [FR Doc. 2018–25810 Filed 11–26–18; 8:45 am]
                                                                                                      ‘‘eLibrary’’ link and is available for                power privilege from Reclamation, but it
                                              BILLING CODE 6717–01–P                                  electronic review in the Commission’s                 also would need to obtain a license from
                                                                                                      Public Reference Room in Washington,                  the Commission for those facilities of
                                                                                                      DC. There is an ‘‘eSubscription’’ link on             the hydropower project that are not
                                              DEPARTMENT OF ENERGY                                                                                          under Reclamation’s jurisdiction.
                                                                                                      the website that enables subscribers to
                                                                                                      receive email notification when a                        The proposed project would utilize
                                              Federal Energy Regulatory                                                                                     Reclamation’s existing Anderson Ranch
                                              Commission                                              document is added to a subscribed
                                                                                                      docket(s). For assistance with any FERC               Reservoir as a lower reservoir and
                                              [Docket No. EL19–18–000]                                                                                      would consist of the following new
                                                                                                      Online service, please email
                                                                                                                                                            facilities: (1) A 4.3-mile-long, 80-foot-
                                                                                                      FERCOnlineSupport@ferc.gov, or call
                                              American Electric Power Service                                                                               high earthen dam; (2) a 63,500-acre-foot
                                                                                                      (866) 208–3676 (toll free). For TTY, call
                                              Corporation v. PJM Interconnection                                                                            impoundment as an upper reservoir; (3)
                                                                                                      (202) 502–8659.
                                              L.L.C.; Notice of Complaint                                                                                   six 2,500-foot-long, 14- to 16-foot-
                                                                                                         Comment Date: 5 p.m. Eastern Time
                                                                                                                                                            diameter steel penstocks; (4) two 100-
                                                 Take notice that on November 16,                     on December 6, 2018.
                                                                                                                                                            foot-diameter concrete silos; (5) twelve
                                              2018, pursuant to sections 206 and 306                    Dated: November 20, 2018.                           60-megawatt (MW) ternary turbine/
                                              of the Federal Power Act, 16 U.S.C. 824e                Kimberly D. Bose,                                     generator units, for a total capacity of
                                              and 825e, and Rule 206 of the Federal                   Secretary.                                            720 MW; (6) an 8.1-mile-long, 230-
                                              Energy Regulatory Commission’s                          [FR Doc. 2018–25808 Filed 11–26–18; 8:45 am]          kilovolt transmission line
                                              (Commission) Rules of Practice and                                                                            interconnecting with the existing
                                                                                                      BILLING CODE 6717–01–P
                                              Procedure, 18 CFR 385.206 (2018),                                                                             Bonneville Power Administration Dixie
                                              American Electric Power Service                                                                               Substation; (7) an approximately 2-mile-
                                              Corporation, on behalf of its PJM                       DEPARTMENT OF ENERGY                                  long access road; and (8) appurtenant
                                              transmission owners (Complainant)                                                                             facilities. The estimated annual
                                              filed a formal complaint against PJM                    Federal Energy Regulatory                             generation of the project would be
                                              Interconnection L.L.C. (PJM or                          Commission                                            1,965.4 gigawatt-hours.
                                              Respondent), alleging that PJM’s Open                                                                            Applicant Contact: James T. Carkulis,
                                              Access Transmission Tariff is unjust                    [Project No. 14655–001]
                                                                                                                                                            Cat Creek Energy, LLC, 398 S 9th Street
                                              and unreasonable because it does not                    Cat Creek Energy, LLC; Notice of                      Suite 240, Boise, ID 83702; phone: (208)
                                              include indemnifications provisions                     Successive Preliminary Permit                         954–5090.
                                              that are consistent with the                            Application Accepted for Filing and                      FERC Contact: Karen Sughrue; phone:
                                              Commission’s pro forma Large                            Soliciting Comments, Motions To                       (202) 502–8556.
                                              Generator Interconnection Agreement,                    Intervene, and Competing Applications                    Deadline for filing comments, motions
                                              as more fully explained in the                                                                                to intervene, competing applications
                                              complaint.                                                On November 9, 2018, Cat Creek                      (without notices of intent), or notices of
                                                 The Complainant certifies that copies                Energy, LLC (Cat Creek) filed an                      intent to file competing applications: 60
                                              of the complaint were served on the                     application for a successive preliminary              days from the issuance of this notice.
                                              contacts for Respondent, as listed on the               permit, pursuant to section 4(f) of the               Competing applications and notices of
amozie on DSK3GDR082PROD with NOTICES1




                                              Commission’s list of Corporate Officials.               Federal Power Act (FPA), to study the                 intent must meet the requirements of 18
                                                 Any person desiring to intervene or to               feasibility of the proposed Cat Creek                 CFR 4.36.
                                              protest this filing must file in                        Energy Generation Facility Pumped                        The Commission strongly encourages
                                              accordance with Rules 211 and 214 of                    Storage Hydroelectric Project (project) to            electronic filing. Please file comments,
                                              the Commission’s Rules of Practice and                  be located at the U.S. Bureau of                      motions to intervene, notices of intent,
                                              Procedure (18 CFR 385.211, 385.214).                    Reclamation’s (Reclamation) Anderson                  and competing applications using the
                                              Protests will be considered by the                      Ranch Reservoir on the South Fork of                  Commission’s eFiling system at http://


                                         VerDate Sep<11>2014   17:45 Nov 26, 2018   Jkt 247001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\27NON1.SGM   27NON1



Document Created: 2018-11-27 01:25:25
Document Modified: 2018-11-27 01:25:25
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5 p.m. Eastern time on December 7, 2018.
FR Citation83 FR 60834 