83_FR_61382 83 FR 61153 - Combined Notice of Filings #1

83 FR 61153 - Combined Notice of Filings #1

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 229 (November 28, 2018)

Page Range61153-61154
FR Document2018-25925

Federal Register, Volume 83 Issue 229 (Wednesday, November 28, 2018)
[Federal Register Volume 83, Number 229 (Wednesday, November 28, 2018)]
[Notices]
[Pages 61153-61154]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-25925]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER13-1667-004.
    Applicants: Battery Utility of Ohio, LLC.
    Description: Notice of Change in Status of Battery Utility of Ohio, 
LLC.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5221.
    Comments Due: 5 p.m. ET 12/11/18.

    Docket Numbers: ER17-1609-002.
    Applicants: Carroll County Energy LLC.
    Description: Notice of Non-Material Change in Status of Carroll 
County Energy LLC.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5254.
    Comments Due: 5 p.m. ET 12/11/18.

    Docket Numbers: ER18-2516-000.
    Applicants: Willow Springs Solar, LLC.
    Description: Amendment to September 28, 2018 Willow Springs Solar, 
LLC tariff filing.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5219.
    Comments Due: 5 p.m. ET 11/27/18.

    Docket Numbers: ER19-104-001.
    Applicants: El Paso Electric Company.
    Description: Tariff Amendment: Concurrence of EPE to APS Service 
Agreement No. 367 to be effective 9/7/2018.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5167.
    Comments Due: 5 p.m. ET 12/11/18.

    Docket Numbers: ER19-381-000.
    Applicants: Power Holding LLC.
    Description: Baseline eTariff Filing: Application for Market Based 
Rate to be effective 11/21/2018.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5175.
    Comments Due: 5 p.m. ET 12/11/18.

    Docket Numbers: ER19-382-000.
    Applicants: Duke Energy Carolinas, LLC.
    Description: Sec.  205(d) Rate Filing: DEC-City of Concord NITSA 
(SA-150) Amendment to be effective 1/1/2019.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5176.
    Comments Due: 5 p.m. ET 12/11/18.

    Docket Numbers: ER19-383-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Revisions to OATT and OA re 
Regulation Market Clearing Price to be effective 1/21/2019.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5182.
    Comments Due: 5 p.m. ET 12/11/18.

    Docket Numbers: ER19-384-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Request for One-time Limited Tariff Waiver, et al. of 
Pacific Gas and Electric Company under ER19-384.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5218.
    Comments Due: 5 p.m. ET 11/30/18.

    Docket Numbers: ER19-385-000.
    Applicants: NRG Power Marketing LLC.
    Description: Application to Recover Fuel Procurement Costs of NRG 
Power Marketing, LLC.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5223.
    Comments Due: 5 p.m. ET 12/11/18.

    Docket Numbers: ER19-386-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to ISA, SA No. 
2278, Queue# None (Consent) to be effective 4/1/2010.
    Filed Date: 11/21/18.
    Accession Number: 20181121-5054.
    Comments Due: 5 p.m. ET 12/12/18.

    Docket Numbers: ER19-387-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA and CSA, SA 
Nos. 5231 and 5232; Queue No. AC1-048/AC2-053 to be effective 10/23/
2018.
    Filed Date: 11/21/18.
    Accession Number: 20181121-5061.
    Comments Due: 5 p.m. ET 12/12/18.

    Take notice that the Commission received the following qualifying 
facility filings:


[[Page 61154]]


    Docket Numbers: QF18-452-000.
    Applicants: North American Natural Resources, Inc.
    Description: Refund Report of North American Natural Resources, 
Inc.
    Filed Date: 11/20/18.
    Accession Number: 20181120-5217.
    Comments Due: 5 p.m. ET 12/11/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: November 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-25925 Filed 11-27-18; 8:45 am]
 BILLING CODE 6717-01-P



                             Federal Register / Vol. 83, No. 229 / Wednesday, November 28, 2018 / Notices                                            61153

     identified as the Greater Wenatchee                     208–3676 (toll free), or (202) 502–8659                  Docket Numbers: ER19–381–000.
     Irrigation District. Water would be                     (TTY). In lieu of electronic filing, please              Applicants: Power Holding LLC.
     delivered from the District’s Veedol                    send a paper copy to: Secretary, Federal                 Description: Baseline eTariff Filing:
     Tank via an approximately 0.7-mile-                     Energy Regulatory Commission, 888                     Application for Market Based Rate to be
     long, 12-inch-diameter buried steel pipe                First Street NE, Washington, DC 20426.                effective 11/21/2018.
     to a new lower reservoir. The proposed                  The first page of any filing should                      Filed Date: 11/20/18.
     project would consist of: An upper 5- to                include docket number P–14892–000.                       Accession Number: 20181120–5175.
     40-foot-high, 7,500-foot-long zoned                        More information about this project,                  Comments Due: 5 p.m. ET 12/11/18.
     earth/rockfill ring dam enclosing the 70-               including a copy of the application, can                 Docket Numbers: ER19–382–000.
     acre upper reservoir with storage                       be viewed or printed on the eLibrary                     Applicants: Duke Energy Carolinas,
     capacity of 2,000 acre-feet; a lower 35-                link of Commission’s website at http://               LLC.
     foot-high, 540-foot-long zoned earth/                   www.ferc.gov/docs-filing/elibrary.asp.                   Description: § 205(d) Rate Filing: DEC-
     rockfill primary dam and 10-foot-high,                  Enter the docket number (P–14892) in                  City of Concord NITSA (SA–150)
     830-foot-long earthen supplemental dam                  the docket number field to access the                 Amendment to be effective 1/1/2019.
     enclosing the 80-acre lower reservoir                   document. For assistance, contact FERC                   Filed Date: 11/20/18.
     with storage capacity of 2,600 acre-feet;               Online Support.                                          Accession Number: 20181120–5176.
     a 600-foot-long, 14-foot-diameter                                                                                Comments Due: 5 p.m. ET 12/11/18.
                                                               Dated: November 21, 2018.
     unlined or concrete-lined low pressure                                                                           Docket Numbers: ER19–383–000.
                                                             Nathaniel J. Davis, Sr.,                                 Applicants: PJM Interconnection,
     tunnel; a 30-foot-diameter, 50-foot-high
     concrete surge tank; two 5,200-foot-long,               Deputy Secretary.                                     L.L.C.
     10-foot-diameter steel penstocks; a                     [FR Doc. 2018–25923 Filed 11–27–18; 8:45 am]             Description: § 205(d) Rate Filing:
     powerhouse with a 220-foot-high, 65-                    BILLING CODE 6717–01–P                                Revisions to OATT and OA re
     foot-diameter steel and concrete shaft,                                                                       Regulation Market Clearing Price to be
     and two 150-megawatt (MW) reversible                                                                          effective 1/21/2019.
     pump-turbines/motor-generators for a                    DEPARTMENT OF ENERGY                                     Filed Date: 11/20/18.
     total installed capacity of 300 MW; a                                                                            Accession Number: 20181120–5182.
     1,200-foot-long, 17-foot-diameter                       Federal Energy Regulatory                                Comments Due: 5 p.m. ET 12/11/18.
     concrete-lined tailrace tunnel; a 230-                  Commission                                               Docket Numbers: ER19–384–000.
     kilovolt (kV), 3.7-mile-long transmission                                                                        Applicants: Pacific Gas and Electric
                                                             Combined Notice of Filings #1                         Company.
     line interconnecting with the existing
     Puget Sound Energy Rocky Reach-                            Take notice that the Commission                       Description: Request for One-time
     Cascade transmission line, and a                        received the following electric rate                  Limited Tariff Waiver, et al. of Pacific
     possible second transmission line                       filings:                                              Gas and Electric Company under ER19–
     interconnecting with the existing 230-                     Docket Numbers: ER13–1667–004.                     384.
     kV Bonneville Power Administration                         Applicants: Battery Utility of Ohio,                  Filed Date: 11/20/18.
     Rocky Reach-Columbia transmission                                                                                Accession Number: 20181120–5218.
                                                             LLC.
     line 500 feet from the powerhouse.                                                                               Comments Due: 5 p.m. ET 11/30/18.
                                                                Description: Notice of Change in
        The estimated average annual                         Status of Battery Utility of Ohio, LLC.                  Docket Numbers: ER19–385–000.
     generation of the project would be                         Filed Date: 11/20/18.                                 Applicants: NRG Power Marketing
     473,040 megawatt-hours.                                    Accession Number: 20181120–5221.                   LLC.
        Applicant Contact: Matthew Shapiro,                     Comments Due: 5 p.m. ET 12/11/18.                     Description: Application to Recover
     CEO, Gridflex Energy, LLC, 1210 W.                                                                            Fuel Procurement Costs of NRG Power
                                                                Docket Numbers: ER17–1609–002.                     Marketing, LLC.
     Franklin St. #2, Boise, ID 837021, phone
                                                                Applicants: Carroll County Energy                     Filed Date: 11/20/18.
     (208) 246–9925.
        FERC Contact: Peter McBride, (202)                   LLC.                                                     Accession Number: 20181120–5223.
     502–8132, peter.mcbride@ferc.gov.                          Description: Notice of Non-Material                   Comments Due: 5 p.m. ET 12/11/18.
        Deadline for filing comments, motions                Change in Status of Carroll County
                                                                                                                      Docket Numbers: ER19–386–000.
     to intervene, competing applications                    Energy LLC.                                              Applicants: PJM Interconnection,
     (without notices of intent), or notices of                 Filed Date: 11/20/18.                              L.L.C.
     intent to file competing applications: 60                  Accession Number: 20181120–5254.                      Description: § 205(d) Rate Filing:
     days from the issuance of this notice.                     Comments Due: 5 p.m. ET 12/11/18.                  Amendment to ISA, SA No. 2278,
     Competing applications and notices of                      Docket Numbers: ER18–2516–000.                     Queue# None (Consent) to be effective
     intent must meet the requirements of 18                    Applicants: Willow Springs Solar,                  4/1/2010.
     CFR 4.36.                                               LLC.                                                     Filed Date: 11/21/18.
        The Commission strongly encourages                      Description: Amendment to                             Accession Number: 20181121–5054.
     electronic filing. Please file comments,                September 28, 2018 Willow Springs                        Comments Due: 5 p.m. ET 12/12/18.
     motions to intervene, notices of intent,                Solar, LLC tariff filing.                                Docket Numbers: ER19–387–000.
     and competing applications using the                       Filed Date: 11/20/18.                                 Applicants: PJM Interconnection,
     Commission’s eFiling system at http://                     Accession Number: 20181120–5219.                   L.L.C.
     www.ferc.gov/docs-filing/efiling.asp.                      Comments Due: 5 p.m. ET 11/27/18.                     Description: § 205(d) Rate Filing:
     Commenters can submit brief comments                       Docket Numbers: ER19–104–001.                      Original ISA and CSA, SA Nos. 5231
     up to 6,000 characters, without prior                      Applicants: El Paso Electric Company.              and 5232; Queue No. AC1–048/AC2–
     registration, using the eComment system                    Description: Tariff Amendment:                     053 to be effective 10/23/2018.
     at http://www.ferc.gov/docs-filing/                     Concurrence of EPE to APS Service                        Filed Date: 11/21/18.
     ecomment.asp. You must include your                     Agreement No. 367 to be effective                        Accession Number: 20181121–5061.
     name and contact information at the end                 9/7/2018.                                                Comments Due: 5 p.m. ET 12/12/18.
     of your comments. For assistance,                          Filed Date: 11/20/18.                                 Take notice that the Commission
     please contact FERC Online Support at                      Accession Number: 20181120–5167.                   received the following qualifying
     FERCOnlineSupport@ferc.gov, (866)                          Comments Due: 5 p.m. ET 12/11/18.                  facility filings:


VerDate Sep<11>2014   16:19 Nov 27, 2018   Jkt 247001   PO 00000   Frm 00010   Fmt 4703   Sfmt 4703   E:\FR\FM\28NON1.SGM   28NON1


     61154                    Federal Register / Vol. 83, No. 229 / Wednesday, November 28, 2018 / Notices

        Docket Numbers: QF18–452–000.                        that the total horsepower utilized at                 must mail a copy to the applicant and
        Applicants: North American Natural                   Compressor Station 610 will not exceed                to every other party. Only parties to the
     Resources, Inc.                                         the station’s total certificated                      proceeding can ask for court review of
        Description: Refund Report of North                  horsepower of 40,000 horsepower, all as               Commission orders in the proceeding.
     American Natural Resources, Inc.                        more fully set forth in the application                  However, a person does not have to
        Filed Date: 11/20/18.                                which is on file with the Commission                  intervene in order to have comments
        Accession Number: 20181120–5217.                     and open to public inspection. The                    considered. The second way to
        Comments Due: 5 p.m. ET 12/11/18.                    filing may also be viewed on the web at               participate is by filing with the
        The filings are accessible in the                    http://www.ferc.gov using the eLibrary                Secretary of the Commission, as soon as
     Commission’s eLibrary system by                         link. Enter the docket number excluding               possible, an original and two copies of
     clicking on the links or querying the                   the last three digits in the docket                   comments in support of or in opposition
     docket number.                                          number field to access the document.                  to this project. The Commission will
        Any person desiring to intervene or                  For assistance, contact FERC at                       consider these comments in
     protest in any of the above proceedings                 FERCOnlineSupport@ferc.gov or call                    determining the appropriate action to be
     must file in accordance with Rules 211                  toll-free, (866) 208–3676 or TTY, (202)               taken, but the filing of a comment alone
     and 214 of the Commission’s                             502–8659.                                             will not serve to make the filer a party
     Regulations (18 CFR 385.211 and                            Any questions regarding the                        to the proceeding. The Commission’s
     385.214) on or before 5:00 p.m. Eastern                 application should be directed to Bill                rules require that persons filing
     time on the specified comment date.                     Hammons at Transcontinental Gas Pipe                  comments in opposition to the project
     Protests may be considered, but                         Line Company, LLC, Post Office Box                    provide copies of their protests only to
     intervention is necessary to become a                   1396, Houston, TX 77251 or at (713)                   the party or parties directly involved in
     party to the proceeding.                                215–2130.                                             the protest.
        eFiling is encouraged. More detailed                    Pursuant to section 157.9 of the                      Persons who wish to comment only
     information relating to filing                          Commission’s rules (18 CFR 157.9),                    on the environmental review of this
     requirements, interventions, protests,                  within 90 days of this Notice, the                    project should submit an original and
     service, and qualifying facilities filings              Commission staff will either: Complete                two copies of their comments to the
     can be found at: http://www.ferc.gov/                   its environmental assessment (EA) and                 Secretary of the Commission.
                                                             place it into the Commission’s public                 Environmental commentors will be
     docs-filing/efiling/filing-req.pdf. For
                                                             record (eLibrary) for this proceeding; or             placed on the Commission’s
     other information, call (866) 208–3676
                                                             issue a Notice of Schedule for                        environmental mailing list and will be
     (toll free). For TTY, call (202) 502–8659.
                                                             Environmental Review. If a Notice of                  notified of any meetings associated with
       Dated: November 21, 2018.                             Schedule for Environmental Review is                  the Commission’s environmental review
     Nathaniel J. Davis, Sr.,                                issued, it will indicate, among other                 process. Environmental commentors
     Deputy Secretary.                                       milestones, the anticipated date for the              will not be required to serve copies of
     [FR Doc. 2018–25925 Filed 11–27–18; 8:45 am]            Commission staff’s issuance of the final              filed documents on all other parties.
     BILLING CODE 6717–01–P                                  environmental impact statement (FEIS)                 However, the non-party commentors
                                                             or EA for this proposal. The filing of the            will not receive copies of all documents
                                                             EA in the Commission’s public record                  filed by other parties or issued by the
     DEPARTMENT OF ENERGY                                    for this proceeding or the issuance of a              Commission and will not have the right
                                                             Notice of Schedule for Environmental                  to seek court review of the
     Federal Energy Regulatory                               Review will serve to notify federal and               Commission’s final order.
     Commission                                              state agencies of the timing for the                     As of the February 27, 2018 date of
     [Docket No. CP15–138–005]                               completion of all necessary reviews, and              the Commission’s order in Docket No.
                                                             the subsequent need to complete all                   CP16–4–001, the Commission will
     Notice of Application: Transcontinental                 federal authorizations within 90 days of              apply its revised practice concerning
     Gas Pipe Line Company, LLC                              the date of issuance of the Commission                out-of-time motions to intervene in any
                                                             staff’s FEIS or EA.                                   new Natural Gas Act section 3 or section
        Take notice that on November 14,                        There are two ways to become                       7 proceeding.1 Persons desiring to
     2018, Transcontinental Gas Pipe Line                    involved in the Commission’s review of                become a party to a certificate
     Company, LLC (Transco), P.O. Box                        this project. First, any person wishing to            proceeding are to intervene in a timely
     1396, Houston, TX 77251–1396, filed an                  obtain legal status by becoming a party               manner. If seeking to intervene out-of-
     application under section 7(c) of the                   to the proceedings for this project                   time, the movant is required to show
     Natural Gas Act (NGA) requesting                        should, on or before the comment date                 good cause why the time limitation
     authorization to amend its certificate of               stated below file with the Federal                    should be waived, and should provide
     public convenience and necessity,                       Energy Regulatory Commission, 888                     justification by reference to factors set
     granted by the Commission on February                   First Street NE, Washington, DC 20426,                forth in Rule 214(d)(1) of the
     3, 2017 in Docket No. CP15–138, which                   a motion to intervene in accordance                   Commission’s Rules and Regulations.2
     authorized the Atlantic Sunrise Project.                with the requirements of the                             The Commission strongly encourages
     Herein, Transco requests authorization                  Commission’s Rules of Practice and                    electronic filings of comments, protests
     to amend its Atlantic Sunrise Project                   Procedure (18 CFR 385.214 or 385.211)                 and interventions in lieu of paper using
     certificate to allow any of the existing                and the Regulations under the NGA (18                 the eFiling link at http://www.ferc.gov.
     compressor units at Compressor Station                  CFR 157.10). A person obtaining party                 Persons unable to file electronically
     605 and Compressor Station 610 to be                    status will be placed on the service list             should submit an original and 3 copies
     operated above their currently                          maintained by the Secretary of the                    of the protest or intervention to the
     certificated horsepower. Transco states                 Commission and will receive copies of                 Federal Energy Regulatory Commission,
     that the total horsepower utilized at                   all documents filed by the applicant and
     Compressor Station 605 will not exceed                  by all other parties. A party must submit               1 Tennessee Gas Pipeline Company, L.L.C., 162
     the station’s total certificated                        3 copies of filings made in the                       FERC 61,167 at 50 (2018).
     horsepower of 30,000 horsepower and                     proceeding with the Commission and                      2 18 CFR 385.214(d)(1).




VerDate Sep<11>2014   16:19 Nov 27, 2018   Jkt 247001   PO 00000   Frm 00011   Fmt 4703   Sfmt 4703   E:\FR\FM\28NON1.SGM   28NON1



Document Created: 2018-11-27 23:49:05
Document Modified: 2018-11-27 23:49:05
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates11/20/18.
FR Citation83 FR 61153 