83_FR_63090 83 FR 62856 - Town of Snowmass Village, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

83 FR 62856 - Town of Snowmass Village, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 234 (December 6, 2018)

Page Range62856-62856
FR Document2018-26349

Federal Register, Volume 83 Issue 234 (Thursday, December 6, 2018)
[Federal Register Volume 83, Number 234 (Thursday, December 6, 2018)]
[Notices]
[Page 62856]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-26349]



[[Page 62856]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD19-2-000]


Town of Snowmass Village, Colorado; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On November 14, 2018, the Town of Snowmass Village, Colorado filed 
a notice of intent to construct a qualifying conduit hydropower 
facility, pursuant to section 30 of the Federal Power Act (FPA), as 
amended by section 4 of the Hydropower Regulatory Efficiency Act of 
2013 (HREA). The proposed Snowmass Village PRV Hydro Project would have 
a total installed capacity up to 22 kilowatts (kW), and would be 
located on the existing Snowmass Village distribution pipeline. The 
project would be located near the Town of Snowmass Village in Pitkin 
County, Colorado.
    Applicant Contact: Travis Elliott, Town of Snowmass Village, 
Colorado, P.O. Box 5010, 130 Kearns Road, Snowmass Village, CO 81615, 
Phone No (970) 922-2275, email: [email protected].
    FERC Contact: Robert Bell, Phone No. (202) 502-6062; Email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A 22-kW turbine-generator connected to an 
existing underground PRV vault on the water distribution pipeline, and 
(2) appurtenant facilities. The proposed project would have an 
estimated annual generation of up to 70 megawatt-hours. A qualifying 
conduit hydropower facility is one that is determined or deemed to meet 
all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision             Description        Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by  The conduit the         Y
 HREA.                           facility uses is a
                                 tunnel, canal,
                                 pipeline, aqueduct,
                                 flume, ditch, or
                                 similar manmade water
                                 conveyance that is
                                 operated for the
                                 distribution of water
                                 for agricultural,
                                 municipal, or
                                 industrial
                                 consumption and not
                                 primarily for the
                                 generation of
                                 electricity.
FPA 30(a)(3)(C)(i), as amended  The facility is         Y
 by HREA.                        constructed,
                                 operated, or
                                 maintained for the
                                 generation of
                                 electric power and
                                 uses for such
                                 generation only the
                                 hydroelectric
                                 potential of a non-
                                 federally owned
                                 conduit.
FPA 30(a)(3)(C)(ii), as         The facility has an     Y
 amended by HREA.                installed capacity
                                 that does not exceed
                                 5 megawatts.
FPA 30(a)(3)(C)(iii), as        On or before August 9,  Y
 amended by HREA.                2013, the facility is
                                 not licensed, or
                                 exempted from the
                                 licensing
                                 requirements of Part
                                 I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination:
    The proposed Snowmass Village PRV Hydro Project will not interfere 
with the primary purpose of the conduit, which is to transport water 
for irrigation by filling an equalizing reservoir, which in turn 
provides pressure for an irrigation zone in its service area. 
Therefore, based upon the above criteria, Commission staff 
preliminarily determines that the proposal satisfies the requirements 
for a qualifying conduit hydropower facility, which is not required to 
be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 30 
days from the issuance date of this notice. Deadline for filing motions 
to intervene is 30 days from the issuance date of this notice. Anyone 
may submit comments or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 
385.214. Any motions to intervene must be received on or before the 
specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2018).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE, Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD19-2) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: November 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-26349 Filed 12-4-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               62856                      Federal Register / Vol. 83, No. 234 / Thursday, December 6, 2018 / Notices

                                               DEPARTMENT OF ENERGY                                    (FPA), as amended by section 4 of the                   FERC Contact: Robert Bell, Phone No.
                                                                                                       Hydropower Regulatory Efficiency Act                  (202) 502–6062; Email: robert.bell@
                                               Federal Energy Regulatory                               of 2013 (HREA). The proposed                          ferc.gov.
                                               Commission                                              Snowmass Village PRV Hydro Project                      Qualifying Conduit Hydropower
                                                                                                       would have a total installed capacity up
                                               [Docket No. CD19–2–000]                                                                                       Facility Description: The proposed
                                                                                                       to 22 kilowatts (kW), and would be
                                                                                                                                                             project would consist of: (1) A 22-kW
                                               Town of Snowmass Village, Colorado;                     located on the existing Snowmass
                                                                                                       Village distribution pipeline. The                    turbine-generator connected to an
                                               Notice of Preliminary Determination of                                                                        existing underground PRV vault on the
                                               a Qualifying Conduit Hydropower                         project would be located near the Town
                                                                                                       of Snowmass Village in Pitkin County,                 water distribution pipeline, and (2)
                                               Facility and Soliciting Comments and                                                                          appurtenant facilities. The proposed
                                               Motions To Intervene                                    Colorado.
                                                                                                         Applicant Contact: Travis Elliott,                  project would have an estimated annual
                                                 On November 14, 2018, the Town of                     Town of Snowmass Village, Colorado,                   generation of up to 70 megawatt-hours.
                                               Snowmass Village, Colorado filed a                      P.O. Box 5010, 130 Kearns Road,                       A qualifying conduit hydropower
                                               notice of intent to construct a qualifying              Snowmass Village, CO 81615, Phone No                  facility is one that is determined or
                                               conduit hydropower facility, pursuant                   (970) 922–2275, email: telliott@                      deemed to meet all of the criteria shown
                                               to section 30 of the Federal Power Act                  tosv.com.                                             in the table below.

                                                                                 TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                       Satisfies
                                                        Statutory provision                                                 Description                                                 (Y/N)

                                               FPA 30(a)(3)(A), as amended by             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct,          Y
                                                 HREA.                                      flume, ditch, or similar manmade water conveyance that is oper-
                                                                                            ated for the distribution of water for agricultural, municipal, or in-
                                                                                            dustrial consumption and not primarily for the generation of elec-
                                                                                            tricity.
                                               FPA 30(a)(3)(C)(i), as amended by          The facility is constructed, operated, or maintained for the generation        Y
                                                 HREA.                                      of electric power and uses for such generation only the hydro-
                                                                                            electric potential of a non-federally owned conduit.
                                               FPA 30(a)(3)(C)(ii), as amended by         The facility has an installed capacity that does not exceed 5                  Y
                                                 HREA.                                      megawatts.
                                               FPA 30(a)(3)(C)(iii), as amended by        On or before August 9, 2013, the facility is not licensed, or exempted         Y
                                                 HREA.                                      from the licensing requirements of Part I of the FPA.



                                                  Preliminary Determination:                           CONDUIT HYDROPOWER FACILITY’’                         send a paper copy to: Secretary, Federal
                                                  The proposed Snowmass Village PRV                    or ‘‘MOTION TO INTERVENE,’’ as                        Energy Regulatory Commission, 888
                                               Hydro Project will not interfere with the               applicable; (2) state in the heading the              First Street NE, Washington, DC 20426.
                                               primary purpose of the conduit, which                   name of the applicant and the project                 A copy of all other filings in reference
                                               is to transport water for irrigation by                 number of the application to which the                to this application must be accompanied
                                               filling an equalizing reservoir, which in               filing responds; (3) state the name,                  by proof of service on all persons listed
                                               turn provides pressure for an irrigation                address, and telephone number of the                  in the service list prepared by the
                                               zone in its service area. Therefore, based              person filing; and (4) otherwise comply               Commission in this proceeding, in
                                               upon the above criteria, Commission                     with the requirements of sections                     accordance with 18 CFR 4.34(b) and
                                               staff preliminarily determines that the                 385.2001 through 385.2005 of the                      385.2010.
                                               proposal satisfies the requirements for a               Commission’s regulations.1 All
                                               qualifying conduit hydropower facility,                 comments contesting Commission staff’s                  Locations of Notice of Intent: Copies
                                               which is not required to be licensed or                 preliminary determination that the                    of the notice of intent can be obtained
                                               exempted from licensing.                                facility meets the qualifying criteria                directly from the applicant or such
                                                  Comments and Motions to Intervene:                   must set forth their evidentiary basis.               copies can be viewed and reproduced at
                                               Deadline for filing comments contesting                    The Commission strongly encourages                 the Commission in its Public Reference
                                               whether the facility meets the qualifying               electronic filing. Please file motions to             Room, Room 2A, 888 First Street NE,
                                               criteria is 30 days from the issuance                   intervene and comments using the                      Washington, DC 20426. The filing may
                                               date of this notice. Deadline for filing                Commission’s eFiling system at http://                also be viewed on the web at http://
                                               motions to intervene is 30 days from the                www.ferc.gov/docs-filing/efiling.asp.                 www.ferc.gov/docs-filing/elibrary.asp
                                               issuance date of this notice. Anyone                    Commenters can submit brief comments                  using the ‘‘eLibrary’’ link. Enter the
                                               may submit comments or a motion to                      up to 6,000 characters, without prior                 docket number (i.e., CD19–2) in the
                                               intervene in accordance with the                        registration, using the eComment system               docket number field to access the
                                               requirements of Rules of Practice and                   at http://www.ferc.gov/docs-filing/                   document. For assistance, call toll-free
                                               Procedure, 18 CFR 385.210 and 385.214.                  ecomment.asp. You must include your                   1–866–208–3676 or email
                                               Any motions to intervene must be                        name and contact information at the end               FERCOnlineSupport@ferc.gov. For TTY,
khammond on DSK30JT082PROD with NOTICES




                                               received on or before the specified                     of your comments. For assistance,                     call (202) 502–8659.
                                               deadline date for the particular                        please contact FERC Online Support at                   Dated: November 28, 2018.
                                               proceeding.                                             FERCOnlineSupport@ferc.gov, (866)
                                                                                                                                                             Kimberly D. Bose,
                                                  Filing and Service of Responsive                     208–3676 (toll free), or (202) 502–8659
                                               Documents: All filings must (1) bear in                 (TTY). In lieu of electronic filing, please           Secretary.
                                               all capital letters the ‘‘COMMENTS                                                                            [FR Doc. 2018–26349 Filed 12–4–18; 8:45 am]
                                               CONTESTING QUALIFICATION FOR A                            1 18   CFR 385.2001–2005 (2018).                    BILLING CODE 6717–01–P




                                          VerDate Sep<11>2014   20:35 Dec 04, 2018   Jkt 247001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\06DEN1.SGM   06DEN1



Document Created: 2018-12-05 02:35:50
Document Modified: 2018-12-05 02:35:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 62856 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR