83_FR_8293 83 FR 8255 - Brooke County Access I, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Brooke County Access Project and Request for Comments on Environmental Issues

83 FR 8255 - Brooke County Access I, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Brooke County Access Project and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 38 (February 26, 2018)

Page Range8255-8257
FR Document2018-03822

Federal Register, Volume 83 Issue 38 (Monday, February 26, 2018)
[Federal Register Volume 83, Number 38 (Monday, February 26, 2018)]
[Notices]
[Pages 8255-8257]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-03822]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF18-2-000]


Brooke County Access I, LLC; Notice of Intent To Prepare an 
Environmental Assessment for the Planned Brooke County Access Project 
and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Brook County Access Project 
involving construction and operation of facilities by Brooke County 
Access I, LLC (BCAI), in Washington County, Pennsylvania and Brooke 
County, West Virginia. The Commission will use this EA in its decision-
making process to determine whether the project is in the public 
convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before March 22, 2018.
    If you sent comments on this project to the Commission before the 
opening of this docket on October 17, 2017, you will need to file those 
comments in Docket No. PF18-2-000 to ensure they are considered as part 
of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the planned facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    A fact sheet prepared by the FERC entitled An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know? is available for 
viewing on the FERC website (www.ferc.gov). This fact sheet addresses a 
number of typically asked questions, including the use of eminent 
domain and how to participate in the Commission's proceedings.

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow 
these instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
eRegister. If you are filing a comment on a particular project, please 
select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(PF18-2-000) with your submission: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, 
DC 20426.

Summary of the Planned Project

    BCAI plans to construct and operate a varying diameter natural gas 
transmission pipeline from interconnects with Energy Transfer Partner's 
Revolution Cryogenic Facility and the National Fuel Gas Supply 
Corporation's (National Fuel) Line N natural gas mainline in Washington 
County, Pennsylvania, to a proposed

[[Page 8256]]

combined-cycle power facility (Power Facility) in Brooke County, West 
Virginia. The Brooke County Access Project would provide about 130 
million standard cubic feet of natural gas per day to the Power 
Facility.
    The Project includes the construction and operation of the 
following facilities:
     Approximately 16 miles of new 16- to 20-inch-diameter 
natural gas pipeline;
     bi-directional pig launcher and receiver system on each 
end of the new pipelines; \1\ and
---------------------------------------------------------------------------

    \1\ A pig is a tool that the pipeline company inserts into and 
pushes through the pipeline for cleaning the pipeline, conducting 
internal inspections, or other purposes.
---------------------------------------------------------------------------

     three new meter stations and mainline valve settings at 
milepost 0.0 at the Revolution Cryogenic Plant interconnect, milepost 
2.21 at the National Fuel interconnect, and at milepost 15.57 inside 
the Power Facility.
    The general location of the project facilities is shown in appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
www.ferc.gov using the link called eLibrary or from the Commission's 
Public Reference Room, 888 First Street NE, Washington, DC 20426, or 
call (202) 502-8371. For instructions on connecting to eLibrary, 
refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the planned facilities would disturb about 225 
acres of land for the aboveground facilities and the pipeline. 
Following construction, BCAI would maintain about 105 acres for 
permanent operation of the projects facilities; the remaining acreage 
would be restored and revert to former uses. About 27 percent of the 
planned pipeline route parallels existing pipeline, utility, or road 
rights-of-way.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\3\ to discover and address concerns the public may have about 
proposals. This process is referred to as scoping. The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \3\ We, us, and our refer to the environmental staff of the 
Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the planned project under these 
general headings:
     Geology and soils;
     water resources, fisheries, and wetlands;
     vegetation and wildlife;
     endangered and threatened species;
     cultural resources;
     land use;
     air quality and noise;
     public safety; and
     cumulative impacts.
    We will also evaluate possible alternatives to the planned project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    Although no formal application has been filed, we have already 
initiated our NEPA review under the Commission's pre-filing process. 
The purpose of the pre-filing process is to encourage early involvement 
of interested stakeholders and to identify and resolve issues before 
the FERC receives an application. As part of our pre-filing review, we 
have begun to contact some federal and state agencies to discuss their 
involvement in the scoping process and the preparation of the EA.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before we make our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues 
related to this project to formally cooperate with us in the 
preparation of the EA.\4\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40 of the Code of 
Federal Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office(s), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\5\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO(s) as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; Native 
American Tribes; other interested parties; and local libraries and 
newspapers. This list also includes all affected landowners (as defined 
in the Commission's regulations) who are potential right-of-way 
grantors, whose property may be used temporarily for project purposes, 
or who own homes within certain distances of aboveground facilities, 
and anyone who submits comments on the project. We will update the 
environmental mailing list as the analysis proceeds to ensure that we 
send the information related to this environmental review to all 
individuals, organizations, and government entities interested in and/
or potentially affected by the planned project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

[[Page 8257]]

Becoming an Intervenor

    Once BCAI files its application with the Commission, you may want 
to become an intervenor which is an official party to the Commission's 
proceeding. Intervenors play a more formal role in the process and are 
able to file briefs, appear at hearings, and be heard by the courts if 
they choose to appeal the Commission's final ruling. An intervenor 
formally participates in the proceeding by filing a request to 
intervene. Motions to intervene are more fully described at http://www.ferc.gov/resources/guides/how-to/intervene.asp. Instructions for 
becoming an intervenor are in the Document-less Intervention Guide 
under the e-filing link on the Commission's website. Please note that 
the Commission will not accept requests for intervenor status at this 
time. You must wait until the Commission receives a formal application 
for the project.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., PF18-
2). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: February 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-03822 Filed 2-23-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                            Federal Register / Vol. 83, No. 38 / Monday, February 26, 2018 / Notices                                            8255

                                               by Boyce Hydro to comply with the                        DEPARTMENT OF ENERGY                                 conveys with it the right of eminent
                                               Compliance Order, we propose                                                                                  domain. Therefore, if easement
                                               revocation of the project license.21                     Federal Energy Regulatory                            negotiations fail to produce an
                                                                                                        Commission                                           agreement, the pipeline company could
                                                  11. The licensee may request an
                                                                                                        [Docket No. PF18–2–000]                              initiate condemnation proceedings
                                               evidentiary hearing before an
                                                                                                                                                             where compensation would be
                                               Administrative Law Judge within 30
                                                                                                        Brooke County Access I, LLC; Notice                  determined in accordance with state
                                               days of this issuance date of this                                                                            law.
                                                                                                        of Intent To Prepare an Environmental
                                               order.22 If, within 30 days, the licensee                                                                       A fact sheet prepared by the FERC
                                                                                                        Assessment for the Planned Brooke
                                               requests a hearing, the Commission will                                                                       entitled An Interstate Natural Gas
                                                                                                        County Access Project and Request
                                               set the matter for hearing. If the licensee              for Comments on Environmental                        Facility On My Land? What Do I Need
                                               does not request a hearing, the                          Issues                                               To Know? is available for viewing on
                                               Commission will decide this matter                                                                            the FERC website (www.ferc.gov). This
                                               based on the written record. Any                            The staff of the Federal Energy                   fact sheet addresses a number of
                                               interested person may file a motion to                   Regulatory Commission (FERC or                       typically asked questions, including the
                                               intervene in accordance with the                         Commission) will prepare an                          use of eminent domain and how to
                                               requirements of the Commission’s Rules                   environmental assessment (EA) that will              participate in the Commission’s
                                               of Practice and Procedure (18 CFR                        discuss the environmental impacts of                 proceedings.
                                               385.214). A person does not have to                      the Brook County Access Project
                                                                                                        involving construction and operation of              Public Participation
                                               intervene in order to have comments
                                                                                                        facilities by Brooke County Access I,                   For your convenience, there are three
                                               considered. Any person may file with
                                                                                                        LLC (BCAI), in Washington County,                    methods you can use to submit your
                                               the Secretary of the Commission,                         Pennsylvania and Brooke County, West                 comments to the Commission. The
                                               comments in support of or in opposition                  Virginia. The Commission will use this               Commission encourages electronic filing
                                               to the proposed revocation. The                          EA in its decision-making process to                 of comments and has expert staff
                                               Commission will consider these                           determine whether the project is in the              available to assist you at (202) 502–8258
                                               comments in determining the                              public convenience and necessity.                    or FercOnlineSupport@ferc.gov. Please
                                               appropriate action to be taken, but the                     This notice announces the opening of              carefully follow these instructions so
                                               filing of a comment alone will not serve                 the scoping process the Commission                   that your comments are properly
                                               to make the filer a party to the                         will use to gather input from the public             recorded.
                                               proceeding.                                              and interested agencies on the project.                 (1) You can file your comments
                                                                                                        You can make a difference by providing               electronically using the eComment
                                               The Commission Orders                                    us with your specific comments or                    feature on the Commission’s website
                                                  (A) Pursuant to section 31(b) of the                  concerns about the project. Your                     (www.ferc.gov) under the link to
                                               FPA, 16 U.S.C. 823b(b) (2012), the                       comments should focus on the potential               Documents and Filings. This is an easy
                                               Commission proposes to revoke the                        environmental effects, reasonable                    method for submitting brief, text-only
                                               license for the Edenville Project No.                    alternatives, and measures to avoid or               comments on a project;
                                               10808.                                                   lessen environmental impacts. Your                      (2) You can file your comments
                                                                                                        input will help the Commission staff                 electronically by using the eFiling
                                                  (B) Boyce Hydro may request an                        determine what issues they need to                   feature on the Commission’s website
                                               evidentiary hearing within 30 days of                    evaluate in the EA. To ensure that your              (www.ferc.gov) under the link to
                                               the issuance date of this order.                         comments are timely and properly                     Documents and Filings. With eFiling,
                                                 By the Commission.                                     recorded, please send your comments so               you can provide comments in a variety
                                                 Issued February 15, 2018.                              that the Commission receives them in                 of formats by attaching them as a file
                                                                                                        Washington, DC on or before March 22,                with your submission. New eFiling
                                               Kimberly D. Bose,
                                                                                                        2018.                                                users must first create an account by
                                               Secretary.                                                  If you sent comments on this project              clicking on eRegister. If you are filing a
                                               [FR Doc. 2018–03821 Filed 2–23–18; 8:45 am]              to the Commission before the opening of              comment on a particular project, please
                                               BILLING CODE 6717–01–P                                   this docket on October 17, 2017, you                 select ‘‘Comment on a Filing’’ as the
                                                                                                        will need to file those comments in                  filing type; or
                                                                                                        Docket No. PF18–2–000 to ensure they                    (3) You can file a paper copy of your
                                                                                                        are considered as part of this                       comments by mailing them to the
                                               regulate dam safety and other issues related to the      proceeding.                                          following address. Be sure to reference
                                               dam and impoundment would transfer to the state).           This notice is being sent to the
                                                  21 Revocation of the Edenville Project license does
                                                                                                                                                             the project docket number (PF18–2–000)
                                                                                                        Commission’s current environmental                   with your submission: Kimberly D.
                                               not mandate removal or any modification of the
                                                                                                        mailing list for this project. State and             Bose, Secretary, Federal Energy
                                               dam. While, the Commission has broad authority to
                                               fashion appropriate remedies to further the goals of
                                                                                                        local government representatives should              Regulatory Commission, 888 First Street
                                               the FPA in a manner that is necessary and                notify their constituents of this planned            NE, Room 1A, Washington, DC 20426.
                                               appropriate to carry out the revocation of this          project and encourage them to comment
                                               license, as a general rule, we do not condition the      on their areas of concern.                           Summary of the Planned Project
                                               effectiveness of a license revocation by imposing           If you are a landowner receiving this                BCAI plans to construct and operate
                                               additional requirements on a licensee that has           notice, a pipeline company                           a varying diameter natural gas
daltland on DSKBBV9HB2PROD with NOTICES




                                               shown its unwillingness to comply with other             representative may contact you about                 transmission pipeline from
                                               Commission orders. Eastern Hydroelectric Corp.,
                                                                                                        the acquisition of an easement to                    interconnects with Energy Transfer
                                               149 FERC 61,036 at P 33 (declining request to order
                                               removal of all project facilities including the dam
                                                                                                        construct, operate, and maintain the                 Partner’s Revolution Cryogenic Facility
                                               and instead only requiring licensee to disable all of    planned facilities. The company would                and the National Fuel Gas Supply
                                               the project’s generating equipment to prevent            seek to negotiate a mutually acceptable              Corporation’s (National Fuel) Line N
                                               operation of the project).                               agreement. However, if the Commission                natural gas mainline in Washington
                                                  22 See 16 U.S.C. 823b(b) (2012).                      approves the project, that approval                  County, Pennsylvania, to a proposed


                                          VerDate Sep<11>2014   17:58 Feb 23, 2018   Jkt 244001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\26FEN1.SGM   26FEN1


                                               8256                         Federal Register / Vol. 83, No. 38 / Monday, February 26, 2018 / Notices

                                               combined-cycle power facility (Power                    filed comments during the preparation                 Consultations Under Section 106 of the
                                               Facility) in Brooke County, West                        of the EA.                                            National Historic Preservation Act
                                               Virginia. The Brooke County Access                         In the EA we will discuss impacts that
                                               Project would provide about 130 million                 could occur as a result of the                          In accordance with the Advisory
                                               standard cubic feet of natural gas per                  construction and operation of the                     Council on Historic Preservation’s
                                               day to the Power Facility.                              planned project under these general                   implementing regulations for section
                                                  The Project includes the construction                headings:                                             106 of the National Historic
                                                                                                                                                             Preservation Act, we are using this
                                               and operation of the following facilities:                 • Geology and soils;
                                                                                                                                                             notice to initiate consultation with the
                                                  • Approximately 16 miles of new 16-                     • water resources, fisheries, and                  applicable State Historic Preservation
                                               to 20-inch-diameter natural gas                         wetlands;                                             Office(s), and to solicit their views and
                                               pipeline;                                                  • vegetation and wildlife;                         those of other government agencies,
                                                  • bi-directional pig launcher and                       • endangered and threatened species;               interested Indian tribes, and the public
                                               receiver system on each end of the new                     • cultural resources;                              on the project’s potential effects on
                                               pipelines; 1 and
                                                                                                          • land use;                                        historic properties.5 We will define the
                                                  • three new meter stations and                                                                             project-specific Area of Potential Effects
                                                                                                          • air quality and noise;
                                               mainline valve settings at milepost 0.0                                                                       (APE) in consultation with the SHPO(s)
                                               at the Revolution Cryogenic Plant                          • public safety; and
                                                                                                                                                             as the project develops. On natural gas
                                               interconnect, milepost 2.21 at the                         • cumulative impacts.
                                                                                                                                                             facility projects, the APE at a minimum
                                               National Fuel interconnect, and at                         We will also evaluate possible                     encompasses all areas subject to ground
                                               milepost 15.57 inside the Power                         alternatives to the planned project or                disturbance (examples include
                                               Facility.                                               portions of the project, and make                     construction right-of-way, contractor/
                                                  The general location of the project                  recommendations on how to lessen or                   pipe storage yards, compressor stations,
                                               facilities is shown in appendix 1.2                     avoid impacts on the various resource                 and access roads). Our EA for this
                                                                                                       areas.                                                project will document our findings on
                                               Land Requirements for Construction                         Although no formal application has                 the impacts on historic properties and
                                                 Construction of the planned facilities                been filed, we have already initiated our             summarize the status of consultations
                                               would disturb about 225 acres of land                   NEPA review under the Commission’s                    under section 106.
                                               for the aboveground facilities and the                  pre-filing process. The purpose of the
                                               pipeline. Following construction, BCAI                  pre-filing process is to encourage early              Environmental Mailing List
                                               would maintain about 105 acres for                      involvement of interested stakeholders
                                                                                                                                                                The environmental mailing list
                                               permanent operation of the projects                     and to identify and resolve issues before
                                                                                                                                                             includes federal, state, and local
                                               facilities; the remaining acreage would                 the FERC receives an application. As
                                                                                                                                                             government representatives and
                                               be restored and revert to former uses.                  part of our pre-filing review, we have
                                                                                                                                                             agencies; elected officials; Native
                                               About 27 percent of the planned                         begun to contact some federal and state
                                                                                                                                                             American Tribes; other interested
                                               pipeline route parallels existing                       agencies to discuss their involvement in
                                                                                                                                                             parties; and local libraries and
                                               pipeline, utility, or road rights-of-way.               the scoping process and the preparation
                                                                                                                                                             newspapers. This list also includes all
                                                                                                       of the EA.
                                               The EA Process                                                                                                affected landowners (as defined in the
                                                                                                          The EA will present our independent                Commission’s regulations) who are
                                                 The National Environmental Policy                     analysis of the issues. The EA will be                potential right-of-way grantors, whose
                                               Act (NEPA) requires the Commission to                   available in the public record through                property may be used temporarily for
                                               take into account the environmental                     eLibrary. Depending on the comments                   project purposes, or who own homes
                                               impacts that could result from an action                received during the scoping process, we               within certain distances of aboveground
                                               whenever it considers the issuance of a                 may also publish and distribute the EA                facilities, and anyone who submits
                                               Certificate of Public Convenience and                   to the public for an allotted comment                 comments on the project. We will
                                               Necessity. NEPA also requires us 3 to                   period. We will consider all comments                 update the environmental mailing list as
                                               discover and address concerns the                       on the EA before we make our                          the analysis proceeds to ensure that we
                                               public may have about proposals. This                   recommendations to the Commission.                    send the information related to this
                                               process is referred to as scoping. The                  To ensure we have the opportunity to                  environmental review to all individuals,
                                               main goal of the scoping process is to                  consider and address your comments,                   organizations, and government entities
                                               focus the analysis in the EA on the                     please carefully follow the instructions              interested in and/or potentially affected
                                               important environmental issues. By this                 in the Public Participation section,                  by the planned project.
                                               notice, the Commission requests public                  beginning on page 2.
                                               comments on the scope of the issues to                     With this notice, we are asking                       If we publish and distribute the EA,
                                               address in the EA. We will consider all                 agencies with jurisdiction by law and/                copies will be sent to the environmental
                                                                                                       or special expertise with respect to the              mailing list for public review and
                                                 1 A pig is a tool that the pipeline company inserts   environmental issues related to this                  comment. If you would prefer to receive
                                               into and pushes through the pipeline for cleaning       project to formally cooperate with us in              a paper copy of the document instead of
                                               the pipeline, conducting internal inspections, or       the preparation of the EA.4 Agencies                  the CD version or would like to remove
                                               other purposes.
                                                                                                       that would like to request cooperating                your name from the mailing list, please
                                                 2 The appendices referenced in this notice will
                                                                                                       agency status should follow the                       return the attached Information Request
                                               not appear in the Federal Register. Copies of the
                                                                                                                                                             (appendix 2).
daltland on DSKBBV9HB2PROD with NOTICES




                                               appendices were sent to all those receiving this        instructions for filing comments
                                               notice in the mail and are available at www.ferc.gov    provided under the Public Participation
                                               using the link called eLibrary or from the                                                                      5 The Advisory Council on Historic Preservation
                                               Commission’s Public Reference Room, 888 First
                                                                                                       section of this notice.
                                                                                                                                                             regulations are at Title 36, Code of Federal
                                               Street NE, Washington, DC 20426, or call (202) 502–                                                           Regulations, Part 800. Those regulations define
                                               8371. For instructions on connecting to eLibrary,         4 The Council on Environmental Quality              historic properties as any prehistoric or historic
                                               refer to the last page of this notice.                  regulations addressing cooperating agency             district, site, building, structure, or object included
                                                 3 We, us, and our refer to the environmental staff    responsibilities are at Title 40 of the Code of       in or eligible for inclusion in the National Register
                                               of the Commission’s Office of Energy Projects.          Federal Regulations, Part 1501.6.                     of Historic Places.



                                          VerDate Sep<11>2014   17:58 Feb 23, 2018   Jkt 244001   PO 00000   Frm 00018   Fmt 4703   Sfmt 4703   E:\FR\FM\26FEN1.SGM   26FEN1


                                                                            Federal Register / Vol. 83, No. 38 / Monday, February 26, 2018 / Notices                                                  8257

                                               Becoming an Intervenor                                  DEPARTMENT OF ENERGY                                  Online service, please email
                                                                                                                                                             FERCOnlineSupport@ferc.gov, or call
                                                  Once BCAI files its application with                 Federal Energy Regulatory                             (866) 208–3676 (toll free). For TTY, call
                                               the Commission, you may want to                         Commission                                            (202) 502–8659.
                                               become an intervenor which is an                                                                                Comment Date: 5:00 p.m. Eastern
                                               official party to the Commission’s                      [Docket No. EL18–61–000]
                                                                                                                                                             Time on March 12, 2018.
                                               proceeding. Intervenors play a more                     Public Citizen, Inc. v. PJM
                                               formal role in the process and are able                                                                         Dated: February 20, 2018.
                                                                                                       Interconnection LLC; Notice of                        Kimberly D. Bose,
                                               to file briefs, appear at hearings, and be              Complaint
                                               heard by the courts if they choose to                                                                         Secretary.
                                               appeal the Commission’s final ruling.                      Take notice that on February 20, 2018,             [FR Doc. 2018–03820 Filed 2–23–18; 8:45 am]
                                               An intervenor formally participates in                  pursuant to section 206 of the Federal                BILLING CODE 6717–01–P
                                               the proceeding by filing a request to                   Power Act, 16 U.S.C. 824e and 825d and
                                               intervene. Motions to intervene are                     Rule 206 of the Federal Energy
                                               more fully described at http://                         Regulatory Commission’s (FERC or                      DEPARTMENT OF ENERGY
                                               www.ferc.gov/resources/guides/how-to/                   Commission) Rules of Practice and
                                               intervene.asp. Instructions for becoming                Procedure, 18 CFR 385.206, Public                     Federal Energy Regulatory
                                               an intervenor are in the Document-less                  Citizen, Inc. (Complainant) filed a                   Commission
                                               Intervention Guide under the e-filing                   formal complaint against PJM
                                                                                                       Interconnection LLC (PJM or                           Combined Notice of Filings
                                               link on the Commission’s website.
                                               Please note that the Commission will                    Respondent) alleging that PJM failed to                 Take notice that the Commission has
                                               not accept requests for intervenor status               disclose millions of dollars in electoral             received the following Natural Gas
                                               at this time. You must wait until the                   campaign contributions and lobbying                   Pipeline Rate and Refund Report filings:
                                               Commission receives a formal                            expenditures to its stakeholders or to
                                               application for the project.                            FERC, in violation of Commission                      Filings Instituting Proceedings
                                                                                                       precedent and potential violation of just                Docket Numbers: CP18–83–000.
                                               Additional Information                                  and reasonable rates, all as more fully                  Applicants: Gulf Crossing Pipeline
                                                  Additional information about the                     explained in the complaint.                           Company LLC.
                                                                                                          The Complainant certifies that a copy
                                               project is available from the                                                                                    Description: Gulf Crossing Pipeline
                                                                                                       of the complaint has been served on the
                                               Commission’s Office of External Affairs,                                                                      Company LLC and Enable Oklahoma
                                                                                                       Respondent.
                                               at (866) 208–FERC, or on the FERC                                                                             Intrastate Transmission, LLC—
                                                                                                          Any person desiring to intervene or to
                                               website (www.ferc.gov) using the                                                                              Abbreviated Joint Application for
                                                                                                       protest this filing must file in
                                               eLibrary link. Click on the eLibrary link,                                                                    Authorization to Abandon a Lease of
                                                                                                       accordance with Rules 211 and 214 of
                                               click on ‘‘General Search’’ and enter the                                                                     Capacity.
                                                                                                       the Commission’s Rules of Practice and
                                               docket number, excluding the last three                                                                          Filed Date: 2/09/18.
                                                                                                       Procedure (18 CFR 385.211, 385.214).
                                               digits in the Docket Number field (i.e.,                                                                         Accession Number: 20180209–5226.
                                                                                                       Protests will be considered by the
                                               PF18–2). Be sure you have selected an                                                                            Comments Due: 5 p.m. ET 2/21/18.
                                                                                                       Commission in determining the
                                               appropriate date range. For assistance,
                                                                                                       appropriate action to be taken, but will                 Docket Numbers: RP18–437–000.
                                               please contact FERC Online Support at
                                                                                                       not serve to make protestants parties to                 Applicants: Guardian Pipeline, L.L.C.
                                               FercOnlineSupport@ferc.gov or toll free
                                                                                                       the proceeding. Any person wishing to                    Description: § 4(d) Rate Filing:
                                               at (866) 208–3676, or for TTY, contact
                                                                                                       become a party must file a notice of                  Revisions to OSS/LBS Statement of
                                               (202) 502–8659. The eLibrary link also
                                                                                                       intervention or motion to intervene, as               Rates to be effective 4/1/2018.
                                               provides access to the texts of formal
                                                                                                       appropriate. The Respondent’s answer                     Filed Date: 2/12/18.
                                               documents issued by the Commission,
                                                                                                       and all interventions, or protests must                  Accession Number: 20180212–5061.
                                               such as orders, notices, and
                                                                                                       be filed on or before the comment date.
                                               rulemakings.                                                                                                     Comments Due: 5 p.m. ET 2/26/18.
                                                                                                       The Respondent’s answer, motions to
                                                  In addition, the Commission offers a                 intervene, and protests must be served                   The filings are accessible in the
                                               free service called eSubscription which                 on the Complainants.                                  Commission’s eLibrary system by
                                               allows you to keep track of all formal                     The Commission encourages                          clicking on the links or querying the
                                               issuances and submittals in specific                    electronic submission of protests and                 docket number.
                                               dockets. This can reduce the amount of                  interventions in lieu of paper using the                 Any person desiring to intervene or
                                               time you spend researching proceedings                  ‘‘eFiling’’ link at http://www.ferc.gov.              protest in any of the above proceedings
                                               by automatically providing you with                     Persons unable to file electronically                 must file in accordance with Rules 211
                                               notification of these filings, document                 should submit an original and 5 copies                and 214 of the Commission’s
                                               summaries, and direct links to the                      of the protest or intervention to the                 Regulations (18 CFR 385.211 and
                                               documents. Go to www.ferc.gov/docs-                     Federal Energy Regulatory Commission,                 385.214) on or before 5:00 p.m. Eastern
                                               filing/esubscription.asp.                               888 First Street NE, Washington, DC                   time on the specified comment date.
                                                  Finally, public sessions or site visits              20426.                                                Protests may be considered, but
                                               will be posted on the Commission’s                         This filing is accessible on-line at               intervention is necessary to become a
                                               calendar located at www.ferc.gov/                       http://www.ferc.gov, using the eLibrary               party to the proceeding.
                                               EventCalendar/EventsList.aspx along                     link and is available for electronic                     eFiling is encouraged. More detailed
daltland on DSKBBV9HB2PROD with NOTICES




                                               with other related information.                         review in the Commission’s Public                     information relating to filing
                                                                                                       Reference Room in Washington, DC                      requirements, interventions, protests,
                                                 Dated: February 20, 2018.                             There is an eSubscription link on the                 service, and qualifying facilities filings
                                               Kimberly D. Bose,                                       website that enables subscribers to                   can be found at: http://www.ferc.gov/
                                               Secretary.                                              receive email notification when a                     docs-filing/efiling/filing-req.pdf. For
                                               [FR Doc. 2018–03822 Filed 2–23–18; 8:45 am]             document is added to a subscribed                     other information, call (866) 208–3676
                                               BILLING CODE 6717–01–P                                  docket(s). For assistance with any FERC               (toll free). For TTY, call (202) 502–8659.


                                          VerDate Sep<11>2014   17:58 Feb 23, 2018   Jkt 244001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\26FEN1.SGM   26FEN1



Document Created: 2018-02-24 01:00:18
Document Modified: 2018-02-24 01:00:18
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 8255 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR